Water-fire-electricity system trans-provincial peak-regulating load distribution method
A technology of load distribution, water and thermal power, applied in the direction of single-network parallel feeding arrangement, etc., can solve problems such as unsatisfactory results, and achieve the effect of solving complex coordination problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be further described below in conjunction with embodiment. Power grid peak regulation aims to adjust the peak load process, so it can follow the principle of arranging power plants to generate more power during high load periods, and optimize the distribution of power plant output among multiple power grids, so that the output process of each power receiving grid is basically in line with the load level trend of the corresponding power grid Keeping the same, this idea of searching and solving makes the present invention not need to construct the objective function, thereby significantly reducing the workload of problem solving. The specific steps are described as follows:
[0034] Step 1: Determine the initial solution. According to the power received by each power grid, the initial power output process is determined by successive load shedding, which can meet the given power control requirements, but most of the time violates the power bal...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com