The invention relates to a
pile fixing frame structure constructing process. The
pile fixing frame structure constructing process comprises the following processes: blanking and
cutting, assembling, rolling a cylinder,
welding, prefabricating jig frames, scribing and controlling overall construction precision, constructing a gear rack lifting area structure, performing segmented assembling constructing on a
pile fixing frame, and
machining the pile fixing frame. The pile fixing frame structure constructing process has the advantages that the constructing process disclosed by the invention is realized through blanking and
cutting, assembling, rolling the cylinder,
welding, prefabricating the jig frames, scribing and controlling overall construction precision, constructing the gear rack lifting area structure, performing segmented assembling constructing on the pile fixing frame and
machining the pile fixing frame in a constructing process of the pile fixing frame; and the construction is reasonable and accurate,
rework is avoided, and the segmented making precision of the pile fixing frame is controlled, so that the construction quality is ensured.