Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

35results about How to "Fast response to faults" patented technology

Method for switching master-slave back-up route apparatus based on virtual router redundant protocol

InactiveCN1949767AReduce fault response timeAvoid switching conditionsData switching by path configurationComputer hardwareBackup
The invention provides a VRRP-based master- and backup- router switching method, and its kernel: when a master router in VRRP (virtual router redundancy protocol) backup group determines to need to make master and backup swithcing, it actively sends a state change request message and reserves the message in the VRRP backup group, and after all routers in the VRRP backup group receive the message, they at once start competing the master router. On the premise of fully assuring service stability, the invention increases switching speed of master and backup routers in the VRRP backup group and effectively shortens failure response time.
Owner:HUAWEI TECH CO LTD

Ride-through and recovery method for DC short circuit faults of hybrid mmc-based HVDC system

A ride-through and recovery method for DC short circuit faults of a hybrid modular multilevel converter based high-voltage direct current transmission (MMC-HVDC) system, the hybrid MMC including multiple full-bridge sub-modules and half-bridge sub-modules, and the method including: 1) detecting whether a DC short circuit fault occurs, and proceeding to step (2) if yes and continuing detecting if no; 2) realizing ride-through of the DC short circuit fault; 3) detecting whether a DC residual voltage increases, and proceeding to step (4) if yes and continuing detecting if no; and 4) realizing DC short circuit fault recovery.
Owner:HUAZHONG UNIV OF SCI & TECH

Database table backup method and device

The invention provides a database table backup method and device. The database table backup method comprises the flowing steps of (1) obtaining a backup table inventory and generating into a backup table inventory file according to a backup mode; (2) generating into backup tasks according to backup parameter information; (3) generating into an operational control file according to information of the backup tasks; (4) reading the operational control file, judging operational states of the backup tasks and carrying out a step (51) if the operational state is that the backup is unfinished; (51) submitting the backup tasks and starting backing up; (6) performing monitoring scanning on the operational states of the backup tasks until all backup tasks achieve backup. The database table backup method has the advantages of greatly shortening the database backup time and being safe and efficient; enabling interfaces to be integrated and being capable of timely displaying the backup operational states and faults such as abnormal termination; accordingly improving the backup operating speed, speeding up fault response speed and reducing backup operational risks.
Owner:BANK OF CHINA

Mixed-type high-temperature superconducting short trouble current limiter

The invention discloses a short trouble current limiter which is composed of a rectifier bridge, a first protective resistor (Rv), a high-temperature superconducting coil (SL), a switching tube (K), a direct current reactor (Lb), a second protective resistor (Ra) and a protected diode (Da), wherein the rectifier bridge is composed of a first diode (D1), a second diode (D2), a third diode (D3) and a fourth diode (D4); a protective resistor (Rs), the switching tube (K) and the high-temperature superconducting coil (SL) are connected in parallel, and the parallel branch is connected between the first direct current end M and the third direct current end P of the rectifier bridge; the second protective resistor (Ra) and the serial branch of the protected diode (Da) are connected with the direct current reactor (Lb) in parallel, and the parallel branch is connected between the second direct current end N and the third direct current end P of the rectifier bridge. The current limiter is connected with the direct current reactor and the high-temperature superconducting coil on the direct current end of the diode rectifier bridge to realize mutual current limiting.
Owner:INST OF ELECTRICAL ENG CHINESE ACAD OF SCI

Cascaded grid-connected inverter unit fault detection method based on pulse voltage comparison

The invention discloses a cascaded grid-connected inverter unit fault detection method based on pulse voltage comparison. The method is applicable to a carrier phase-shifting pulse width modulation (PWM) mode, and comprises three steps of output alternating voltage conditioning and sampling, detection condition judging and fault judging and positioning. An output phase voltage of a cascaded grid-connected inverter is subjected to analog / digital (A / D) sampling through a sensor and a conditioning circuit; when the output phase voltage of the inverter is a direct current side voltage of a single H-bridge unit, the fault can be judged and positioned through simple comparison according to a carrier phase-shifting PWM principle. According to the method, only the output three-phase voltage is required to be sampled and simply compared, so that a direct current side voltage value of the H bridge unit of the cascaded inverter can be rapidly and accurately obtained, the fault is further judged, the fault judgment can be conveniently realized through software, the cost is saved, the efficiency is improved, and the method has high research and application values in aspects of real-time fault detection and direct current side voltage balance control of the cascaded grid-connected inverter.
Owner:SOUTHEAST UNIV

Saturated bridge type short circuit fault current limiter

The invention discloses a saturated bridge type short circuit fault current limiter, which comprises a saturated reactor and a rectifier bridge. The connecting point of a first diode (D1) and a second diode (D2) of the rectifier bridge (Br) is a first alternating current end (A); the connecting point of a third diode (D3) and a fourth diode (D4) of the rectifier bridge (Br) is a second alternating current end (B); the connecting point of the first diode (D1) and the third diode (D3) of the rectifier bridge (Br) is a first direct current end (M); the connecting point of the second diode (D2) and the fourth diode (D4) of the rectifier bridge (Br) is a second direct current end (N); the saturated reactor (L) is connected between the first direct current end (M) and the second direct current end (N); one end of an alternating current power supply (Uac) is connected to the first alternating current end (A); the other end of the alternating current power supply (Uac) is grounded; one end of a circuit breaker (SW) is connected to the second alternating current end (B); the other end of the circuit breaker (SW) is connected with a load (RL) in series and is then grounded. The saturated reactor is realized by a permanent magnet and a direct current coil.
Owner:INST OF ELECTRICAL ENG CHINESE ACAD OF SCI

Doubly-fed wind generator fault ride-through model prediction control method

The invention discloses a doubly-fed wind generator fault ride-through model prediction control method. When power grid voltage drops, by means of a rotor linkage prediction control method, an optimal voltage vector is selected by predicting the rotor linkage to be acted on a rotor side converter, so that the synchronous control of the rotor linkage and the stator linkage is realized, the fault impact of the stator linkage to the rotor linkage is weakened, and the rotor fault overcurrent is reduced. Compared with the model prediction control in the stable state, the control frequency through the adoption of the rotor linkage control method is increased by one time when the power grid has faults, the fault response speed is fast, the rotor current is effectively controlled within 1.5-1.6 times of the rated current, the electromagnetic torque ripple is reduced, and the fault ride-through capability of the doubly-fed wind generator during the failure is improved.
Owner:HENAN NORMAL UNIV

FPGA global clock detection technique for manned spacecraft

The invention discloses an FPGA (Field Programmable Gate Array) global clock detection technique for a manned spacecraft. The FPGA global clock detection circuit comprises a global clock frequency dividing circuit, a first synchronization circuit, a second synchronization circuit, a NOT gate and an XOR gate with two input terminals, wherein the global clock frequency dividing circuit is used for frequency division of the global clock to generate a frequency division clock signal; the input terminal of the first synchronization circuit synchronizes the frequency division clock signal to enable a detection clock signal and the frequency division clock signal to be synchronous, and under the control of the detection clock signal and based on the frequency division clock signal, a first detection signal is generated; the input terminal of the NOT gate is connected with the output terminal of the frequency dividing circuit and conducts NOT operation on the frequency division clock signal; the second synchronization circuit is connected with the output terminal of the NOT gate, and under the control of the detection clock signal and based on the calculation result of the frequency division clock signal by the NOT gate, a second detection signal is generated; the XOR gate conducts XOR operation on the first detection signal and the second detection signal. The FPGA global clock detection technique for the manned spacecraft can judge whether the global clock fails to work according to the output of the XOR gate.
Owner:上海航天控制工程研究所

Master-slave synergic control method and control system of DC circuit breaker

The invention provides a master-slave synergic control method and control system of a DC circuit breaker. The method comprises the steps of switching off a mechanical branch switch and recording faultgeneration time when a fault occurs and a breaking signal is given out from a slave control signal; breaking the mechanical switch when the fault generation time is smaller than a time threshold anda current is detected to be 0; and receiving a master control signal when the fault generation time is not smaller than the time threshold and that the mechanical switch is switched off to reach voltage resistance is detected, and judging whether a main branch switch of the DC circuit breaker is switched off or not according to the received master control signal, wherein the master control signalis a system detection signal, and the slave control signal is a changing signal of a DC voltage value in the DC circuit breaker. With the technical scheme provided by the invention, the system fault is judged by combining the accuracy of the system detection signal and the rapidness of slave control in the DC circuit breaker, rapid response speed and accurate judgment are achieved, and misoperation of the DC circuit breaker can be effectively prevented.
Owner:GLOBAL ENERGY INTERCONNECTION RES INST CO LTD

Fault operation method under doubly-fed wind power generator direct power control

InactiveCN104993762AImprove fault operation capabilityRealize real-time optimal field weakening controlElectronic commutation motor controlVector control systemsVoltage vectorSimulation
The invention discloses a fault operation method under doubly-fed wind power generator direct power control. By adopting the control method, complicated coordinate transformation and compensation adjustment in vector control are avoided, and the control instruction is simple, direct and easy to implement. When the grid voltage sags, weak-magnetic rotor flux prediction control is adopted, the given value of rotor flux is worked out based on the actual value of stator flux, the dynamic behaviors of a doubly-fed wind power generator rotor-side converter in different switching states are predicted according to a discrete model of voltage of the converter, seven voltage vector prediction results are evaluated through a value function, and finally, a voltage vector minimizing the value function is chosen. By adopting the algorithm, the optimal switching state can be predicted as a switching signal of the converter in each sampling period. The method needs neither synchronous rotating coordinate system conversion nor PI regulator design, and has the advantages of fast dynamic response, simple control instruction, and easy implementation. The operation capacity of a doubly-fed wind power generator in fault is improved.
Owner:HENAN NORMAL UNIV

Method and device for monitoring working state of access channel in wireless network system

The invention discloses a method and a device for monitoring the working state of an access channel in a wireless network system. The method comprises the following steps of: counting successfully demodulated data packet numbers in the access channel in real time by taking a preset counting time length as a unit, when the number of continuous counting time lengths of which corresponding data packet numbers are 0 and which comprise a current counting time length is greater than a first preset threshold value and data packet numbers corresponding to a plurality of historical counting time lengths meet the conditions of a second preset threshold value, determining that the working state of the access channel is abnormal. By the method and the device, the working state of the access channel can be timely and automatically judged and further confirmed, so a failure response is quicken and system performance is improved; and failures of the access channel of the system can be discovered without the field inspection of real users and informed to an operator for timely processing, so complaints of the users are reduced and the system maintenance cost of the operator is decreased at the same time.
Owner:ZTE CORP

Power generation and distribution intelligent monitoring system

The invention discloses a power generation and distribution intelligent monitoring system comprising a touch screen, an integrated management device, multiple power generator set control devices, multiple load monitoring instruments, a commercial power monitoring instrument, a power generator set air switch, a load air switch and a commercial power switch. RS485 asynchronous serial communication is performed among the integrated management device and the power generator set control devices, the commercial power monitoring instrument and the load monitoring instrument respectively. The touch screen and the integrated management device are connected by adopting an RJ45 interface. The integrated management device controls the power generator set air switch, the load air switch and a commercial power switch closing-switching brake according to monitoring data. Commercial power, power generation and power utilization situations are monitored in a concentrated way; the number of power generator sets in use and the generated power of each power generator set are automatically controlled in a remote way according to the size of electricity loads; the power generator sets are managed in a remote and parallel connection way so that parallel operation of any combinations of the power generator sets can be realized; and automatic grid connection and seamless switching of the power generator sets and commercial power can be controlled in the remote way.
Owner:TELLHOW SCI TECH CO LTD

Operation state monitoring and fault control system for low-voltage transformer district

InactiveCN110011413AFast response to faultsEnsuring Power Quality and Power ReliabilityCircuit arrangementsCondition monitoringEngineering
The invention discloses an operation state monitoring and fault control system for a low-voltage transformer district. The system comprises a plurality of line monitoring units which are used for acquiring the operating parameters of a line end meter box and a branch box, a topology information acquiring unit which is used for obtaining the topological structure information of the low-voltage transformer district, a processing unit which is used for detecting whether a line and equipment in the low-voltage transformer district are failed or not based on the obtained operating parameters and topological structure information and generating a fault repair list when a fault is determined, and a pushing unit which is used for pushing the fault repair prompt information to maintenance personnelbased on the fault repair list. Through the technical solution of the invention, the fine monitoring of the operating state of the low-voltage transformer district is realized, the fault is timely predicted and repaired, the fault response speed is improved, and the power supply quality and power supply reliability of the power distribution transformer district are ensured.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER +2

High-redundancy synchronous signal switching method for intelligent rectifier bridge

The invention provides a high-redundancy synchronous signal switching method for an intelligent rectifier bridge. The method comprises the steps of obtaining the three-phase synchronous signals from all rectifier bridges; if the synchronization signal for driving a trigger pulse comes from the local, immediately starting the synchronization signal switching after the local synchronization signal fails; if the synchronization signal for driving the trigger pulse comes from other intelligent rectifier bridges, determining that the local synchronization signal is normal; if the phase deviation ofthe synchronization signal for driving the trigger pulse and the local same-phase synchronization signal exceeds a preset threshold value, starting the synchronization signal switching; if the localthree-phase synchronous signal fails and the synchronous signal for driving the trigger pulse is not from the local, selecting the synchronous signal for driving the trigger pulse according to the synchronous signal information provided by an online controller; if the synchronization signal switching is started through the method in the step S3, pausing to receive the synchronization signal coordination of the online controller within one second after the switching. According to the invention, the fault response speed of a high-redundancy synchronization scheme is improved, and the reliabilityof the system is improved.
Owner:THREE GORGES NENGSHIDA ELECTRIC

Two-stage photovoltaic grid-connected power generation optimization device, control system and method

The invention relates to a two-stage photovoltaic grid-connected power generation optimization device, a control system and a method. The device comprises a double-frequency suppression unit which isused for filtering double-frequency components in the voltage of a medium-voltage direct-current bus and the inductive current of a medium-voltage direct-current bus side, and a control unit which isused forfiltering the voltage of the medium-voltage direct-current bus of the double-frequency component and the inductive current of the medium-voltage direct-current bus side of the double-frequencycomponent according to the voltage instruction value of the medium-voltage direct-current bus, the current of the medium-voltage direct-current bus and the inductive current of the medium-voltage direct-current bus side, and determining an input current optimal instruction value of a DC / DC converter connected with a photovoltaic system through a low-voltage direct-current bus. According to the invention, when a low-voltage fault occurs in two-stage photovoltaic grid-connected power generation, the double-frequency fluctuation of the voltage of the medium-voltage direct-current bus can be suppressed, and the electric energy quality of the medium-voltage direct-current bus is improved.
Owner:CHINA ELECTRIC POWER RES INST +2

Master-slave cooperative control method and control system for DC circuit breaker

The invention provides a master-slave synergic control method and control system of a DC circuit breaker. The method comprises the steps of switching off a mechanical branch switch and recording faultgeneration time when a fault occurs and a breaking signal is given out from a slave control signal; breaking the mechanical switch when the fault generation time is smaller than a time threshold anda current is detected to be 0; and receiving a master control signal when the fault generation time is not smaller than the time threshold and that the mechanical switch is switched off to reach voltage resistance is detected, and judging whether a main branch switch of the DC circuit breaker is switched off or not according to the received master control signal, wherein the master control signalis a system detection signal, and the slave control signal is a changing signal of a DC voltage value in the DC circuit breaker. With the technical scheme provided by the invention, the system fault is judged by combining the accuracy of the system detection signal and the rapidness of slave control in the DC circuit breaker, rapid response speed and accurate judgment are achieved, and misoperation of the DC circuit breaker can be effectively prevented.
Owner:GLOBAL ENERGY INTERCONNECTION RES INST CO LTD

Disaster recovery method, device and equipment based on active-active system and storage medium

PendingCN114095343ALower level requirementsSolve the problem of loss and damageTransmissionNatural disasterActive systems
The invention relates to the technical field of digital medical treatment and artificial intelligence, and particularly discloses a disaster recovery method and device based on an active-active system, equipment and a storage medium. The method comprises the following steps: when it is detected that a disaster occurs in a first machine room, acquiring configuration information of the first machine room, matching a preset fault scene according to the configuration information, and acquiring a corresponding directed acyclic execution stream according to the fault scene; obtaining an execution request sent by a client, and generating an execution instruction of each task node according to the directed acyclic execution flow based on the execution request; obtaining a mapping relation between a corresponding task node and an execution server and corresponding execution script information according to the execution instruction; and determining a target execution server according to the mapping relationship, and running the execution script information on the target execution server to switch the first machine room to the second machine room. By means of the mode, the fault response speed can be increased, and the problem of data loss and damage caused by man-made or natural disasters is solved.
Owner:ONE CONNECT SMART TECH CO LTD SHENZHEN

Interface and system monitoring method and monitoring system based on sap platform

The invention discloses a monitoring method and a monitoring system based on the interface and system of the SAP platform; the method includes the following steps: collecting interface data and server system data to be monitored on the SAP platform; configuring monitored points according to the importance level of the monitoring points interface and the monitoring level of the server system; configure the monitoring role user group; configure the role relationship between the monitoring content and the person in charge of monitoring; assign role user groups to each monitoring item; configure the early warning data of each monitoring item: carry out different early warning methods Configure, and configure the frequency of early warning according to the time interval; configure the specific content of monitoring for each monitoring item; store the early warning messages and solutions in the knowledge base; send early warning information according to the monitoring level for the monitored information . The present invention can timely discover the existing or potential problems of the SAP system and peripheral application systems and remind or alarm in real time, so as to ensure that the system has good performance for daily business processing.
Owner:STATE GRID SHANDONG ELECTRIC POWER +2

A high-redundancy synchronous signal switching method for an intelligent rectifier bridge

The invention provides a high-redundancy synchronization signal switching method for an intelligent rectifier bridge, which includes acquiring three-phase synchronization signals from all rectifier bridges; the synchronization signal driving the trigger pulse comes from the local, and the synchronization signal switching is started immediately after the local synchronization signal fails; The synchronization signal that drives the trigger pulse comes from other smart rectifier bridges, and the local synchronization signal is normal. If the phase deviation of the synchronization signal that drives the trigger pulse exceeds the preset threshold compared with the local same-phase synchronization signal, synchronization signal switching is started; the local three-phase synchronization signal appears fault, and the synchronization signal driving the trigger pulse does not come from the local, select the synchronization signal driving the trigger pulse according to the synchronization signal information provided by the online controller; if the synchronization signal switching is started by the method of step S3, the online acceptance will be suspended within 1 second after the switching. Controller synchronization signal coordination. The invention improves the fault response speed of the high redundancy synchronization scheme and improves the reliability of the system.
Owner:THREE GORGES NENGSHIDA ELECTRIC

An AC short circuit fault current limiter

The invention relates to an AC short-circuit fault current limiter, comprising: a fast switch, a split reactor, a reactor and a capacitor. Wherein, the split reactor includes a first winding and a second winding whose magnetic flux is reversed. A series resonant circuit composed of a reactor and a capacitor resonates at the power frequency. When the grid is stable, the currents of the branches where the first winding and the second winding are located are equal, the magnetic fluxes cancel, and the current limiter exhibits small impedance or no impedance. After the fault occurs, the short-circuit current contains multiple harmonic components, and the series resonant circuit composed of reactors and capacitors presents impedance, resulting in unequal currents in the branches where the first winding and the second winding are located, increasing the current limiting impedance of the split reactor. , to achieve fast automatic current limiting. Then, the fast switch breaks and extinguishes the arc, which further limits the short-circuit current of the current limiter. The current limiter of the present invention can effectively limit the short-circuit current of the AC power grid and improve the operation reliability of the power grid.
Owner:INST OF ELECTRICAL ENG CHINESE ACAD OF SCI

Control method of booster switching of gas distribution platform based on high-speed data acquisition

The invention relates to a gas distribution bench supercharging switching control method based on high-speed data collection. A pre-launch supercharging mode is firstly adopted in a power measurement and control system. Firstly, front end pressure parameters are received, then by means of data cleaning, smooth filtering, pressure band threshold judgment and a two-out-of-three decision, a supercharging valve on-off signal of a ground gas distribution bench is directly obtained, and a power relay equipment cabinet is used to drive a supercharging valve of the ground gas distribution bench to work, so that the timeliness of data transmission and processing is realized, and the influences of front and rear end network faults are eliminated. According to the invention, three modes of front end self-closed-loop supercharging control (pre-launch supercharging), rear end remote measurement supercharging control (hand-operated supercharging) and rear end geologic measurement supercharging control (test supercharging) are fused by the method, the dependency of supercharging control on the network is substantially lowered, and the system requirements on low-temperature carrier rocket reliable supercharging under various fault modes are met by the multi-mode switching mode, so that the advancement and the practical value are extremely high.
Owner:BEIJING INST OF ASTRONAUTICAL SYST ENG +1

Method and device for monitoring working status of access channel in wireless network system

The invention discloses a method and a device for monitoring the working state of an access channel in a wireless network system. The method comprises the following steps of: counting successfully demodulated data packet numbers in the access channel in real time by taking a preset counting time length as a unit, when the number of continuous counting time lengths of which corresponding data packet numbers are 0 and which comprise a current counting time length is greater than a first preset threshold value and data packet numbers corresponding to a plurality of historical counting time lengths meet the conditions of a second preset threshold value, determining that the working state of the access channel is abnormal. By the method and the device, the working state of the access channel can be timely and automatically judged and further confirmed, so a failure response is quicken and system performance is improved; and failures of the access channel of the system can be discovered without the field inspection of real users and informed to an operator for timely processing, so complaints of the users are reduced and the system maintenance cost of the operator is decreased at the same time.
Owner:ZTE CORP

Faulty operation method of doubly-fed wind turbine under direct power control

InactiveCN104993762BImprove fault operation capabilityRealize real-time optimal field weakening controlElectronic commutation motor controlVector control systemsVoltage vectorSimulation
The invention discloses a fault operation method under direct power control of a doubly-fed wind power generator. The control method avoids complex coordinate transformation and compensation adjustment in vector control, and the control command is simple and direct, and is easy to implement. , the rotor flux linkage flux weakening predictive control is adopted, the given value of the rotor flux linkage is calculated by the actual value of the stator flux linkage, and the discrete model of the converter voltage on the rotor side of the doubly-fed wind turbine is used to predict the different switching states of the converter at the next moment The dynamic behavior of the seven voltage vectors is evaluated by the value function, and finally the voltage vector that minimizes the value function is selected. This algorithm can predict the optimal switching state in each sampling period as the switching signal of the converter. The invention does not need synchronous rotating coordinate system conversion and PI regulator design, has fast dynamic response, simple control instructions, and is easy to implement, and improves the fault operation capability of the double-fed wind power generator during the fault process.
Owner:HENAN NORMAL UNIV

fpga global clock detection device for manned spacecraft

The invention discloses an FPGA (Field Programmable Gate Array) global clock detection technique for a manned spacecraft. The FPGA global clock detection circuit comprises a global clock frequency dividing circuit, a first synchronization circuit, a second synchronization circuit, a NOT gate and an XOR gate with two input terminals, wherein the global clock frequency dividing circuit is used for frequency division of the global clock to generate a frequency division clock signal; the input terminal of the first synchronization circuit synchronizes the frequency division clock signal to enable a detection clock signal and the frequency division clock signal to be synchronous, and under the control of the detection clock signal and based on the frequency division clock signal, a first detection signal is generated; the input terminal of the NOT gate is connected with the output terminal of the frequency dividing circuit and conducts NOT operation on the frequency division clock signal; the second synchronization circuit is connected with the output terminal of the NOT gate, and under the control of the detection clock signal and based on the calculation result of the frequency division clock signal by the NOT gate, a second detection signal is generated; the XOR gate conducts XOR operation on the first detection signal and the second detection signal. The FPGA global clock detection technique for the manned spacecraft can judge whether the global clock fails to work according to the output of the XOR gate.
Owner:上海航天控制工程研究所

Data processing method, device and electronic equipment

The invention provides a data processing method, a device, electronic equipment, a computer program product and a computer readable storage medium. The method comprises the steps of obtaining multiple pieces of target data for a target application; performing fault recognition processing on the multiple pieces of target data to obtain multiple pieces of fault data in the multiple pieces of target data; performing word segmentation processing on each piece of fault data to obtain at least one keyword of each piece of fault data; performing clustering processing based on the keyword on the multiple pieces of fault data to obtain multiple fault data clusters of the target application; and determining a fault label corresponding to each fault data cluster according to the keyword of the fault data of each fault data cluster. Through the application, the order of magnitude of the fault data can be reduced and the accuracy can be improved through the fault label of each cluster, so that the fault response speed is effectively improved.
Owner:TENCENT TECH (SHENZHEN) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products