The invention belongs to the field of
electric power system dispatching, and discloses a water-fire-
electricity system trans-provincial peak-regulating
load distribution method. According to the water-fire-
electricity system trans-provincial peak-regulating
load distribution method, the method is based on the characteristics of load changes of a plurality of provincial level power grids, a load sequencing strategy is brought in, and each
power grid load sequencing position of time frames serves as
heuristic information to conduct
force output distribution. According to the technical scheme of the water-fire-
electricity system trans-provincial peak-regulating
load distribution method, the initial electricity receiving and
force output process of each
power grid is acquired through successive
load shedding, output force of the time frames corresponding to all grids is accumulated, a
time frame set going against the
power station electric power balance limit is confirmed; as to any output force positive deviation
time frame, a
power grid with the maximum surplus load order position value is searched, the
power output force of the grid at the
time frame is further reduced, and meanwhile a
negative deviation time frame with the maximum surplus load value is confirmed; the output force of the time frame is increased according to the same amplitude, and the
force output process is repeated until all time frames satisfy the
electric power balance limit. According to the water-fire-
electricity system trans-provincial peak-regulating load
distribution method, a target function does not need to built, the amount of optimizing calculation is substantially reduced, an optimizing result satisfying actual
engineering requirements can be fast acquired, and the method is achievable, and has important theoretical and practical significance in regulating and controlling large power grid electricity
resource distribution and relieving increasingly-serious power peak regulation pressure.