The invention discloses a drilling pouring
pile hole formation one-
pile double-
machine construction method, comprising the following steps: both an upper clay layer and a completely weathered rock layer use a rotary drilling rig to
drill; the rotary drilling rig at a
pile position is mounted; a
cutting tool for is welded on the drilling bucket edge of the rotary drilling rig, and is driven by the rotation of a telescopic drilling stem to
cutting the soil layer rotatablely. The rotary drilling rig can
drill in
dry soil or
drill with
slurry. When reaching a strong or middle weathered rock layer, the rotary drilling rig is replaced to a
gyration drilling rig; a special
alloy roller drill is mounted on the
gyration drilling rig; a forward or backward circulation drilling process is utilized;
mortar circularly protects the wall; the drilling operation is executed until the designed hole depth is reached; and an
air compressor is used for clearing the hole or the
mortar replacement is used for clearing the hole. The method of the invention is simple, economic and practical; besides, the method also improves 50 percent of the drilling speed, shortens the hole formation time, lowers the hole formation cost, decreases the
power consumption, saves the energy, reduces the discharged
mortar, reduces the environmental
pollution, and improves the hole formation quality and the quality of pile foundation
constriction of the integral building work.