The invention discloses a fully-mechanized excavation face superhard rock positive fault blasting method which comprises the following steps: S1, according to a result of numerical
simulation calculation, intercepting
effective stress nephograms of a numerical model at different moments for contrastive analysis; s2, constructing a
coal rock model to carry out a blasting similar
simulation experiment; s3, calculating a tectonic zone control range according to the
normal fault fall; s4, energy-gathered blasting holes and control holes are formed in the fault working face according to blasting specifications; s5, the energy gathering direction of energy gathering blasting is arranged; s6, the blasting holes are filled with energy-gathered cartridges, and directional blasting is achieved; s7, forward charging is adopted as the charging mode; and S8, blasting and weakening the hard rock to finish tunneling of the
roadheader. According to the method, the super-hard rock
normal fault can be safely and rapidly blasted, the hard rock is fractured in a preferable
shaped charge blasting mode in a
normal fault structure area, the
rock body weakening and roadway supporting effects are good, the problem that dynamic disasters such as surrounding rock
instability are induced by common blasting disturbance is effectively solved, and roadway tunneling is safely and efficiently carried out.