Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

34results about How to "Play an anti-seepage role" patented technology

Magnetic drainage type self-repairing roof insulation board

The invention discloses a magnetic drainage type self-repairing roof insulation board, and belongs to the technical field of insulation boards. According to he magnetic drainage type self-repairing roof insulation board, specially-made crack sensing trigger thorns are arranged, after an outer protection covered edge cracks, sunlight can penetrate through a multifunctional guide pipe to irradiate the surface of a hard heat absorption and conduction layer, elastic balloons expand to extrude an elastic connecting layer, thus, barbs are driven to puncture storage balloons, an automatic repair function is triggered, through the arrangement of repair storage balls, after the storage balloons are punctured, the gas-solid drainage body can flow to the cracking position through spherical grooves, circulation holes and the multifunctional guide pipe, so that the liquid repair body is guided to flow to the cracking position, after the crack repairing glue in the liquid repair body is cured at the cracking position, the crack can be repaired, therefore, the purpose of automatic repair is achieved, a series of troubles and dangers caused by manual repair are effectively avoided, the practicability is greatly improved, and the arrangement of the storage grooves, an expanding agent and an elastic diaphragm is beneficial to the flowing of the liquid repair body to the cracks.
Owner:张丽霞

Method for preventing seepage of dam

Dam concrete for hydraulic and hydro-power engineering is a porous material. When a dam stores water, the concrete of the dam body has the seepage phenomenon easily under the action of pressure of heading-up water level. A method for preventing the seepage of the dam comprises that: the whole upstream concrete surface of the dam is treated by a plurality of working procedures, so that the surface defects of the dam are fully exposed; and a layer of cementitious capillary crystalline waterproofing material (shown as the attached drawing 2 in the abstract) covers on the concrete surface by a brushing or spraying process, and active molecules in the material transmit, fill and generate hydration, so that the material is fully combined with the concrete into a whole, and the anti-seepage effect of the material is obviously improved. Engineering application proves that the process has obviously improved anti-seepage effect of the dam in hydraulic engineering by using the cementitious capillary crystalline waterproofing material, and the cementitious material is fully and effectively combined and absorbed by the surface of the dam, so the anti-seepage, pressure resistance and other performance of the concrete are obviously improved.
Owner:宜昌天宇科技有限公司

Anti-seepage structure for balcony and construction method of anti-seepage structure

InactiveCN110005049AStable structureNot easy to deform and misplaceBalconiesBuilding insulationsEngineeringProtection layer
The invention discloses an anti-seepage structure for a balcony. The anti-seepage structure comprises a waterproof coating layer, a coiled material waterproof layer, an anti-seepage film layer and a protecting layer, the protecting layer comprises a supporting plate layer and a ceramic tile layer which are arranged from bottom to top, the supporting plate layer is formed by supporting plates in anassembled mode, clamping blocks are arranged on the corners around the top face of each supporting plate correspondingly, the ceramic tile layer is formed by ceramic tiles in an assembled mode, clamping grooves are formed in the corners around the bottom face of each ceramic tile correspondingly, and the clamping blocks and the clamping grooves are matched. A construction method comprises the following steps of (1) base layer treatment, (2) treatment of the waterproof coating layer, (3) laying of the coiled material waterproof layer, (4) layering of the anti-seepage film layer and (5) layingof the protecting layer. The anti-seepage structure for the balcony is ingenious and reasonable in overall structural design, through the anti-seepage structure, the anti-seepage effect of the balconycan be improved effectively, the protecting layer is divided into the supporting plate layer and the ceramic layer, the waterproof effect of the balcony can be further improved under the situation ofensuring the surface attractive degree of the balcony, and the upper ceramic tile layer can also be conveniently laid through the supporting plate layer.
Owner:ZHEJIANG COLLEGE OF CONSTR

Water storage type grass planting brick for municipal environmental protection and laying method thereof

The invention discloses a water storage type grass planting brick for municipal environmental protection and a laying method thereof, and belongs to the technical field of grass planting bricks and laying. The water storage type grass planting brick for municipal environmental protection comprises a brick body, wherein a gravel permeable layer and a geotextile layer are laid on the upper end of the brick body in sequence. An annular permeable cavity, a water storage cavity and a grass planting hole which communicate with one another are formed in the brick body, the water storage cavity is used for collecting natural rainwater and slowly releasing the natural rainwater into the grass planting hole so as to provide moisture nutrients for vegetation grass, and a high-strength water retentioncone is embedded into the corner in the grass planting hole, so that one one hand, a water retention effect is achieved on water guided into the grass planting hole, on the other hand, a fastening effect is achieved on planting soil and the vegetation grass which are filled in the grass planting hole, and the water in the grass planting hole is effectively prevented from running off too fast; anda semicircular water cavity and a diversion hole which communicate with each other are formed, so that the natural rainwater can be conducted and evacuated as soon as possible during excessive rainfall, and excessive rainwater is not easy to remain on the surface of the brick.
Owner:鄂州市国伟建材有限责任公司

Anti-floating anchor rod pile and construction method

The invention discloses an anti-floating anchor rod pile. The anti-floating anchor rod pile comprises a pile body arranged in a drilled hole; the pipe body is internally provided with an anchor rod steel bar; a foundation cushion layer is paved on a foundation at the top end of the drilled hole; a concrete foundation is arranged on the foundation cushion layer; a foundation surface-layer steel barnet sheet is arranged at the top of the concrete foundation; the bottom end of the anchor rod steel bar extends to the bottom of the pile body; the top end of the anchor rod steel bar stretches out of the top end of the pile body and extends into the concrete foundation; the top end of the anchor rod steel bar is pressed on the foundation surface-layer steel bar net sheet; a steel plate water stopping sleeve ring sleeves a part, located in the concrete foundation, of the anchor rod steel bar; the pile body is internally provided with arch-shaped positioning brackets at intervals of pre-set height; arch bottoms of the positioning brackets are fixed with the anchor rod steel bar. The invention further discloses a construction method of the anti-floating anchor rod pile. The anti-floating anchor rod pile has the advantages of firm structure and convenience for construction; the pile body is prevented from hole collapsing in a pouring construction process; the anti-floating anchor rod pile has a seepage-proof effect and the use amount of cement is saved.
Owner:CHINA LIGHT IND WUHAN DESIGN ENG +1

Sand stabilization and water locking net suitable for desertified soil

InactiveCN112012190APlay the role of anti-lifting and sand-fixingImprove sand-fixing and water-locking effectSoil preservationSoil scienceEnvironmental engineering
The invention discloses a sand stabilization and water locking net suitable for desertified soil, and belongs to the technical field of soil sand stabilization and water locking. A plurality of lowerembedded water locking bodies and upper anti-raising sand stabilization bodies which are distributed in a staggered manner are arranged at the upper end and the lower end of a sand prevention net, theupper anti-raising sand stabilization bodies achieve an effect of preventing raising and stabilizing sand on the surface layer of the upper end of sandy soil, the lower embedded water locking bodieslocated in the surface layer of the sandy soil are used for naturally locking water under the environment of natural rainfall or manual irrigation, the stored water is guided into the soil through a plurality of capillary drainage pipes, arc-shaped sand grabbing pieces and matching structures of flow guide soil breaking cones and conical seepage-proofing bodies, the balanced and slow wetting on the soil is effectively achieved, through cooperation of embedded rods and the conical seepage-proofing bodies, the seepage-proofing effect is effectively achieved while good sand stabilization is achieved, meanwhile, soil fixing agent permeation bags are arranged in the lower embedded water locking bodies, when water is stored in the lower embedded water locking bodies, soil fixing agents can be released and dispersed into the soil, and the sand stabilization and water locking effects of the soil are further improved.
Owner:王伟

Replacement processing structure and method for water burst channel of underground cavern

PendingCN109538293AReduce external water pressureStable and dryUnderground chambersDrainageKarstEngineering
The invention discloses a replacement processing structure and method for a water burst channel of an underground cavern. The processing structure comprises a grit chamber formed in a rock mass in thewater coming direction of a karst pipeline through expanding excavation, an artificial culvert is arranged behind the grit chamber, and the artificial culvert is communicated with a pipeline in the drainage direction; the karst pipeline is communicated with a drainage ditch in a underground cavern space, and a controllable common drainage system is formed; a connecting channel is formed between the artificial culvert and the drainage ditch, and a bidirectional water quantity control valve is arranged at a channel opening of the connecting channel. After a high-pressure large-flow water burstof the underground cavern is treated through the technical scheme, an original channel is locally changed by the water burst, and the water burst is discharged out of the culvert through the artificial culvert; an anti-seepage consolidation ring around a water burst point bears external water pressure generated by increase of the underground water level and achieves an anti-seepage function; a radial drainage hole is used for pressure relief and drainage guide, and the dryness and stability of the cavern can be guaranteed. The problem of high-pressure large-flow water burst of the undergroundcavern is solved in a short construction period and at low investment.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD +1

Composite foaming geomembrane

The invention discloses a foamed composite geomembrane for water control and seepage control in the project of reservoir, river, road, culverts, dam and the trash treating factory, which is prepared by welding or sticking at least one layer impervious layer (1) and at least one layer foaming layer (2). The connection side-face of impervious layer (1) with the foaming layer (2) can be equipped with a reinforcing layer (3), the impervious layer (1) being made up of high-density polyethylene film or polychloroethylene film, the foaming layer (2) made up of continuous foaming material such as polyphenylacetylene and polyethylene, the reinforcing layer (3) being a braided fabric or net of the glass fibre / polyester / polypropylene. It can avoid the problem of infiltration conduced by that the cutting needle pierces the geomembrane in the construction and usage process, and avoid the problem of stabbing working people. It is soft and elastic, and is facile to use or transport.
Owner:范吉廷

Roll-coating non-slagging water-based chloroprene rubber adhesive and preparation method thereof

The invention discloses a water-based chloroprene rubber adhesive, which is prepared from the following components by mass: 45-80 parts of neoprene latex, 15-40 parts of a styrene-acrylic emulsion, 4-15 parts of a tackifying emulsion, 0.2-2 parts of a pH regulator, 0.1-1 part of a slagging inhibitor and 0.1-0.5 part of a thickening agent. The invention further discloses a preparation method of theroll-coating non-slagging water-based chloroprene rubber adhesive. Compared with the prior art, the invention has the following beneficial effects that: (1) the pH regulator is added, so that the blending stability of the neoprene latex and the styrene-acrylic emulsion can be improved, hydroxyl in the latex can be promoted to crosslink to form a reticular structure, the initial adhesion of the adhesive can be improved, the drying speed can be increased, and an anti-seepage effect can be achieved; and 2) the slagging inhibitor polyborate is added into the formula, so that the mechanical stability of the water-based chloroprene rubber adhesive can be improved by resisting the collision of emulsion particles under a mechanical action, and roll-coating slagging is inhibited.
Owner:HUANGGANG NORMAL UNIV

Anti-seepage and anti-cracking concrete and preparation method thereof

ActiveCN112661446APlay the role of sealing and blocking leakagePlay an anti-seepage roleMetakaolinPre treatment
The invention discloses anti-seepage and anti-cracking concrete and a preparation method thereof. Raw materials of the concrete comprise the following components: 150-200 parts of cement; 260-340 parts of sand; 450-620 parts of aggregate; 60-80 parts of fly ash; 30-50 parts of metakaolin; 11-16 parts of reinforced fibers; 30-45 parts of a water-absorbing elastomer; 2-4 parts of a water reducing agent; and 60-90 parts of water. According to the scheme, the technical prejudice is broken through, the scheme of shielding moisture through pretreatment is adopted, the water-absorbing elastomer is ingeniously applied to a concrete formula, the impermeability of the concrete formula is improved, and meanwhile, the reinforcing fibers are added to improve the cracking resistance of the concrete, so that the concrete in the scheme is good in impermeability and cracking resistance, convenient to construct and high in strength.
Owner:CHINA CONSTR FOURTH ENG DIV INSTALLATION ENG

Road surface structure and construction method thereof

The invention relates to a road surface structure. The road surface structure comprises a road surface bed course, a road surface foundation course and a road-surface surface course, wherein the roadsurface bed course comprises a nickel ore slag layer, a clay layer and a seepage-proof layer; the inner surface of the clay layer is clung to the outer surface of the nickel ore slag layer; the innersurface of the seepage-proof layer is clung to the outer surface of the clay layer; the outer surface of the bottom of the road-surface surface course is clung to the outer surface of the top of the seepage-proof layer; the outer surface of the top of the road surface bed course is clung to the outer surface of the bottom of the seepage-proof layer; water of the outer part passes through the seepage-proof layer and the clay layer in sequence and can enter the nickel ore slag layer; the clay layer and the seepage-proof layer have a dual protection effect, so that toxic metallic elements in thenickel ore slag layer can be effectively prevented from seeping into underground water. Furthermore, the invention further provides a construction method of the road surface structure; the method comprises the following steps: paving the road surface bed course, and paving the road surface foundation course composed of the seepage-proof layer, the clay layer and the nickel ore slag layer; finally,paving the road-surface surface course to finish construction of the road surface structure.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Construction method for eliminating construction joints between basement floor and wallboard

Disclosed is a construction method for eliminating a construction joint between basements floor and a wallboard. The construction method is characterized in that the method includes the following steps: a, carrying out measurement and setting out after concrete pouring of a basement floor cushion; b, arranging a formwork and a wallboard inner formwork at the two sides of the wallboard after installation and acceptance of floor steel bars is qualified; c, carrying out basement floor concrete pouring after acceptance of the formwork and the wallboard inner formwork are qualified; d, removing thewallboard inner formwork and horizontal and vertical construction joints are chiseled after basement floor concrete pouring is completed; e, carrying out steel bar binding of the upper wallboard andtemplate installation; and f, pouring fine stone concrete having a thickness of 200 mm-300 mm with the same label when carrying out wallboard concrete pouring. The construction method has the advantages that the construction steps are reasonable in design, the operation is convenient, the horizontal cold joints are eliminated because of secondary pouring of the wallboard, the appearance effect ofthe horizontal construction cold joints of the basement ( or equipment foundation) wallboard, and a water seepage path is elongated which play a certain anti-seepage effect.
Owner:MCC5 GROUP CORP SHANGHAI

Preparation process of self-drainage concrete block

The invention discloses a preparation process of a self-drainage concrete block, and belongs to the technical field of preparation processes of concrete blocks. A trepanning forming device is arrangedin a cavity of a pouring mold, and after a concrete pouring material is introduced into the cavity through a pouring port, the concrete pouring material covers the whole cavity and wraps the end faceof the trepanning forming device. After demolding, the obtained block body is separated from the cavity and the trepanning forming device. A trepanning structure matched with the trepanning forming device is formed on the block body, so that water drainage of the block body in the using process is facilitated, and a large amount of rainwater can be rapidly dredged to a certain extent. Meanwhile,through cooperation of a pneumatic mechanism and multiple crunching rods on a cavity opening die roller, after the concrete pouring material is poured, pneumatic control is continuously and intermittently conducted, the multiple crunching rods stretch out and draw back in a reciprocating mode back and forth, and therefore a compaction effect on the concrete pouring material is achieved, and the quality of the concrete block is effectively improved.
Owner:洪启华

An improved hybrid dam suitable for tailings pond

ActiveCN103953008BSolve problemsImprove the stability and safety factorBarrages/weirsEngineering
The invention discloses a modified mixed dam applicable to tailings ponds. The dam comprises a dam body, an upstream face impermeable layer, an impermeable tooth groove, a drainage piled rock prism body, an upstream face drainage layer, an upstream face inverted filter layer, an inverted filter tooth groove, a dam outer slope impermeable layer, a dam lower inverted filter layer, a dam lower drainage layer, a drainage pipe, a seepage collection pipe, a dam body and mountain contact surface impermeable layer, and a dam body and mountain contact surface drainage layer, wherein the upstream face impermeable layer is positioned among the dam body, the drainage piled rock prism body and the upstream face drainage layer; the upstream face drainage layer and the drainage piled rock prism body are positioned between the upstream face impermeable layer and the upstream face inverted filter layer; the drainage piled rock prism body is positioned below the upstream face drainage layer; the dam lower inverted filter layer is positioned between the dam body and the dam lower drainage layer; the drainage pipe is positioned in the dam lower drainage layer; the inlet of the drainage pipe is connected with the seepage collection pipe; a gate valve is arranged at the outlet of the drainage pipe; the seepage collection pipe is positioned in the drainage piled rock prism body. The dam has the advantages that local material can be adopted for damming, the damming cost is low, the running is reliable, the maintenance is convenient, and the function is comprehensive.
Owner:CHANGSHA DESIGN & RES INST OF CHEM IND MIN

Leakage-proof concrete

The invention discloses leakage-proof concrete, and relates to concrete for preventing leakage. The leakage-proof concrete comprises cement, sand, stones and water, and the concrete is characterized in that the concrete is obtained by mixing of a fiber filament and bentonite; and the bentonite accounts for 5-15% of concrete components, and the fiber filament accounts for 5-10%of the concrete components; the bentonite is sodium bentonite, and the fiber filament is plant fibers such as sisal fibers and flax fibers; and the length of the fiber filament is 5-50mm. The leakage-proof concrete provided by the invention has the characteristics of reasonable components, a wide application range, an excellent effect and the like, and therefore the leakage-proof concrete belongs to novel leakage-proof concrete which integrates economy and practicability.
Owner:DALIAN UNIV OF TECH

Novel anti-seepage paper cup

The invention relates to the technical field of paper cups, in particular to a novel anti-seepage paper cup. The novel anti-seepage paper cup comprises a paper cup body, wherein the paper cup body comprises a first waterproof layer, a first heat insulation layer, a first reinforcing layer, a fan-shaped paper sheet, a second reinforcing layer, a second heat insulation layer, a second waterproof layer and a printing layer, wherein the first reinforcing layer and the second reinforcing layer are formed by a high molecular layer formed by bonding two layers of high molecular materials and fabric layers evenly arranged in the high molecular layer; each fabric layer is formed by weaving warp yarns and weft yarns; the warp yarns are cotton fibers; the weft yarns are blended by polylactic acid fiber yarns and the cotton fibers; the high molecular layer is a thermoplastic polyurethane resin film; and a 2-3 mm lamination reverse fold is reserved at the side surface bonding position of the fan-shaped paper sheet. The paper cup has the advantages of guaranteeing sanitation, and being excellent in water seepage prevention performance, good in heat insulation performance and high in strength.
Owner:青海瑞鸿纸塑包装制品有限公司

Crop straw based field ditch lining material and laying method thereof

Belonging to the technical field of agriculture, the invention discloses a crop straw based field ditch lining material, which comprises the following components by mass percentage: 1%-7% of straw, 80%-90% of soil, 0.02%-0.06% of a microbial additive, and the balance water. The invention also discloses a laying method of the crop straw based field ditch lining material, and the method includes: crushing straw into segments with a length of 3-8cm, taking soil from a ditch, mixing the substances evenly according to the mass percentage, then laying the evenly mixed mixture on the field ditch surface, conducting mechanical compaction to form a composite layer for lining protection of the field ditch. The field ditch lining material provided by the invention utilizes straw as the skeleton to fix the soil of the composite layer and prevent slope slump, and utilizes the characteristics of easy water absorption and a post-water absorption expansion coefficient greater than soil of straw to reduce the water permeability of the composite layer and reach a seepage-proofing effect.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Top-mounted ultralow-temperature butterfly valve capable of being overhauled on line

The invention discloses a top-mounted ultralow-temperature butterfly valve capable of being overhauled on line, and belongs to the technical field of butterfly valves. A valve body is arranged to be of a structure comprising a main valve body and two detachable auxiliary valve bodies; valve plates corresponding to the two auxiliary valve bodies in position are installed on the two sides of a valverod; due to the arrangement of the two valve plates, the sealing effect of the valve plates is improved; meanwhile, the two valve plates are matched with the two detachable auxiliary valve bodies sothat the auxiliary valve bodies can be detached on line to overhaul the valve plates in the valve body; the butterfly valve does not need to be taken down from a pipeline in the overhaul process, andnormal use of the butterfly valve is not affected; in addition, a compensation cavity is formed in a sealing cavity of a sealing ring on the valve body; a cold expansion compensation layer tightly attached to the inner wall of the sealing ring is arranged in the compensation cavity; and during working in a low-temperature environment, the cold expansion compensation layer expands to a certain extent when meeting cold, so that the sealing ring is pushed to extrude outwards, the sealing degree of the sealing ring and the valve plates is effectively improved, and the sealing effect between the valve body and the valve plates cannot be affected by shrinkage of the sealing ring.
Owner:浙江富技阀门有限公司

Rubber sealing element forming die

The invention discloses a rubber sealing element forming die. The forming die comprises an upper pressing die, an elastic damper is fixedly connected to the side of the lower surface of the upper pressing die, a lower pressing block is fixedly connected to the middle of the lower surface of the upper pressing die, a supporting transverse plate is fixedly connected to the bottom end of the elastic damper, the bottom of the supporting transverse plate is fixedly connected with supporting legs, the upper surface of the supporting transverse plate is fixedly connected with a die wall, and the middle of the upper surface of the supporting transverse plate is sleeved with an anti-sticking device. The invention relates to the technical field of sealing element forming. According to the rubber sealing element forming die, rubber enters the forming die through injection molding, an upper pressing die can compress a plastic block through a lower pressing block to conduct forming of the rubber sealing element, operation is convenient, and construction of workers is facilitated; meanwhile, the height of the anti-sticking device and the height of a detection device are slightly higher than the upper surface of the supporting transverse plate, so that main power can be provided for the device when die pressing is performed through the die, and the energy-saving and environmental protection effects are achieved.
Owner:任林兵

Axial locking joint of glass reinforced plastic pipeline

The invention relates to an axial locking joint of a glass reinforced plastic pipeline. The axial locking joint comprises a bell mouth and a spigot and is characterized in that two O-shaped sealing rings are installed between the bell mouth and the spigot; a glue filling hole is formed on the bell mouth; and resin is filled in the glue filing hole to form a locking sealing ring. According to the invention, by utilizing a resin material which can be rapidly solidified as the locking sealing ring, rapid installation of the glass reinforced plastic pipeline can be realized; simultaneously, axial tension of the glass reinforced plastic pipeline can be born because of bonding strength among the resin, the bell mouth and the spigot; the leakage prevention role can be played; therefore, the axial locking joint has axial constraint; the leakage probability of the pipeline can be reduced; unnecessary thrust mounds can be omitted; and the construction cost and the working times of the pipeline can be reduced; and therefore, the glass reinforced plastic pipeline is applied to being installed in geological variable areas.
Owner:宁夏青龙塑料管材有限公司

Water-storing and seepage-proofing rubber board and preparation method thereof

ActiveCN108929495AEnhance water absorption and storage functionImprove aging resistanceLamination ancillary operationsLaminationWater storageFiber
The invention provides a water-storing and seepage-proofing rubber board and a preparation method thereof. The water-storing and seepage-proofing rubber board provided by the invention comprises a water storage layer and a seepage-proofing layer. Butyl rubber is used as a supporting and connecting material of the water storage layer, cotton thread short fibers subjected to rubber dipping treatmentand water absorbent resin SAP are added, the cotton thread short fibers are disorderly dispersed in the water storage layer, a water transport channel communicating the water absorbent resin with theoutside world is formed, and the water-absorbing and water-storing functions of the water storage layer are enhanced. Butyl rubber is used as a seepage-proofing layer, carbon black and light calciumcarbonate are added, the tear strength and the tensile resistance are improved, and the rubber board has good water seepage-proofing performance. The water-storing and seepage-proofing rubber board isused for planting trees in deserts, and is buried under roots of the trees; in rainy seasons, a large amount of water can be absorbed and stored; in dry seasons, water of the water storage layer canbe supplied for root systems to absorb slowly through the cotton thread short fibers, the application scope of the rubber board is expanded, and guaranteeing is provided for the survival rate of greenvegetation in the deserts.
Owner:SANHE GREAT WALL RUBBER +1

Building method of floor fissure strata tunnel deformation joint anti-seepage structure and anti-seepage structure

The invention discloses a construction method for a ground fissure formation tunnel deformation seam impervious structure, comprising the steps as follows: modified asphalt concrete and reinforced material are prepared as reinforced asphalt concrete flexible plate by a rolling method; the flexible plate is internally provided with resistance wires which are led out and used for expanding the deformation seam and the tunnel diameters at two sides so as to form a primary lining supporting wall rock body; the asphalt concrete flexible plate is arranged on the surface of the primary lining supporting wall rock body; two sides of the deformation seam are respectively poured by end lining with the end surface having two parallel ring-shaped trough; subsequently, the deformation seam is internally provided with reinforcing cage and poured by the asphalt concrete; the deformation seam is filled and sealed; two ends of the resistance wire is led into the tunnel by the deformation seam. The impervious structure constructed by the method of the invention utilizes the rheological property and electric heating of the asphalt concrete, prompts the rheological deformation of the asphalt concrete,and leads the surfaces of the reinforced asphalt concrete panel and the lining structure to generate the relative sliding, so as to adapt for the continuous relative staggering displacement of the adjacent lining structures.
Owner:XIAN UNIV OF TECH

Polyurethane foam dressing and preparation method thereof

The invention provides a polyurethane foam dressing and a preparation method thereof, and relates to the technical field of medical dressings. The polyurethane foam dressing is prepared from the following components in parts by weight: 20 to 30 parts of polyethylene glycol, 15 to 25 parts of toluene diisocynate, 10 to 20 parts of bamboo fiber, 5 to 15 parts of usnic acid, 10 to 25 parts of grapefruit essential oil, 5 to 10 parts of shea butter, 1 to 5 parts of yarrow essential oil and 1 to 5 parts of a foaming agent. The polyurethane foam dressing has a long-acting bacteriostatic effect, can repair skin injury and promote wound healing, is easy to remove and does not cause secondary injury. The preparation method is simple, the synergistic effect of all the components is improved, the use effect of the dressing is better, in addition, the preparation operation is simple and rapid, and the dressing is suitable for large-scale production.
Owner:山东万容生物科技有限公司

Plastering mortar admixture

ActiveCN106630737AImprove continuityReduce local stress phenomenonHydroxypropylmethyl celluloseEther
The invention discloses a plastering mortar admixture. The admixture is mainly prepared from raw materials in percentage by weight as follows: 5%-20% of modified calcium lignosulphonate, 1%-5% of fibers, 20%-50% of bentonite, 30%-60% of fly ash and 10%-20% of an auxiliary material, wherein the auxiliary material is prepared from cellulose hydroxypropyl methyl ether hyprolose, polyvinyl alcohol, lauryl sodium sulfate, sodium gluconate and white sugar. The admixture produced with the technical scheme is low in cost, simple to use, green and environment-friendly and realizes waste recovery; besides, construction operability of mortar is improved, mortar cracking and hollowing of the mortar are greatly reduced and prevented, and mortar strength is improved.
Owner:安阳建工(集团)混凝土外加剂有限责任公司

A kind of water storage anti-seepage rubber plate and preparation method thereof

ActiveCN108929495BEnhance water absorption and storage functionImprove aging resistanceLamination ancillary operationsLaminationTree rootEngineering
The invention provides a water-storing and seepage-proofing rubber board and a preparation method thereof. The water-storing and seepage-proofing rubber board provided by the invention comprises a water storage layer and a seepage-proofing layer. Butyl rubber is used as a supporting and connecting material of the water storage layer, cotton thread short fibers subjected to rubber dipping treatmentand water absorbent resin SAP are added, the cotton thread short fibers are disorderly dispersed in the water storage layer, a water transport channel communicating the water absorbent resin with theoutside world is formed, and the water-absorbing and water-storing functions of the water storage layer are enhanced. Butyl rubber is used as a seepage-proofing layer, carbon black and light calciumcarbonate are added, the tear strength and the tensile resistance are improved, and the rubber board has good water seepage-proofing performance. The water-storing and seepage-proofing rubber board isused for planting trees in deserts, and is buried under roots of the trees; in rainy seasons, a large amount of water can be absorbed and stored; in dry seasons, water of the water storage layer canbe supplied for root systems to absorb slowly through the cotton thread short fibers, the application scope of the rubber board is expanded, and guaranteeing is provided for the survival rate of greenvegetation in the deserts.
Owner:SANHE GREAT WALL RUBBER +1

Structure and Construction Method for Controlling Cracks in Side Wall of Underground Structure

The invention discloses a structure for controlling underground structure side wall cracks, comprising a concrete wall body internally provided with a structural reinforcing mesh, a steel barrel and baffles ; a deformation joint is longitudinally arranged at the concrete wall body; the steel barrel is provided with the deformation joint, the deformation joint is located in the steel barrel, the steel barrel is filled with concrete, the barrel walls on the left side and the right side of the steel barrel are connected with the concrete wall on two sides of the deformation joint to form a whole,the barrel wall on the front side and the rear side of the steel barrel extends out of the concrete wall, and the steel barrel is fixedly connected with the structural reinforcing mesh; and the baffles are fixedly arranged on the left side and the right side of the steel barrel respectively and are perpendicular to the deformation joint. According to the structure, a structural steel bar frame isfixedly connected with the steel barrel, the baffles are used for connecting concrete inside and outside the steel barrel, the steel barrel and the concrete are connected into a whole, and the overall strength and rigidity are improved. The overall safety of the structure is not damaged by insufficient strength or rigidity at the deformation joint position. Construction is simple and convenient,and implementation is convenient.
Owner:THE FIFTH ENG CO LTD OF CHINA RAILWAY NO 10 ENG GRP +1

Flexible connecting and sealing bitumastic impervious structure of tunnel deformation joint and constructing method

The invention belongs to the technical field of anti-seepage construction, and in particular relates to a flexible connecting and sealing bitumastic anti-seepage structure of a tunnel deformation joint and a constructing method, which can ensure the normal use of a subway tunnel under the action of fracture formation of the ground. In the technical scheme, the method comprises the following steps: laying a composite layer of modified asphalt anti-seepage plate, pouring reinforced concrete for lining, setting deformation joints, mounting flexible baffles in the deformation joints, utilizing glass fiber cloth to seal gaps of the baffles, and pouring bitumastics to fill gaps of the deformation joints. The anti-seepage structure constructed in the method has the anti-seepage performance of the composite layer of modified asphalt anti-seepage plate, the extension performance and the anti-seepage performance of the bitumastics, and the blocking function of the flexible baffles. Therefore, the anti-seepage structure can ensure the effective sealing of the joint and prevent the significant water leakage accident while fully adapting to the large-displacement slipping deformation in the positions with the deformation joints of the composite lining structure, and has high economic and social benefits.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products