Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

77results about How to "Reduce payload" patented technology

Liposomal ciprofloxacin formulations with activity against non-tuberculous mycobacteria

Methods of treatment of NTM lung infections using formulations of liposomal ciprofloxacin. Specific liposome formulations and delivery of such for treatment of respiratory tract infections and other medical conditions, and devices and formulations used in connection with such are described.
Owner:GRIFOLS +1

Backpack load carrying system

A lightweight ergonomic backpack load carrying system adapted to anatomically distributes a backpack load from the shoulders of a user onto the waist region thereof. The backpack load carrying system includes a waist support contoured to fit the waist of a user. A waist support frame extends from the waist support to a return connection. A backpack support frame extends from the return connection forming an acute angle with the waist support frame. A securing mechanism is adapted to secure the backpack load carrying system onto a backpack.
Owner:LICAUSI FR CHARLES

Stud anti-shearing connecting piece for constraining concrete splitting and splitting development

The invention discloses a stud anti-shearing connecting piece for constraining concrete splitting and splitting development. The stud anti-shearing connecting piece comprises a stud for connecting a steel beam flange with a reinforced concrete flange; the stud is fixedly connected with the steel beam flange in bolting and welding modes; a circle of high-strength fine stone concrete is fixedly formed on the periphery of the stud; the strength of the high-strength fine stone concrete is larger than that of concrete poured on the reinforced concrete flange; on the periphery of the high-strength fine stone concrete, one-time surrounding tensile force is applied to the high-strength fine stone concrete and assemblies inside the high-strength fine stone concrete through an anti-tension unit surrounding the high-strength fine stone concrete; and meanwhile, a spiral rib is further arranged on the outer side of the anti-tension unit of the high-strength fine stone concrete, concentrically surrounds the outer side of the high-strength fine stone concrete and is formed in the reinforced concrete flange in a pouring mode. According to the stud anti-shearing connecting piece for constraining concrete splitting and splitting development, the longitudinal shear-bearing capacity of the stud anti-shearing connecting piece can be improved, and the effective load of the stud anti-shearing connecting piece in a steel-concrete combination beam under a serviceability limit state is increased, so that obstacles of the steel-concrete combination beam in the design and application status are overcome.
Owner:曹华

Method for implementing communication and service processing between main and standby system

The invention discloses a method of realizing communication and service handling of a host-standby system. According to the method, if no standby system exists, the host system enters a host operating status without the standby system and handles all services which demand treatment by the host-standby system and carries out monitoring; if the standby system exists, the host-system leaves services with low priority and secondary services to the standby system, sends and receives synchronous configuration data to and from the standby system at the real time, and only handles services with high priority and carries out monitoring; the standby-system receives the synchronous configuration data at the real time and replaces the host system to handle the services with low priority and the secondary services. The invention enables the host-standby system to exert functions reasonably, effectively tests the reliability and stability of the standby system, and decentralizes the system service effectively and reduces the effective load of a single system with the availability of the standby system.
Owner:ZTE CORP

Synchronous head sheave balance adjustment method for multi-rope winding type elevator

Disclosed is a synchronous head sheave balance adjustment method for a multi-rope winding type elevator. When the multi-rope winding type elevator works, a container is elevated by two steel wire ropes through head sheave bodies. In the elevating process of the container, when the force applied to the steel wire rope winding around a head sheave on a hydraulic cylinder is larger, the corresponding head sheave body is downwards compressed through the first hydraulic cylinder, so that the force is reduced, and meanwhile, the steel wire rope is loosened for adjustment to a force balance with the steel wire rope on the other side. When the force applied to the other steel wire rope is larger, the corresponding head sheave body 1 is compressed downwards through the second hydraulic cylinder, so that the force is reduced, and meanwhile, the steel wire rope is loosened. When the force applied to the two head sheave bodies is unbalanced, pressure compensation is generated to the hydraulic cylinders; when the first hydraulic cylinder is compressed, hydraulic pressure pressurizes the second hydraulic cylinder for a balance through a communication device, so that the pressure balance of the second hydraulic cylinder and the first hydraulic cylinder is achieved after pressurization; the tension of the steel wire ropes of the multi-rope winding type elevator can be balanced and compensation can be conducted for non-synchronization flexibly and conveniently.
Owner:LUOYANG MINING MACHINERY ENG DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products