Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

33results about How to "Ensure connection security" patented technology

Semi-grouting sleeve assembly of precast beam steel connection of cast-in-place beam column joints and application thereof

The invention discloses a semi-grouting sleeve assembly of a precast beam steel connection of cast-in-place beam column joints and an application thereof. The semi-grouting sleeve assembly comprises asemi-grouting sleeve and an integral nut bolt, wherein the integral nut bolt is connected with the semi-grouting sleeve. The semi-grouting sleeve comprises a straight cylindrical body, one end of thestraight cylindrical body is a threaded end provided with an internal thread, the other end is a grouting end, and the outer end opening of the grouting end is used to insert a horizontally longitudinal rebar of a prefabricated laminated beam. The integral nut bolt includes a body and internal and external threads disposed on the body. The internal threads are used to connect a thread with one end of the horizontally longitudinal rebar of another prefabricated beam. The semi-grouting sleeve assembly replaces an existing full-grouting sleeve with a precast beam steel connection, the length andweight are reduced by nearly half, and the sleeve price is reduced. When the beam steel used for cast-in-place beam column joints are connected, the requirements on the length of a column section arealso correspondingly reduced, thereby avoiding the increase of the length dimension of the column section and the cost is low.
Owner:浙江省建筑科学设计研究院建筑设计所

Information security system and method with anti-attack function

PendingCN112398830AAchieve information securityAchieve securityTransmissionReal-time computingAttack
An information security system with an anti-attack function is provided with a physical hardware detection module, a network connection state detection module, a static network comparison module, an attack information collection module and a simulation operation system. The method comprises the following specific steps: 1, collecting equipment operation data in real time through a hardware detection module, comparing the equipment operation data with an equipment operation database, if no abnormality exists, entering the next step, and otherwise, giving an alarm; 2, detecting the network connection state of each device in real time; 3, comparing with a network static connection database, if the data is consistent, entering the next step, and if the data is inconsistent, abnormal, blockingthe connection and sending an alarm; 4, storing the attack information into an attack information base, collecting the attack information on the Internet regularly, and perfecting the attack information base; and 5, enabling the attack information base to select an attack instruction, attack equipment in the simulation system, formulate a blocking strategy according to an attack process, and update an actual operation system according to the blocking strategy.
Owner:SHENZHEN POWER SUPPLY BUREAU

Damping energy dissipation assembling node of precast column and integrated precast beam panel, and construction method thereof

The invention relates to a damping energy dissipation assembling node of a precast column and an integrated precast beam panel, and a construction method thereof. The assembling node comprises the integrated precast beam panel and the precast column, wherein the precast column comprises a lower precast column and an upper precast column; flaring steel pipes I are pre-embedded to the upper surfaceof the lower precast column; the integrated precast beam panel is arranged on the lower precast column and is pre-embedded with a damping steel pipe and multiple necking steel pipes; the upper precastcolumn is arranged on the integrated precast beam panel; a connecting steel pipe and multiple flaring steel pipe II are pre-embedded to the lower surface of the upper precast column; the free end ofthe connecting steel pipe extends into the damping steel pipe; the flaring steel pipes I and the flaring steel pipes II are coaxial in a one-to-one correspondence way and extend into two ends of the corresponding necking steel pipes; flaring parts are arranged at the free ends of the flaring steel pipes I and the flaring steel pipes II; necking parts are arranged at two ends of the necking steel pipes; the corresponding flaring parts of the flaring steel pipes I and the flaring steel pipes II are clamped into the necking parts so as to realize clamping; a connecting structural steel is also preserved on the upper surface of the lower precast column; the free end of the connecting structural steel penetrates through the damping steel pipe and extends into the connecting steel pipe.
Owner:NORTHWEST UNIVERSITY FOR NATIONALITIES

Remote network connection method and system, computer equipment and storage medium

The invention relates to a remote network connection method and system, computer equipment and a storage medium. The method comprises the following steps of: monitoring a server connection request initiated through a target port of a client, analyzing the server connection request to obtain a target server address, acquiring client signature data and a gateway address associated with the client; constructing a gateway connection request which carries the target server address and the client signature data; sending the gateway connection request to a gateway corresponding to the gateway address, and enabling the gateway to extract the client signature data and the target server address carried in the gateway connection request and verify the client signature data and the target server address; and when the client signature data and the server address pass the verification, establishing network connection based on gateway transfer between the target port of the client and a target servercorresponding to the target server address. The network connection between the client and the target server is realized based on the gateway, and the network connection management between the clientand the server is simplified.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Steel plate strip suspension bridge and construction method thereof

The invention relates to the technical field of buildings, and provides a steel plate strip suspension bridge and a construction method thereof. The steel plate strip suspension bridge comprises a bridge body and two conversion connecting devices; the bridge body comprises steel plate strips; and each conversion connecting device comprises an anchoring connecting piece and a steel plate strip connecting piece, the anchoring connecting pieces are connected with the anchor cable devices, and the steel plate strip connecting pieces are connected with the ends of the steel plate strips. The steel plate strip suspension bridge construction method comprises the following steps: constructing the bridge body, laying or hoisting the steel plate strips in the span direction of a to-be-constructed bridge body, and constructing the anchor cable devices on the two banks of the to-be-constructed bridge body; assembling the two conversion connecting devices; and connecting the steel plate strip connecting piece to the ends of the steel plate strips, and connecting the anchoring connecting piece to the anchor cable device. The suspension bridge has the beneficial effects that: the structure of the suspension bridge is simplified, the size is reduced, the suspension bridge is more attractive and ornamental, the steel consumption is small, the construction cost is reduced, and later maintenance is convenient.
Owner:NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD

Metal roof mounting structure based on BIM technical design and construction method

The invention discloses a metal roof mounting structure based on BIM technical design and a construction method, and belongs to the field of building roofs. The metal roof mounting structure comprises a plurality of sets of roof single bodies and mounting frames connecting every two adjacent roof single bodies, fixing pieces are arranged on the opposite sides of every two adjacent roof single bodies, a mounting groove is formed in the side wall of each fixing piece in the length direction, and connecting angle claws are rotationally mounted on the two sides of the interior of each mounting frame; one end of each connecting angle claw is slidably arranged on a corresponding push block, and the other end of each connecting angle claw is matched with a corresponding mounting groove after rotating by a certain angle; a guide groove is formed in the inner side wall of each mounting frame, each push block is slidably arranged in the corresponding guide groove, and the two ends of each push block are rotatably mounted on the corresponding connecting angle claws correspondingly; and locking pieces for fixing the push blocks are arranged on the mounting frames. The whole structure and operation are convenient to construct, the effect of reliable connection is achieved, and the design requirements for structural strength and safety are met.
Owner:CHINA MCC17 GRP

A kind of mortar pretreatment equipment based on plastering base hollow drum for construction

The invention discloses a construction mortar pretreatment equipment based on hollow plastered base layer lining, the structure of which comprises: a discharge chute, a collection box, a mortar lining ladder groove, a long bucket groove, a supporting column plate, and a motor , Base bottom plate, the present invention realizes the use of mortar-lined ladder grooves to cooperate with the long groove of the tipping bucket to form a superimposed and extended scraping effect through the insertion of the stacked lining plate fan frame, ensuring that the air layer enclosed by the mortar passes through the stacked lining plates The fan frame forms the output effect of the wall-attached board along the way, and then continuously discharges the gas trapped in the mortar through the drainage extraction board, so that the purity and viscosity of the overall fluid can be reconciled to a certain extent, and the ejection effect of the fan body of the stacked board is realized. It is convenient for the semi-circular agitation fluid to form a lifting effect of the circulation output, which ensures the uniformity of the lowered material and the extracted material in the trapezoidal tank, and effectively avoids the hollowing of the mortar entrained gas to achieve the compactness of the mortar quality.
Owner:上海汇丽建筑结构工程有限公司

Fall-proof U-shaped foot pin for iron tower and use method thereof

The invention discloses a fall-proof U-shaped foot pin for an iron tower and a use method thereof. The fall-proof U-shaped foot pin for the iron tower comprises a U-shape foot pin and a limiting plate, wherein the U-shape foot pin is arranged on a steel frame of the iron tower, end 1 of an open end of the U-shaped foot pin is fixedly connected with the steel frame, end 2 of the open end of the U-shaped foot pin is connected with the lower portion of the limiting plate, the two ends of the open end of the U-shaped foot pin are vertically arranged, the upper portion of the limiting plate passes through the end 1, and fixedly connected with the steel frame together with the end 1 in close mode, and a limiting groove clamped on the steel frame is formed in the back side of the lower portion of the limiting plate. By using the U-shaped foot pin and the limiting plate, the fall-proof U-shaped foot pin for the iron tower can be conveniently and quickly installed on the steel frame, saves a process of manufacturing holes in the steel frame, and is convenient to assemble and unassembled and maintain. Especially for remolding of a traditional reinforcing steel bar foot pin, an existing installation through hole is used, and then the limiting plate and the U-shaped foot pin can be conveniently and quickly installed on the steel frame of the iron tower, remolding is easy, shinning safety of the traditional iron tower and reliability of the foot pin are greatly improved, remolding cost is low, and the fall-proof U-shaped foot pin for the iron tower further has the advantages of being simple in structure and low in cost.
Owner:GUIYANG POWER SUPPLY BUREAU OF GUIZHOU POWER GRID CO LTD

Pipeline supply system and pipeline connection structure thereof

The invention relates to a pipeline supply system and a pipeline connecting structure thereof. The pipeline supply system comprises a pipeline and the pipeline connecting structure, and a pipe cavity is formed in the pipeline; the pipeline connecting structure comprises a connecting main body and a sleeve shell, a flowing cavity is formed in the connecting main body, and the flowing cavity is used for being communicated with the pipe cavity of the pipeline; and one end of the sleeve shell is a sleeve end, the other end of the sleeve shell is a connecting end, a connecting cavity is formed in the sleeve shell, the connecting cavity penetrates through the sleeve end to form a sleeve opening, the sleeve opening is used for penetrating of the pipeline, the sleeve end is used for being clamped to the pipeline, the connecting cavity penetrates through the connecting end to form a connecting opening, and the connecting main body penetrates through the connecting opening to be arranged in the connecting cavity. The connecting end can be clamped on the connecting main body. The pipeline and the connecting main body can be connected only by arranging the sleeve shell, the connecting stability and connecting safety between the pipeline and the connecting main body are guaranteed, operation is easy and convenient, and the efficiency and convenience of pipeline connection are improved.
Owner:RIFENG ENTERPRISE FOSHAN CO LTD +2

In-vehicle device to connect to information terminal and in-vehicle system

A communication interface can connect to an information terminal. When detecting the connection between the communication interface and the information terminal, a verification interface verifies the security status of the information terminal. When there is no problem in the security status of the information terminal verified by the verification interface, a display displays an image based on an image signal received by the communication interface from the information terminal. The operation interface accepts an operation on the image displayed by the display. The communication interface transmits an operation signal responsive to the operation accepted by the operation interface to the information terminal, and then receives an image signal as a result of processing by the information terminal in accordance with the operation signal from the information terminal.
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Conversion connecting device and construction method thereof

The invention relates to the technical field of buildings, and provides a conversion connecting device and a construction method thereof. The conversion connecting device is used for connecting an anchor cable device and a steel plate belt of a suspension bridge, comprises an anchoring connecting piece and a steel plate belt connecting piece and is used for connecting the anchor cable device of the suspension bridge; and the steel plate belt connecting piece comprises a web plate and a wing plate, the wing plate is connected with the anchoring section of the steel plate belt, the wing plate is connected with the web plate, and the web plate is connected with the anchoring connecting piece. The conversion connecting device has the beneficial effects that: the anchoring mounting plate is connected to the the anchor cable device, and then the steel plate belt connecting piece is connected with the anchoring section of the steel plate belt suspension bridge, so that indirect connection and fixation of the anchor cable device and the steel plate belt of the steel plate belt suspension bridge are realized. The anchor cable device is not affected by deflection and vibration of the steel plate belt under the load effect, and the connection safety and reliability of the steel plate belt and the anchor cable device are guaranteed.
Owner:NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD

Semi-trailer traction saddle

The invention provides a semi-trailer traction saddle. The semi-trailer traction saddle is characterized in that a left frame support beam and a right frame support beam are symmetrically arranged outside a frame, a left saddle bracket and a right saddle bracket are correspondingly connected onto the left frame support beam and the right frame support beam through bolts I, and a saddle is connected onto the left saddle bracket and the right saddle bracket; a left saddle inclined block and a right saddle inclined block are correspondingly arranged on the inner sides of the left saddle bracket and the right saddle bracket, the bottom surface of the left saddle inclined block and the bottom surface of the right saddle inclined block are attached to the plane of the frame, the inclined plane of the left saddle inclined block and the inclined plane of the right saddle inclined block are attached to the inner inclined plane of the left saddle bracket and the inner inclined plane of the right saddle bracket respectively, and the saddle inclined blocks are connected with the left saddle bracket and the right saddle bracket through transverse bolts II respectively. According to the semi-trailer traction saddle, a saddle mounting plate is omitted, the saddle support bodies, namely the saddle brackets, are connected with the frame support beams through the bolts; in a use process, vertical load applied to the saddle is transmitted to the frame through the saddle brackets and the saddle inclined blocks, and the frame and the frame support beams bear vertical pressure; stress generated through height difference clearance is reduced while the cost is reduced, and connection safety and use safety of the saddle are guaranteed.
Owner:DONGFENG SPECIAL PURPOSE VEHICLE

U-shaped foot nail for preventing iron tower from falling and using method thereof

The invention discloses a fall-proof U-shaped foot pin for an iron tower and a use method thereof. The fall-proof U-shaped foot pin for the iron tower comprises a U-shape foot pin and a limiting plate, wherein the U-shape foot pin is arranged on a steel frame of the iron tower, end 1 of an open end of the U-shaped foot pin is fixedly connected with the steel frame, end 2 of the open end of the U-shaped foot pin is connected with the lower portion of the limiting plate, the two ends of the open end of the U-shaped foot pin are vertically arranged, the upper portion of the limiting plate passes through the end 1, and fixedly connected with the steel frame together with the end 1 in close mode, and a limiting groove clamped on the steel frame is formed in the back side of the lower portion of the limiting plate. By using the U-shaped foot pin and the limiting plate, the fall-proof U-shaped foot pin for the iron tower can be conveniently and quickly installed on the steel frame, saves a process of manufacturing holes in the steel frame, and is convenient to assemble and unassembled and maintain. Especially for remolding of a traditional reinforcing steel bar foot pin, an existing installation through hole is used, and then the limiting plate and the U-shaped foot pin can be conveniently and quickly installed on the steel frame of the iron tower, remolding is easy, shinning safety of the traditional iron tower and reliability of the foot pin are greatly improved, remolding cost is low, and the fall-proof U-shaped foot pin for the iron tower further has the advantages of being simple in structure and low in cost.
Owner:GUIYANG POWER SUPPLY BUREAU OF GUIZHOU POWER GRID CO LTD

Launch control device and control method for sliding test in small water tank

The invention discloses an emission control device for a sliding test in a small water tank. The emission control device for the sliding test in the small water tank comprises a frame, a test slider,a driving device and a control device. The test slider and the driving device are mounted on the frame. The driving device comprises two parallel guide rods fixedly mounted on the frame, a magnetic impact slider slidably sleeved on the two guide rods, springs sleeved on the guide rods, and a magnetic field generator arranged on the frame. One end of the magnetic impact slider presses against the springs. The test slider is slidably mounted on the two guide rods. The output end of the control device is electrically connected with the magnetic field generator. The invention discloses an emissioncontrol method. When the magnetic field generator is powered on, the magnetic field generator pulls in the magnetic impact slider to drive the magnetic impact slider to compress the springs; and whenthe magnetic field generator is powered off, the springs push the magnetic impact slider, and the magnetic impact slider impacts the test slider to slide. The emission control device converts elasticpotential energy into kinetic energy to provide power, and has the advantages of simple structure, simple operation and high safety.
Owner:FOSHAN UNIVERSITY

A metal roof installation structure and construction method designed based on bim technology

The invention discloses a metal roof installation structure and a construction method designed based on BIM technology, belonging to the field of building roofs. It includes several groups of roof units and installation frames connecting two adjacent roof units. The opposite sides of the two adjacent groups of roof units are provided with fixing pieces, and the length of the upper edge of each side wall of each fixing piece is There are installation grooves in both directions, and connecting angle claws are installed on both sides of the installation frame. One end of the connecting angle claws is slidably set with the push block, and the other end is adapted to the installation groove after rotating a certain angle. , the inner side wall of the installation frame is provided with a guide groove, and a push block is slidably arranged inside the guide groove, and the two ends of the push block are respectively installed in rotation with the corresponding connecting claws, and the installation frame is provided with a set for fixing Push the lock of the block. The whole structure and operation are convenient for construction, achieve the effect of reliable connection, and meet the design requirements of structural strength and safety.
Owner:CHINA MCC17 GRP

Open-type dry hanging stone brick curtain wall

The invention relates to the field of brick curtain walls and in particular relates to an open-type dry hanging stone brick curtain wall. The open-type dry hanging stone brick curtain wall comprises a keel, more than two inside stone bricks arranged at the inner side of the keel, and more than two outside stone bricks arranged at the outer side of the keel, wherein the left wall of the keel is provided with a group of uniformly-arranged left fin plates; the right wall of the keel is provided with a group of uniformly-arranged right fin plates; the left fin plates and the right fin plates are arranged alternately, and the vertical distance between a left fin plate and a right fin plate which are adjacent vertically is a preset value; the inner side and outer side of each left fin plate are fixedly provided with an inside stone brick and an outside stone brick respectively; and the inner side and outer side of each right fin plate are fixedly provided with an inside stone brick and an outside stone brick respectively. The scheme effectively avoids the machining error, ensures the smooth installation of the stone bricks, effectively guarantees the construction quality and safety, and meanwhile reduces the construction difficulty and engineering cost input.
Owner:THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU

Composite wall panel for prefabricated steel structure building and its manufacturing and installation method

The invention relates to a composite wallboard for a fabricated steel structure building. The composite wallboard for the fabricated steel structure building sequentially comprises an aerated concreteboard base layer, an interface processing layer, a bonding layer, an insulating layer, a protecting layer and an anti-cracking face layer from bottom to top, wherein the aerated concrete board base layer and the insulating layer are composited together through the interface processing layer and the bonding layer in a bonding manner, the heat preservation mortar protecting layer is poured on the upper surface of the insulating layer, and the insulating layer is completely wrapped by the protecting layer; and the anti-cracking face layer is painted or sprayed to the upper side of the protectinglayer, and the protecting layer, the insulating layer and the aerated concrete board base layer are mechanically anchored together through plastic anchor bolts. According to the composite wallboard for the fabricated steel structure building, the aerated concrete board base layer has the advantages that the manufacturing material source is wide, materials are stable and the like, machinability isgood, the problems of heavy object nailing and hanging on a wall and groove forming and pipeline distributing are solved, and the requirement for the wall thermal performance at cold and severe coldareas is met; and meanwhile, the composite wallboard for the fabricated steel structure building also has the characteristics of being small in weight, low in cost, simple in connection structure, convenient to construct and install and the like and is suitable for an outer wall of the fabricated steel structure building.
Owner:SHANDONG JIANZHU UNIV

Network address management system and method with bidirectional cable

A bidirectional cable network address management system and its method is to manage the internal address of the client terminal entering into network. The client terminal includes a bidirectional modem with a first access control address, a computer linked on it with a second access control address, a modem head-end, a dynamic host composite mode protocol server connected to the modem head-end receiving the first and second access control address, allocating and sending the first and second IP address of the client terminal according to the first and second access address. If the first and second access control addresses are not stored in the dynamic composite mode protocol server, the IP address is the unregistered first IP addrss, the second IP address is the unregistered second IP address.
Owner:NEW CENTURY INFOCOMM TECH

Concrete filled steel tube support connecting device

PendingCN109098292AConvenient for on-site construction and pouringGood stabilityBuilding constructionsSteel tubeEngineering
The invention discloses a concrete filled steel tube support connecting device. The concrete filled steel tube support connecting device can facilitate in-site construction casting and achieve stablyconnection of a concrete filled steel tube support. During connecting construction, a worker only needs to mount parts such as anchor rods of a positioning and tensioning module I and a positioning and tensioning module II, then extends the positioning and tensioning module I and the positioning and tensioning module II into the steel tubes of the concrete filled steel tube support respectively, clamps a connecting module between the positioning and tensioning module I and the positioning and tensioning module II, welds axial connecting modules and fills in concrete grout to complete a connection process. The concrete filled steel tube support connecting device is good in connecting stability, high in bearing capacity, stable and reliable in axial and radial connection and tensioning and capable of effectively ensuring the connecting safety and firmness of the concrete filled steel tube support and facilitating construction.
Owner:JIANGSU VOCATIONAL INST OF ARCHITECTURAL TECH

Connection box

The invention provides a connection box which is composed of a base, a box body and an internal component, the base and the box body form an outer shell and are used for isolating the connection box from an external natural environment and the internal component, meanwhile, the box body is of a cap-shaped structure and covers the base, and sealing between the box body and the base is guaranteed through a first sealing structure; and an optical cable is installed from the lower end of the base and is clamped and limited by the optical cable inlet clamping device, the sealing performance is ensured by the second sealing structure, and the conditions of water seepage and icing are reduced by using an up-and-down arrangement mode and a plurality of sealing structures. After an optical cable is introduced into the splice closure, the optical fiber is protected by the fiber accommodating disc and the fiber hiding disc of the internal structure, so that the splicing safety of the optical cable is ensured, and the reliability of the splice closure is integrally improved.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER

Stacking lining type mortar pretreatment equipment based on plastering base layer hollowing for building

The invention discloses stacking lining type mortar pretreatment equipment based on plastering base layer hollowing for a building. The equipment structurally comprises a discharging chute, a collecting box, a mortar stacking lining trapezoidal groove, a tipping bucket long groove, a support column plate block, a motor and a base bottom plate. According to the equipment, the mortar stacking liningtrapezoidal groove is matched with the tipping bucket long groove, so that the overlapped extending scraping and inserting effect achieved through inserting connection of a stacking lining plate fanframe is formed, it is guaranteed that an air layer contained in mortar forms the downstream output effect attaching a wall plate through the stacking lining plate fan frame, gas contained in the mortar is continuously discharged outwards through a drainage extraction plate, the purity and viscosity of the whole fluid are adjusted to a certain degree, the fan body ejection effect of a stacking lining discharging plate is achieved, the circulation-output lifting effect formed by semi-annular stirring fluid is also facilitated, the uniformity of material discharging and material extracting in the trapezoidal groove is guaranteed, hollowing caused by the mortar containing gas is effectively avoided, and the compactness of the mortar quality is achieved.
Owner:上海汇丽建筑结构工程有限公司

An intelligent tool management device for mold processing

The invention discloses an intelligent tool management device for mold processing, relating to the technical field of tool management equipment, including a protective frame, a tool storage tube, a third insert, a spring, a limit block, a flexible washer, an annular groove, and a first insert , a first cavity, a first support ring, a second support ring, a connecting shaft and a support block. In the present invention, force can be applied to both ends of the first support ring, so that the force on the flexible gasket is more uniform, the stability of the assembly connection between the assembly frame and the management cabinet is strengthened, and the connection stability and safety of the device are ensured; the assembly frame, The locking of the holding frame and the adjusting plate can effectively prevent the device from shifting during long-term storage and transportation, and can effectively strengthen the protection effect of the tool packaging, which is convenient for long-term storage and transportation of the tool and ensures the safety of the tool And stability, when taking out the tool storage tube, the tool will not fall directly from the tool storage tube, which can further ensure the safety of the tool.
Owner:WENZHOU POLYTECHNIC

Conversion connection device and construction method thereof

This application relates to the field of construction technology, and provides a conversion connection device and its construction method. The conversion connection device is used to connect the anchor cable device and the steel plate belt of the suspension bridge, including the anchor connector and the steel plate belt connector, which are used to connect the suspension bridge. The anchor cable device; the steel plate belt connector includes a web and a wing plate, the wing plate is connected to the anchor section of the steel plate belt, the wing plate is connected to the web plate, and the web plate is connected to the anchor connector. The beneficial effects of the present invention are: the anchor cable device is connected through the anchoring installation plate, and then connected with the anchor section of the steel belt suspension bridge through the steel plate belt connector, so as to realize the indirect connection and fixation of the anchor cable device and the steel plate belt suspension bridge steel belt. The anchor cable device is not affected by the disturbance and vibration of the steel strip under load, which ensures the safety and reliability of the connection between the steel strip and the anchor cable device.
Owner:NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD

Mortar pretreatment system and method

The invention discloses a mortar pretreatment system and method. The mortar pretreatment system structurally comprises a discharging chute, a collecting box, a mortar laminated lining ladder groove, a tipping bucket long groove, a supporting column plate block, a motor and a base bottom plate. According to the mortar pretreatment system and method, the mortar laminated lining ladder groove is matched with the tipping bucket long groove, a laminated extending scraping and inserting effect of inserting through a laminated lining plate fan frame is formed, an air layer wrapped by mortar forms a wall-attached plate direct output effect through the laminated lining plate fan frame, then gas wrapped in the mortar is continuously discharged through a drainage extraction plate, so that the purity and the viscosity of the whole fluid are blended to a certain extent, the fan body ejection effect of a laminated lining output plate is achieved, a semi-annular stirring fluid can conveniently form a lifting effect of circulating output, the uniformity of the discharged materials and the extracted materials in the trapezoidal groove is guaranteed, the phenomenon that the mortar wrapping gas generates hollowing is effectively avoided, and the compactness of the mortar quality is achieved.
Owner:JINING JUQUAN BUILDING MATERIALS TECH CO LTD

Wiring structure of connection box and fiber containing disc

The invention provides a wiring structure of a fiber containing disc. The wiring structure comprises the fiber containing disc of a rectangular structure, a fiber containing groove formed in the plate face of the rectangular disc, a linear section and an arc section which are arranged in the fiber containing groove and used for guiding optical fibers, and an embedded part which is arranged in the middle of the fiber containing groove and used for positioning the connected optical fibers. Two connected optical fibers are fed into the fiber containing disc and are wound in the fiber containing groove through the straight line section and the arc line section, the connecting end of the two connected optical fibers is located in the middle of the fiber containing groove, the optical fibers are positioned through the embedding part, and through the fiber containing groove in the fiber containing disc and the embedding part located in the middle of the fiber containing groove, the elastic tension of the optical fiber is used for tensioning and limiting, so that the positioning stability of the optical fiber is integrally improved, and the connection safety of the optical fiber is ensured. The invention also provides a connection box.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER

Novel jig facilitating detection of liquid crystal display screen

PendingCN110554524AAvoid manually sensing the location of the interfaceGuaranteed accuracyStatic indicating devicesNon-linear opticsLiquid-crystal displayEngineering
The invention discloses a novel jig facilitating detection of a liquid crystal display screen. The jig comprises a flip cover and base, wherein a connecting seat is fixedly mounted at the bottom of the flip cover; a mounting block is fixedly mounted on one side of the base; an upper groove is formed in one side, close to the base, of the flip cover; a lower flange is arranged on the front face ofthe side, close to the flip cover, of the base; the lower flange and the upper groove are used in cooperation; a PCB is fixedly installed between the upper groove and the lower flange; a positioning block is fixedly installed on the edge of the front face of the base, and installation holes are formed in one side of the base and a corresponding side of the flip cover. According to the novel jig facilitating detection of the liquid crystal display screen, through mutual cooperative use of the upper groove, the lower flange, a positioning guide column, the positioning hole and the positioning block, the situation that a detector senses the position of a connector manually in the detection process of the device is avoided; the accuracy of connection between the connectors is ensured, meanwhile, the overall production efficiency of the device is improved, and the production cost is reduced.
Owner:南京习成机电科技有限公司

Fruit protection mesh bag with coconut windproof function

The invention relates to the technical field of packaging bags, and discloses a fruit protection mesh bag with a coconut windproof function. The fruit protection mesh bag comprises a fixing belt, wherein the fixing belt comprises a belt body, a ductile layer, a mounting buckle and a first reserved hole, the ductile layer is fixedly connected to the interior of the belt body, the mounting buckle is fixedly connected to the lower portion of the belt body, the first reserved hole is formed in the mounting buckle, a bolt is fixedly connected to the lower portion of the fixing belt, and the bolt comprises a nut, a first gasket, a screw rod, a second gasket and a nut cap. According to the fruit protection mesh bag with the coconut windproof function, through cooperative work of the fixing belt, the bolt, a limiting plate, a connecting base, a ferrule, a welding base, a supporting belt, a toughness strip, a supporting strip, a tray and a fixing ring, the overall toughness of the mesh bag is better improved, the mesh bag can be better matched with sizes in different growth processes through the improvement of the toughness, and the overall safety and the coating integrity of the equipment are better guaranteed.
Owner:海南瑞民农业科技有限公司

Generation method for improving waveband selectivity of DUV light source

The invention discloses a generation method for improving wave band selectivity of a DUV light source. The generation method comprises the following steps that 1, a generation device for producing a DUV is assembled; 2, the interior of the quartz tube is vacuumized through a vacuumizing assembly; step 3, filling gas into the quartz tube through an inflation assembly; step 4, turning on a high-voltage pulse power supply, and forming pulse voltage and a strong electric field on the high-voltage electrode; step 5, exciting gas molecules or atoms in the tube by a strong electric field to form a high-speed moving ionization wave and move towards a low-voltage end; 6, forming a plasma region containing a large number of excited-state molecular atoms and ions in the movement process of the ionization waves; 7, the excited-state molecules in the plasma area can form a large amount of optical radiation in the de-excitation process, and therefore a DUV light source is formed; according to the invention, the trial and error cost can be greatly reduced, and the waveband selectivity of the DUV light source is improved.
Owner:AIR FORCE UNIV PLA

Internet of Things multi-terminal connection data processing method

The invention provides an Internet of Things multi-terminal connection data processing method, which is realized based on an Internet of Things multi-terminal connection data processing system. The data processing method comprises the following steps: S1, connecting N field data acquisition terminals with N storage devices through automatically detachable data interfaces by using a field mechanical transmission device; S2, acquiring field state data through THE field data acquisition terminalS, and sending the field state data to a local processing terminal through a wired cable; and S3, by the local processing terminal, performing trend analysis on the field state data based on a data trend prediction model. According to the technical scheme, data exception can be recognized in time whiledata connection and transmission safety can be guaranteed.
Owner:重庆知遨科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products