The invention relates to a method for determining a medium-and-large-
radius track of a two-dimensional small-pre-target-displacement horizontal well. The method sequentially comprises the following steps that the position of a first target spot, the position of a second target spot and the position of a
wellhead are determined, the displacement and the true vertical depth of the first target spot and the displacement and the true vertical depth of the second target spot are obtained, a third-part horizontal segment rail is determined, and the third horizontal segment track extends along a connecting line between the first target spot and the second target spot; a second-part angle-
gain landing track is determined upwards with the first target spot as a
terminal point, and the second-part angle-
gain landing track comprises a first angle-
gain circular-arc segment, an angle-holding linear segment and a second angle-gain circular-arc segment; a reverse angle-building track is determined with the
wellhead as a starting point and the track midpoint as a
terminal point, the reverse angle-building track comprises a plumb shaft segment, a reverse angle-building circular-arc segment, an angle-holding linear segment and an angle-dropping circular-arc segment, and the
radius values of all the circular-arc segments range from 191 m to 286.5 m. According to the method for determining the medium-and-large-
radius track of the two-dimensional small-pre-target-displacement horizontal well, the pre-target displacement is increased through reverse angle building, and the contradiction between the complex ground conditions and well location optimization of the horizontal well with the medium-and-large-radius track can be solved.