The invention discloses a fully-fabricated underground
pipe gallery and
underground space co-constructed PEC
composite structure and a construction method, and the PEC
composite structure comprises a bottom layer
pipe gallery, a soil facing side wall, a middle plate, a top plate and a PEC beam; the bottom layer
pipe gallery is formed by splicing a plurality of
reinforced concrete pipe gallery precast blocks, the soil facing face side wall is formed by splicing a plurality of combined side wall plates, each combined side
wall plate comprises a
reinforced concrete plate and an H-shaped steel column, and the bottom of each H-shaped steel column is connected with a channel steel connecting piece embedded in the top face of the corresponding
reinforced concrete pipe gallery precast block. A PEC beam is rigidly connected between the top ends of every two H-shaped
steel columns at intervals on the same side; the middle plate is formed by splicing a plurality of combined middle plates, the top plate is formed by splicing a plurality of combined top plates, each combined top plate comprises a reinforced concrete plate and a steel beam, and the steel beams are in equal-strength connection with short beam connectors on the H-shaped
steel columns. Compared with a common full-prefabricated
assembly type concrete structural member, the prefabricated
assembly type concrete structural member has remarkable progress in the aspects of design, construction, operation and maintenance, and has remarkable
social benefits, economic and environmental benefits and popularization value.