A flood diversion
pipe band group of a dam for above standard flood belongs to the technical field of
hydraulic engineering of dam flood diversion. In case that above standard flood comes, the flood diversion
pipe band group is capable of realizing flood diversion to prevent an embankment from
bursting; and the flood diversion
pipe band group has the advantages of simple structure, finalized design and production, convenient transportation, fast construction, and low manufacturing cost. The flood diversion pipe band group comprises inlet
hafnium U-shaped grooves, cage type trash racks, HDPE flap valves, flood diversion pipe bodies, outlet
hafnium U-shaped grooves,
water delivery bands each having a rigid framework and made of an artificially synthesized material, aprons of a geotechnical synthetic material, sandbag baffle sills, and color strip cloth sandbag scour prevention sections; the flood diversion pipe bodies along with the
water delivery bands each having the rigid framework and made of the artificially synthesized material are arranged at equal distances and in parallel, and therefore, the flood diversion pipe band group of the same flood diversion point is constructed as required. The flood diversion pipe band group is arranged dispersedly along two sides, and capable of implementing temporary controllable flood diversion to a farmland at any place without permanently occupying the
cultivated land; no special flood retarding basin is needed, and great calamity caused by concentrated flood diversion, and high-investment whole-line flood fighting can be avoided; the detachable and combinable flood diversion pipe band group can be quickly constructed when flood diversion is needed during flood-fighting and emergency rescues, and is convenient to use and manage.