The invention discloses a prefabricated sleeve
pipe pile capable of eliminating the
friction force of a swelling-shrinking soil layer, and a construction method thereof, belongs to the field of civilconstruction
engineering, and aims at solving the technical problems of small
pile diameter, high construction difficulty, low
bearing capacity, limited application range and the like in an existing sleeve
pipe pile. The prefabricated sleeve
pipe pile capable of eliminating the
friction force of the swelling-shrinking soil layer comprises an outer sleeve pipe, an annular supporting plate and a
steel ball, wherein a prefabricated upper pile body is arranged in the outer sleeve pipe, the
steel ball is filled into the upper part of the prefabricated upper pile body, and the lower end of the steelball is supported by the annular supporting plate; and the outer sleeve pipe and the prefabricated upper pile body are located in the swelling-shrinking soil layer, a prefabricated lower pile body isarranged at the lower end of the prefabricated upper pile body, and the prefabricated lower pile body is arranged in a stabilized soil layer. According to the prefabricated sleeve pipe pile capable of eliminating the
friction force of the swelling-shrinking soil layer, and the construction method thereof, the side friction force of the upper section of the prefabricated pile is isolated by the outer sleeve pipe, and an outer sleeve pipe shell is capable of moving along with the swelling-shrinking soil layer, so that the harmful deformation caused by the changed side friction resistance is dissipated; and the lower section is located in the stabilized soil layer, and the friction force and the end-bearing force of the stabilized soil layer can be adequately utilized, so that the needed
bearing capacity is provided for an upper structure.