The invention belongs to the technical field of bored
pile foundation construction in infrastructure construction projects such as buildings, highways, railways and municipal construction, and specifically relates to a drilling and grouting integrated device for treating relatively thick
sediment after
pile formation. The device includes hole sweeping devices and a grouting
pipe assembly. The holesweeping devices are arranged on the upper part of the grouting
pipe assembly. The hole sweeping devices comprise the upper hole sweeping device and the bottom hole sweeping device, the upper hole sweeping device is arranged on the upper part of the bottom hole sweeping device, the upper hole sweeping device comprises an upper
drill rod part, upper sweeping holes and an upper hole sweeping
wire rope, a
coupling is fixedly connected with the upper
drill rod part, and the upper sweeping holes are evenly distributed in the upper
drill rod part; the bottom hole sweeping device comprises a bottomdrill rod part, a clamping piece and a bottom hole sweeping
wire rope, the bottom hole sweeping
wire rope is fixed to the bottom drill rod part, the bottom hole sweeping wire
rope is fixedly connectedwith the bottom drill rod part through the clamping piece, the bottom drill rod part is arranged on the lower part of the upper drill rod part, the clamping piece is arranged on a lower drill rod part, and the two ends of the clamping piece are welded and fixed to the side wall of the lower drill rod part. The device is simple to manufacture and convenient to use, the risk of handling again afterblind grouting due to poor cleaning of the
sediment at the bottom of the
pile foundation is greatly reduced, and the pile foundation quality defects are treated in one step.