The invention relates to a water network zone
lime solidified
soil test section filling design method. The water network zone
lime solidified
soil test section filling design method comprises the steps that S1, an ash mixing proportion is designed, specifically, firstly, a corresponding ash mixing amount proportion is designed according to the
moisture content of
slurry drying soil, ash is mixed twice, quick
lime blocks are mixed for the first time, turning over, stirring and material braising are carried out, crushing is carried out for the second time, then ash is mixed for the second time, and mixing and discharging are carried out by adopting a forced mixing
machine; S2, paving and rolling are carried out; and S3, maintenance and detection are carried out, specifically, when solidified soil embankment interlayer filling is continuously carried out, extra maintenance is not needed. The water network zone lime solidified
soil test section filling design method has the beneficial effects that for the first layer and the second layer of the solidified soil embankment in the water network zone, the processes of pouring unloading, super-
layer thickness filling and
cement curing agent
doping are adopted in a loaded area, and bottom layer roadbed filling can be smoothly carried out; and a paver paving process is adopted at the third layer, so that environmental
pollution caused by road mixing and ash mixing is avoided, and the working efficiency, the roadbed flatness and other qualities are remarkably improved.