Construction method for widening roadbed

A construction method and subgrade technology, applied in the field of civil engineering, can solve problems such as deformation at the splicing of new and old roads, difficulty in excavation and slope clearing, asynchronous construction, etc., achieve good economic and social benefits, reduce subgrade settlement, Improve the effect of construction progress

Inactive Publication Date: 2021-01-12
ROAD & BRIDGE INT +1
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] (1) During the reconstruction of the old road, the spliced ​​road is different from the original road in terms of consolidation methods, foundation treatment, construction technology, and filler type. After years of operation, the settlement of the old road has been basically completed. Road and vehicle loads will inevitably cause additional settlement of the old road, which will lead to uneven settlement between the new and old roads, which will cause deformation of the joint between the old and new roads, and cracks and other diseases in severe cases;
[0007] (2) In terms of the number of layers of geotechnical materials laid, the inconsistency of the position and the depth of research, there is a big difference between the effect of geotechnical materials used in the splicing of new and old roads and the effect of theoretical engineering construction, and the settlement of the junction between the new roadbed and the old roadbed If the compensation measures are not well-taught construction measures, it can only be remedied through engineering and technical measures such as continuous reinforced cushion and reinforced embankment, geotextile anti-seepage and drainage in the later stage, which will affect the firmness of the splicing joint;
[0008] (3) When the new subgrade and the old subgrade are over-excavated to form the wide-faced steps, the previous slope-clearing operations are all asynchronous construction, so that during the foundation-building process, the step slopes on both sides form different stress-tension structures. At the same time, the slope dikes on both sides of the old subgrade have changed over a long period of time, and the angles of the slope dikes on both sides are different, which has caused certain difficulties in excavating and clearing the slope, thus affecting the laying of the new subgrade base.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiment of the application will be clearly and completely described below in conjunction with the embodiment of the application. Obviously, the described embodiment is only a part of the application Examples, but not all examples. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the scope of protection of this application.

[0031] It should be noted that the terms "first" and "second" in the specification and claims of the present application are used to distinguish similar objects, but not necessarily used to describe a specific order or sequence. It should be understood that the data so used may be interchanged under appropriate circumstances for the embodiments of the application described herein. Furthermore, the terms...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of civil engineering, in particular to a roadbed widening construction method which is technically characterized by comprising the following steps: S1, dismantling and cleaning; S2, excavating the old road: after the old road is removed, excavating the old road part in a stepped manner, and paving geogrids, wherein the step-type excavation step comprises the steps that S21, the slope toe part of the old road is excavated, that is, the height of the lowermost layer of step is 1 m, the width of the lowermost layer of step is 2 m, and original ground treatment is conducted after leveling, S22, after original ground treatment is finished, a first layer of 60cm gun slag is filled, impacted and rolled, after soil is filled to the top of a first step,a slope in the middle of the old road is excavated, the size and width of the middle step are larger than or equal to 1m, and the height of the excavated step is the filling thickness; S23, during roadbed top layer construction, excavation is conducted on the side, close to an old road soil shoulder, of the roadbed top layer, and during the period, soil layer filling is impacted and rolled once every 1.5 m thick; and S3, soil filling roadbed construction is conducted, specifically, a cross section full-width and longitudinal and horizontal layered filling compaction method is adopted.

Description

technical field [0001] The present application relates to the technical field of civil engineering, in particular, to a construction method for widening roadbeds. Background technique [0002] With the rapid development of my country's national economy, many two-way four-lane expressways built in the early stage of the country can no longer meet the existing traffic flow requirements. Expressway reconstruction and expansion projects have become a key issue in the development of expressways in recent years. The main direction of development is very necessary for the research on the reconstruction and expansion of expressways under various construction conditions. Development, the research on the widening of interchange ramps is an important aspect that urgently needs to be studied. [0003] Expressway expansion and widening projects are different from new projects, lacking corresponding norms and design standards, and there are many technical issues that need to be explored an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01C3/00E01C3/04E02D17/18
CPCE01C3/00E01C3/04E02D17/18
Inventor 何艳龙钟凯侯兆隆赵永旭韩继春
Owner ROAD & BRIDGE INT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products