Control method of compaction degree of layered filling of high liquid limit soil
A technology of layered filling and high liquid limit soil, applied in buildings, roads, roads, etc., can solve problems such as failure to meet compaction standards, waste, and property differences, so as to ensure quality, ensure reliability, and reduce damage Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0009] A method for controlling the compaction degree of layered filling of high liquid limit soil, comprising the following steps:
[0010] A. Before the layered filling in the expressway or first-class highway embankment project, the consistency of the filler ( ) for inspection: when the consistency of the filler is less than 0.8, it cannot be used as embankment filler and should be treated as discarded cube; when the consistency of the filler is between 0.80 and 1.15, the filler needs to be dried before filling; When the consistency of the filling ( ) is above 1.15, it is qualified and can be directly filled.
[0011] The relationship between consistency and soil dispersibility and compaction and dry and wet state is as follows:
[0012] The consistency is 1.15~1.70: the dispersible compaction is heavy compaction; the consistency is >1.0; the dry and wet state of the soil is dry; the state of the soil is semi-solid;
[0013] The consistency is 1.05~1.15: the dispersibl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com