Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

2387results about How to "Reduce operational risk" patented technology

Transmission line inspection system based on multi-rotor unmanned aircraft

The invention discloses a transmission line inspection system based on a multi-rotor unmanned aircraft, which comprises the multi-rotor unmanned aircraft and a ground support system, wherein the multi-rotor unmanned aircraft comprises an aircraft body, an airborne flight control system, an airborne task system and an airborne power supply for supplying power to all the electronic devices; the aircraft body comprises a body, an undercarriage fixedly connected below the body, and a plurality of rotor components which are symmetrically distributed on the periphery of the body; the airborne flight control system comprises a flight navigation and control part, a transmission line anti-collision warning and control part, and an airborne end used for remotely controlling a telemetry data chain; the airborne task system comprises a damping nacelle, an image acquiring device arranged on the damping nacelle, and the airborne end for a wireless image transmission chain; and the ground support system comprises a ground end for remotely controlling the telemetry data chain, a flight monitoring system, the ground end for a wireless image transmission chain, and an image monitoring system. The transmission line inspection system has a reasonable structure, is easily realized, and has high engineering application value.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Transformer substation field operation management and control system and method based on three-dimensional dynamic modeling

ActiveCN111091609AConsistent device stateGraphical effect displayData processing applicationsAnimationSimulation trainingDigitization
The invention relates to a transformer substation field operation management and control system and method based on three-dimensional dynamic modeling. The method comprises the following steps: performing three-dimensional dynamic modeling on a transformer substation; accurate positioning; based on the three-dimensional digital model, carrying out intelligent management and control on an operation site through intelligent identification and early warning; based on a three-dimensional digital model, performing live-action rehearsal and equipment simulation training on typical production operation and safety accidents through a virtual reality system. According to the invention, visual data support is provided for field operation work and personnel training work; real-time positioning and track checking of personnel and equipment are realized, and visual technical support is provided for remote intelligent management and control; an intelligent management and control means is provided for field operation safety, dynamic simulation of an operation task plan, typical operation, dynamic rehearsal of safety accidents and disassembly and reassembly analogue simulation of typical equipment are achieved, a visual simulation scheme is provided for field operation, operation risks are reduced, immersive training experience is provided, and training efficiency is improved.
Owner:云南电网有限责任公司保山供电局

Method for rapidly detecting pipeline body defects

The invention relates to a method for rapidly detecting pipeline body defects, which comprises the followings steps sequentially: 1) getting the specification, a support system, an anti-corrosion layer, the temperature, the corrosion degree, the pipeline layout and the historical information of a pipeline to be detected; 2) selecting a sensor ring, cleaning the surface of the pipeline to be detected, and inspecting and calibrating a detection system; 3) detecting each section of pipe on the ground only once, investigating with emphasis if problems are found, and determining detection times and positions of the buried pipelines according to different anti-corrosion layers and transmission media; 4) analyzing and diagnosing: labeling the basic properties of the pipeline, calibrating curves, comparing reflected signals and detection data in different positions, analyzing the variable frequency, diagnosing in a method of analyzing data in the same position in a superposition mode, observing the circumferential positions of the defects and classifying the degrees of the defects; and 5) determining a verification test pit and a detection test pit and analyzing pipe sections in the detection test pit according to diagnosis results, marking the positions of the defects, observing corrosion condition, measuring thickness, and finely scanning the defects to determine the positions, the properties and the sizes of the defects.
Owner:PIPECHINA SOUTH CHINA CO

Storage mildew-proof and moth-proof packaging hemp cloth and preparation method thereof

The invention provides storage mildew-proof and moth-proof packaging hemp cloth and a preparation method thereof. The hemp cloth comprises green harmless storage protective agent and is prepared by taking common packaging hemp cloth as a material and adding 0.01-10wt% of storage protective agent. The preparation method comprises the following steps of: dissolving the storage protective agent in a solvent to prepare a solution, then impregnating the hemp cloth in the protective agent solution, removing the solution after the hemp cloth sufficiently absorbs the solution, and drying; or dissolving the storage protective agent in the solvent, then uniformly spraying the protective agent solution on the hemp cloth and drying the hemp cloth after the hemp cloth sufficiently absorbs the protective agent solution to prepare the storage mildew-proof and moth-proof packaging hemp cloth. The storage hemp cloth is used for packaging tobaccos or crops, can realize the whole process dynamic and real-time protection of the tobaccos, the crops and the like in purchase, transport and storage processes, protect products from mildew and moths, effectively prevent the mildew and the moths from spreading between bags and prevent the tobaccos, the crops and the like which are soaked by rain water from mildewing. Besides, the invention has an important function for reducing environment pollution and hidden safety danger which are caused by common technologies.
Owner:ZHENGZHOU UNIV

Large grid real-time scheduling method for accepting access of wind power

The invention relates to a large grid real-time scheduling method for accepting access of wind power, which belongs to the technical field of power system operation and control. The method comprises: according to the characteristics of wind power and load fluctuation and the control characteristics of generator sets, classifying the generator sets in the whole grid; acquiring the current plan, real-time output, connecting line plan, numerical weather prediction and other related information of each generator set; performing ultrashort period load prediction and wind power output prediction towork out the output regulation amount at next moment of real-time scheduling generator sets and construct an active real-time scheduling model with the smallest wind loss; working out the output regulation amount of the real-time scheduling generator sets including the wind power generator sets by using a simplex method; and transmitting the next output regulation amount of thermal power generator sets directly, and giving the output maximum value at next moment of the wind power generator sets. In the invention, the combined optimized scheduling of the wind power generator sets and traditional generator sets is performed to eliminate wind power generation prediction deviation and load prediction deviation in advance, so the wind power accepting capability of a power grid is improved to the maximum extent while the operation economy of the power grid is guaranteed.
Owner:TSINGHUA UNIV

Comprehensive electroplating wastewater treatment method

The invention relates to a comprehensive electroplating wastewater treatment method. The electroplating wastewater is divided into six brand-new classes, a chemical and biochemical combined process is adopted, a separate system drainage pipe network is adopted, the electroplating wastewater is divided into ink wastewater, complex wastewater, pretreatment wastewater, cyanogen-containing wastewater, chromium-containing wastewater and common electroplating wastewater, the six classes of wastewater respectively flows into respective underground adjusting tank through the pipe network, and is treated by respective process, and the effluent is discharged after reaching a standard. Because of the scientific water separating and stepwise pretreatment of a front-end chemical treatment part, different pollutants are respectively removed in different process sections according to characteristics, crossed enrichment and mutual reaction of the different pollutants are reduced to the greatest extent, and the pressure of microorganisms in the biochemical process is reduced. Treatment facilities for the six classes of wastewater are mutually connected and relatively dependent, and when inlet water quality fluctuates, a corresponding section is only required to be adjusted, the whole process is not influenced, the management is scientific and orderly, and operational risks are reduced.
Owner:SHENZHEN YINTAI ENVIRONMENTAL PROTECTION ENG TECH +2

Mining analyzing and fault diagnosis system of rail transit monitoring data

The invention discloses a mining analyzing and fault diagnosis system of rail transit monitoring data, and relates to the technical field of railway signals. The system comprises a signal monitoring system data processing unit, a data analyzing unit, a knowledge base unit and a fault diagnosis unit, wherein the signal monitoring system data processing unit is used for acquiring history railway signal monitoring data and real-time railway signal monitoring data from an on-site centralized signaling monitoring (CSM) device in each electric service workshop or work area. The data analyzing unit is used for analyzing the history railway signal monitoring data acquired by the signal monitoring system data processing unit, and generating fault diagnosis rules. The knowledge base unit is used for storing judging standards, and storing the fault diagnosis rules of the data analyzing unit, wherein the judging standards are formulated according to the work principle of each railway signal device and national and industry standards and specifications in the railway signal field and are used for fault diagnosis. The fault diagnosis unit is used for generating fault diagnosis results according to the fault diagnosis rules and the judging standards as for the real-time railway signal monitoring data acquired by the signal monitoring system data processing unit.
Owner:BEIJING TAILEDE INFORMATION TECH

Punching production line for punching circular tube type workpiece

The invention discloses a punching production line for punching a circular tube type workpiece. The punching production line comprises a press machine, wherein a moving mechanism and a feeding mechanism are assembled on an operating platform of the press machine, the moving mechanism sequentially clamps the circular tube type workpiece from one station to another station, and the feeding mechanism conveys the circular tube type workpiece from the outside to an initiation position from where the moving mechanism clamps; a first side punching lower die, a first circular tube type workpiece rotating mechanism, a second side punching lower die, a circular tube type workpiece shaping lower die and a discharging mechanism which discharges a circular tube type workpiece out of the operating platform of the press machine are at least assembled on the operating platform of the press machine below the moving mechanism; a first drive and a pressing component which are matched with the first side punching lower die and a second drive and the pressing component which are matched with the second side punching lower die are assembled on a sliding block of the press machine; and a press-in component which is matched with the shaping lower die is arranged. According to the punching production line, one press machine can be used for simultaneously carrying out multiple processing on the circular tube type workpiece, the production efficiency and automation degree are high, and the labor intensity and operation risk of operators are effectively reduced.
Owner:厦门锻压机床有限公司

Digital underground layering water injection testing and adjusting process pipe column and operation method thereof

The invention discloses a digital underground layering water injection testing and adjusting process pipe column and an operation method thereof. According to the purpose, the instantaneous flow rate and the accumulative total injection rate of a single reservoir stratum can be monitored and recorded in real time underground, pressure of the reservoir stratum is monitored in real time, underground well shut-in layering pressure drop is tested, and bi-directional transmission of data and orders between a down-hole and the ground is carried out in a wireless mode. The process pipe column is formed by connecting a multistage digital water distributor and an Y344 water injection packer through an oil pipe, and eliminates steps of testing and allocating steel wires of the flow rate compared with an existing water distributor and a packer used for layering water injection. Meanwhile, the instantaneous flow rate and the accumulative total injection rate of the single reservoir stratum can be monitored and recorded in real time underground, the pressure of the reservoir stratum is monitored in real time, and the underground well shut-in layering pressure drop is tested. The pipe column can greatly reduce workloads of matching tests and pressure-drop tests of an oil field layering water injection well, provides the true and reliable accumulative total injection rate of the single stratum, and provides reliable evidence for policy adjustment of the oil field development technology.
Owner:PETROCHINA CO LTD

Real-time adjustable and controllable hanging type underground oil and water separating system

The invention discloses a real-time adjustable and controllable hanging type underground oil and water separating system, which comprises an underground sleeve pipe, a water injection oil pipe, an oil extracting oil pipe and a flow rate control valve, wherein the flow rate control valve is arranged at the wellhead part, the aboveground ground is provided with a visual control device, a hanging type three-way joint connected with the oil extracting oil pipe, an oil and water separator and the water injection oil pipe is arranged in the sleeve, the oil and water separator is connected with an electric submersible pump unit, a water injection pressure regulating device is arranged on the water injection oil pipe, a flow rate and pressure monitoring instrument is arranged in the electric submersible pump unit, a flow rate and pressure monitoring instrument and a regulating valve are arranged in the flow rate control valve, monitoring instrument cables and signal transmission cables are respectively connected among the electric submersible pump unit, the water injection pressure regulating device, the flow rate control valve and the visual control device, the visual control device converts received real-time flow rate and pressure signals into visual data to be output, and the work of the whole system is regulated and controlled. The hanging type underground oil and water separating system has the advantages that the stability is high, the treatment capability is high, and the hanging type underground oil and water separating system can be widely applied to an oilfield same-well production injection process.
Owner:CNOOC ENERGY TECH & SERVICES

Model predication control based cooling heating and power generation type micro-grid operation method

The invention discloses a model predication control based cooling heating and power generation type micro-grid operation method. The method comprises the steps of building a predication model to predicate the wind power, photovoltaic power and cooling heating power generation load power data within a control time domain in the future; solving a rolling optimizing model at every moment according to the latest predication result and the real-time operation state of each device; calculating the force output of each device at the following time quantum; re-calculating the rolling optimizing model at the next time according to the latest predication result, monitoring the actual wind power value, photovoltaic value, cooling load value, heating load value and power generation load value on real time; updating the historic data; solving and feeding back to correct the model at every 5 minutes to obtain the adjustment of each device; distributing to each device for adjusting until reaching the next rolling optimizing time. With the adoption of the method, the influence of inaccurate predication on the optimal operation of the system can be removed well, thus the system operation risk is reduced, and the system operation stability is improved; meanwhile, the economy of the operation of a cooling heating and power generation type micro-grid can be increased.
Owner:SOUTHEAST UNIV

Method and device for tunnel advance geology forecast with tunnel face blasting as focus

InactiveCN103217703AImprove signal-to-noise ratioUnfavorable Geological Body ForecastSeismic signal receiversCopper wireEngineering
Provided are a method and a device for tunnel advance geology forecast with tunnel face blasting as a focus. The method comprises the steps of (1) drilling holes on two lateral walls at the inlet position in a tunnel; (2) filling a coupling agent into the drilled holes, and attaching weave detectors to the walls of the drilled holes; (3) winding a trigger circuit copper wire on cartridged explosive, and placing the cartridged explosive into a blasted hole of the tunnel face; (4), enabling two three-component weave detectors buried in a tunnel hole to receive reflective earthquake wave signals; (5) sending the signals to an amplifier after the signals are selected by a multi-way switch; (6) enabling the amplifier to amplify the signals and then transmit the signals to an analog/digital (A/D) converter through wireless transmission; (7) enabling a wireless communication module of a control chamber to receive a wireless signal and then transmit the wireless signal to a host, and recording the signal; and (8) achieving geology forecast through an processing program installed in the host. The device comprises signal acquisition, wireless communication and control and a data analyzing system. The method is simple, easy and low in cost, can be used for advance geology forecast of tunnels, holes and roadway underground spaces, and achieves automation and normalization of geology forecast.
Owner:INST OF ROCK AND SOIL MECHANICS - CHINESE ACAD OF SCI

Method and device for robust interval wind power scheduling based on consideration on wind power field current collecting line fault

The invention relates to a method and a device for robust interval wind power scheduling based on consideration on wind power field current collecting line fault. The method includes, from the points of power system dynamic response capacity and section safety, building a worst scene model with consideration on system running safety on the circumstance of wind power field current collecting line m faults; according to the worst scene model, taking the minimum wind curtailment demand as the target to optimize the model and taking the system running safety requirement on the circumstance of the worst wind power output as a constraint condition to build a robust dual-layer wind power mixed integer interval optimization model; according to a variable equivalent substitution method and a strong dual principle of linear programming, transforming the robust dual-layer wind power mixed integer interval optimization model into the problem about single-layer secondary programming, and utilizing an interior point method to solve the optimal thermal power output planned value and the maximum wind power planned interval; and finally performing wind power scheduling according to the optimal thermal power output planned value and the maximum wind power planned interval so as to achieve the robust interval wind power scheduling.
Owner:STATE GRID CORP OF CHINA +1

Intelligent monitoring and early warning method for elevator brake

PendingCN107814288AImprove the level of safety supervision and managementImprove the level of safe useBrake typesElevatorsMachinePredictive maintenance
The invention discloses an intelligent monitoring and early warning method for an elevator brake. The method comprises the following steps of 1, a hardware structure of an elevator brake intelligent monitoring and early warning system is built in an elevator machine room; 2, small sample monitoring data are collected, feature vectors of signals are decomposed, reconstructed and extracted through awavelet packet, and a health mode library is built; 3, the running state of the elevator brake is monitored in real time, and early warning is carried out on faults possibly occurring through an SVMclustering analysis algorithm; and 4, according to a fault prediction result, maintenance personnel of an elevator are guided to adjust and optimize the maintenance plan, predictive maintenance is carried out, the faults of the brake are eliminated in a sprouting state, and accidents are avoided. According to the intelligent monitoring and early warning method, key parameters like an elevator brake gap, the abrasion amount of a brake shoe, a brake distance, a brake coil voltage, a traction machine working current, brake temperature, noise are monitored in real time through a non-contact type measuring method, data mining and analysis are carried out on the large amount of monitoring data, so that fault hidden danger of the elevator brake is predicted in time, and safe operation of the elevator is guaranteed.
Owner:南京市特种设备安全监督检验研究院

Large grid active power real-time control method in restricted wind power state

The invention relates to a large grid active power real time control method in a restricted wind power state, and belongs to the technical field of operation and control of electric systems. The method comprises the following steps: firstly obtaining the current restriction quantity of a wind power field by using a benchmark dynamo method or a theoretic estimation method according to wind speed data, acquired in real time, of the wind power field and relative parameters of a generator; and then establishing a model in active real time control by the system according to the minimum wind-abandoning principle, optimizing and solving the model by using a suggested solving algorithm to obtain the current maximum absorptive wind power quantity of the system and an optimal adjusting strategy of other water-fire generator systems, and interpolating the obtained adjusting strategy by using a difference value method so as to be compatible with the existing ACE (access control entry) order format. The method provided by the invention has the following advantages: a real-time control loop using the minimum wind-abandoning loss as a target is added between a real-time plan and the ACG (application control gateway) control, so as to implement the joint optimization scheduling of the wind power and the traditional unit through the wind power field wind-abandoning quantity obtained by real-time computation, so that the wind-abandoning electric quantity caused by the prediction error of wind power generation is maximally reduced, and to the accepting capability of the grid to the wind power is furthest improved while the economical efficiency of the grid operation is ensured.
Owner:TSINGHUA UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products