The invention discloses a mounting and demounting method of a safety plugging structure. The mounting and demounting method comprises the following steps that (1) raw materials are prepared, specifically, a pipeline needing to be plugged is measured according to the field environment, and required plugging raw materials are calculated; (2) first sand bags are piled, specifically, the raw materials are manually transmitted into the pipeline through an inspection well, and meanwhile, the sand bags are piled in the pipeline in the
water flow direction; (3) a plugging block is constructed, specifically, the plugging block is constructed on the rear parts of the first sand bags in the
water flow direction; (4) second sand bags are piled, specifically, the sand bags are piled on the rear part of the plugging block in the
water flow direction; and (5) plugging demounting is conducted, specifically, through protection of the second sand bags, the upper half part of the plugging block is demounted, then the second sand bags are moved away in sequence, then through protection of the first sand bags, the
lower half part of the plugging block is demounted, finally, the first sand bags are moved away in sequence, thus whole plugging demounting work can be completed, wherein the inner
diameter of the pipeline is set to be H1, the piling height of the sand bags is set to be H2, the height of a plugging wall is H3, H1 is equal to H3, and H1 is greater than 2*H2.