Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

40results about How to "Reduce revisions" patented technology

Method and device for map route compilation

The invention provides a method and a device for map route compilation. The method comprises that a graph container is disposed according to a canvas element, and a canvas label is disposed for the graph container; a map route graph of a picture format which can satisfy browser supporting is acquired and put into the graph container; input compilation information is acquired by a DOM object of the canvas label; and the map route graph in the graph container is compiled according to the compilation information. By the embodiment of the invention, modifications of the method and the device for the map route compilation can be minimized during implementation, a user's demands can be satisfied in a short time, efficiency of the map route compilation can be increased, and time for the map route compilation can be shortened.
Owner:北京鸿享技术服务有限公司

Data migration method and apparatus and storage device

The present invention provides a data migration method and apparatus and a storage device. The first data is stored at a first storage address, a first virtual address is recorded in metadata of the first data, and a first mapping relationship is provided between the first storage address and the first virtual address. The method includes: the storage device migrates the first data from the firststorage address to a second storage address; the storage device adjusts the first mapping relationship to a second mapping relationship, the second mapping relationship being a correspondence relationship between the second storage address and the first virtual address. After the first data migration, the method does not need to modify the storage address in the metadata of the first data, therebygreatly improving the management efficiency of the metadata.
Owner:HUAWEI TECH CO LTD

A virtual asset data processing method and device

The invention provides a virtual asset data processing method, which comprises the following steps of after receiving a settlement operation instruction for virtual assets, obtaining transaction details and clearing details of the virtual assets, wherein the transaction details comprise request transaction data of a plurality of virtual asset accounts, and the clearing details comprise the actualtransaction data of the virtual asset accounts; for each virtual asset account, based on the request transaction data and the actual transaction data of the virtual asset account, calculating the actual difference value data of the available balance of the virtual asset account, and then using the actual difference value data of the available balance of each virtual asset account to modify the respective virtual asset available balance of each virtual asset account. Therefore, compared with an existing settlement mode, the method does not comprise two times of modification on the available balance in the first-time impact process, and the number of times of modification on the available balance is reduced, so that the processing efficiency is improved, and the waste of processing resourcesis reduced. The advantages are more obvious under the condition of more transaction request data.
Owner:HUNDSUN TECH

Cascade power station mid-downstream power station warehouse-in flow prediction method

The invention discloses a cascade power station mid-downstream power station warehouse-in flow prediction method. The method comprises the steps of selecting variable data having relatively strong correlation with the warehousing flow of the downstream power station; standardizing the data; selecting a data subset proportion alpha range, training a locally weighted linear regression model for different alpha values by adopting cross validation to obtain an error sequence, and calculating a root mean square error RMSE; selecting an alpha value enabling the RMSE to be minimum as an optimal subset proportion value; applying the optimal alpha value to local weighted linear regression to obtain a fitting value sequence of training data and a prediction value y1 of a prediction day; establishingan ARIMA (p, d, q) model for the fitting error of the training data; predicting by using a trained ARIMA model to obtain a predicted value y2; and carrying out inverse standardization processing on y1 + y2 to obtain the reservoir inflow estimated value of the downstream power station of the prediction day. The method can improve the prediction precision of the downstream power station warehouse-in flow and the accuracy of daily output plan making, reduces the number of times of power generation plan modification, and plays a certain positive role in guaranteeing the safe and stable operationof the power station.
Owner:CHINA YANGTZE POWER

Method for improving clock precision in electric energy meter

The invention provides a method for improving clock precision in an electric energy meter. The method for improving the clock precision in the electric energy meter is achieved by arranging a TCXO crystal oscillating unit in a single chip microcomputer of the electric energy meter. The method for improving the clock precision in the electric energy meter comprises the first step that an RTC clock of the single chip microcomputer is configured through an outer RTC source or an inner RTC source; the second step that interruption function second pulse output is arranged on the TCXO crystal oscillating unit; the third step that the current time of the TCXO crystal oscillating is set; and the forth step that the current time is calculated through a counter in the single chip microcomputer.
Owner:WAHLAP TECH CO LTD

Physical simulation method and system based on digital twin for production line

ActiveCN111338300BChange the relatively independent situationRealize virtual and real linkageTotal factory controlProgramme total factory controlProduction lineDynamic models
The physical simulation method and system based on the digital twin of the production line, the physical simulation method includes: determining the layout strategy of the production line; based on the pre-constructed general digital twin model, customizing the digital twin model of the production equipment; real-time interaction between the production equipment and the virtual model; At the same time, test and joint debugging the configuration of the production line; analyze the test and joint debugging results, obtain the defects and simulation of the production line; modify the virtual dynamic model; repeat until the best result is optimized; its system includes: analysis module, production equipment , planning module, physical simulation module, simulation classification module, virtual connection module and model modification module. On the basis of realizing virtual-real linkage, the present invention jointly debugs the physical entity and the virtual model of the production line, so as to comprehensively consider the uncertain factors of the equipment, so that the test results can better guide the modification of the simulation model, reduce the number of model modifications, and shorten the design time. Better design results can be obtained under the premise of cycle.
Owner:GUANGDONG UNIV OF TECH

Method and system for realizing Chinese phonetic input on electronic equipment based on remote controller

The invention relates to a method and a system for realizing Chinese phonetic input on electronic equipment based on a remote controller. The method comprises the following steps of inputting an initial phonetic alphabet through a first-stage keyboard, and switching the first-stage keyboard into a corresponding first secondary auxiliary keyboard according to the input initial phonetic alphabet; inputting a next phonetic alphabet through the first secondary auxiliary keyboard; judging whether remaining phonetic alphabets exist grammatically; if the remaining phonetic alphabets do not exist, selecting corresponding candidate words; if the remaining phonetic alphabets exist, switching the first-stage keyboard into a corresponding second secondary auxiliary keyboard according to the input phonetic alphabet, and inputting a next phonetic alphabet through the second secondary auxiliary keyboard. The system comprises a first phonetic alphabet input module, a switching module and a remaining phonetic alphabet input module. The method and the system for realizing the Chinese phonetic input on the electronic equipment based on the remote controller accord with Chinese phonetic input habits, the system is user-friendly, the Chinese phonetic input speed is increased, and the application range is wide.
Owner:LIANTONG NETWORK COMM TECH INC

Method for enhancing low temperature impact toughness of steel plate applied to railway

The invention provides a method for enhancing low temperature impact toughness of a steel plate applied to a railway. The method aims at the steel plate applied to a railway, wherein the steel plate is not added with a lot of alloy elements and a carbon equivalent of a composition system is kept lower than 0.45. Under nitrogen protection, heating is conducted with a radiant tube, medium-temperature tempering is conducted on the steel plate, and surface oxidation of the steel plate is avoided; through accurate control of tempering technological parameters such as a furnace temperature, a temperature rise rate and thermal preservation time, the steel plate can be heated uniformly, and non-carbide forming elements can be gradually enriched and nodulized, so former unstable carbides can be gradually replaced by more stable carbides; homogeneity of organizational properties is ensured; and stability of the organizational structure is effectively enhanced. In this way, low temperature impacttoughness of a rolled-state delivery thick plate can be effectively enhanced; a performance percent-of-pass index is increased; an amendment amount of steel plates caused by nonconforming performancecan be reduced; and cost control in batched production can be guaranteed.
Owner:NANJING IRON & STEEL CO LTD

Global flow level network simulation method, system and device

PendingCN114492052AVersatile for simulationLimited reliabilityCAD network environmentDesign optimisation/simulationTime informationCompletion time
The invention discloses a global flow level network simulation method, system and device, and the method comprises the steps: constructing a global simulation network topology architecture to form a simulation environment, generating a simulation task through a task generator, dividing the simulation task into a plurality of stages, and storing each stage of the simulation task into a global variable for global call; the method comprises the following steps: continuously updating time information transmitted by flow objects in a global simulation network topology architecture through a global refreshing strategy, determining a flow event of which the time is shortest for each global flow object, and after the current flow object completes the flow event, calculating flow event completion time expected values of other flow objects through refreshing; global stage information is obtained through a global control strategy, whether all flow objects in a certain stage complete flow events or not is detected, so that the end of the stage of the simulation task is predicted, and a test result of the simulation task is obtained. According to the network simulation scheme provided by the invention, the resource consumption is reduced, the calculation time is shortened, and meanwhile, the simulation correctness is ensured.
Owner:SHANGHAI JIAO TONG UNIV

Metadata updating method and device, equipment and medium

The invention discloses a metadata updating method and device, equipment and a medium, and the method comprises the steps: obtaining a target level corresponding to target metadata corresponding to anupdating instruction when the updating instruction is received, and caching the updating metadata corresponding to the target metadata to a memory of a server where a target SSD is located, wherein the target metadata is metadata obtained by grading metadata in a data file in the target SSD in advance according to the updating frequency of attribute information of the metadata, and the metadata belongs to the same level in the data file is stored in the target SSD in a centralized manner; judging whether the updating metadata reaches a preset updating condition or not; and if yes, writing theupdated metadata into the target SSD. Obviously, due to the fact that the method can greatly reduce the frequency of modifying the target SSD due to metadata updating, the service life of the targetSSD can be remarkably prolonged.
Owner:北京浪潮数据技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products