Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

60results about How to "Reduce the possibility of misalignment" patented technology

Self-aligned trench contact and local interconnect with replacement gate process

A semiconductor device fabrication process includes forming insulating mandrels over one or more replacement metal gates on a semiconductor substrate. The mandrels include a first insulating material. Each mandrel has approximately the same width as its underlying gate with each mandrel being at least as wide as its underlying gate. Mandrel spacers are formed around each insulating mandrel. The mandrel spacers include the first insulating material. Each mandrel spacer has a profile that slopes from being wider at the bottom to narrower at the top. A second insulating layer of the second insulating material is formed over the transistor. Trenches to the sources and drains of the gates are formed by removing the second insulating material from portions of the transistor between the mandrels. Trench contacts to the sources and drains of the gates are formed by depositing conductive material in the first trenches.
Owner:ADVANCED MICRO DEVICES INC

Integrated semi-direct drive wind generator transmission chain and gearbox for same

The invention provides an integrated semi-direct drive wind generator transmission chain and a gearbox for the same. The gearbox comprises a front box body (6), a rear box body (14), a spindle (5) and a planetary carrier (10), a large-diameter portion (5-3) of a downwind end of the spindle is fixedly connected with an inner gear ring (7), the inner gear ring (7) is engaged with at least three idle gears (8) mounted on the planetary carrier (10), the inner gear ring (7), the idle gears (8) and a first planetary gear form a primary fixed shaft transmission pair, a portion of each planetary gear shaft (13) extending out of the planetary carrier (10) is connected with a secondary planetary gear (15), the secondary planetary gear (15) is positioned in a cavity formed by the planetary carrier (10) and the rear box body (14) and engaged with the same sun gear (17), and the secondary planetary gear (15) and the sun gear (17) form a secondary fixed shaft transmission pair. The gearbox has the advantages of integration, light weight, short axial length, convenience in disassembly and assembly and the like.
Owner:CRRC QISHUYAN INSTITUTE CO LTD

Back face welding method and welding table for aluminum curtain wall plates

The invention discloses a back face welding method and a welding table for aluminum curtain wall plates, and relates to the technical field of back face welding. According to the key points of the technical scheme, the back face welding method comprises the following steps that a to-be-welded first aluminum curtain wall plate is taken to be provided with a square inserting groove, a second aluminum curtain wall plate is taken, and a square inserting block is fixed; the front faces of the two aluminum curtain wall plates are downwards placed on a base, and the square inserting block and the square inserting groove are connected in an inserted mode; and welding is conducted from the back face joint of the two aluminum curtain wall plates. The welding table comprises the base, two abutting pieces and two sets of pressing devices; each set of pressing device comprises two supporting rods and two pressing plates; and a driving mechanism for driving the supporting rods to rotate is arrangedbetween each supporting rod and the corresponding abutting piece. According to the back face welding method and the welding table for the aluminum curtain wall plates, the problem that a coating is damaged by the high temperature during welding is solved, and possibility that the coating of the wall plates is damaged by the high temperature during welding is reduced. In addition, the welding tablehas the advantage that the aluminum curtain wall plates are fixed in the welding process.
Owner:江苏诺米新材料科技有限公司

Filter assembly

A filter assembly for removing material entrained in a fluid stream, comprises a housing for a filter element, having a head part and a body part for receiving a filter element, and inlet and outlet ports for the fluid that is to be filtered. The head part and the body part each have engagement formations which enable the head and body parts to be connected to one another and separated by relative rotation about an axis which is coaxial with a head axis and a body axis. Head and body part keying formations can be provided in the form of at least one recess which is provided in a rib on one ofthe head and body parts, and at least one projection which is provided on the other of the head and body parts. The keying formations require alignment of the head and body axes for initial assembly of the head and body parts when the projection is can be received in the recess in the rib so as to restrict relative rotation of the head and body parts, and so that the head and body parts can then to be moved to an assembly position in which the projection has passed through the rib so that the head and body parts can be rotated relative to each other to allow the engagement formations to become engaged to one another.
Owner:PARKER HANNIFIN CORP

High-torque low-speed permanent magnet synchronous motor hoisting load on-line detection system and detection method

The invention relate to a high-torque low-speed permanent magnet synchronous motor hoisting load on-line detection method and a system. The system comprises a high-torque low-speed magnet synchronous motor, a control device, and a signal collecting device used for acquiring current signals of the motor. The signal collecting device relates to a current sensor used for collecting current inputting signals and/or a frequency converter capable of outputting current outputting signals. According to the online detection method, the current signals of the motor are acquired; the current signals are adopted as sensing signals of the hoisting load, or hoisting load data of the motor can be calculated according to the current signals; a current threshold when the hoisting load is overload is set; and when the collected current signals reach or exceed the set current threshold, the motor is stopped and/or an overload alarm is given. The detection method and the system are simple in structure, and convenient, rapid, accurate and reliable in signal detection, and are particularly suitable for load/hoisting load detection of the high-torque low-speed permanent magnet synchronous motor and a crane gearless hoisting mechanism based on the motor.
Owner:ZHANGSHU ZHISHENG FORGING

Assembly type cement concrete pavement structure with prestress

An assembly type cement concrete pavement structure with prestress comprises a first concrete plate and a concrete plate assembly which are connected in sequence, the first concrete plate and the concrete plate assembly are arranged in a spaced mode, and a plurality of prestress hole channels are formed in the first concrete plate and the concrete plate assembly; a plurality of first anchorage devices and a plurality of second anchorage devices are fixedly connected to the top ends of the first concrete slabs respectively and located at the two sides of the first concrete slabs respectively, first steel bars are arranged between the first anchorage devices and the second anchorage devices on the adjacent first concrete slabs, and the two ends of the first steel bars are fixedly connected with the first anchorage devices and the second anchorage devices respectively. and second reinforcing steel bars are arranged between the second anchorage devices and the first anchorage devices on the other adjacent first concrete plate. The step of applying prestress by tensioning the steel bars can be omitted, the construction efficiency is improved, meanwhile, the connection relation between the two adjacent prefabricated road plates is improved, and the possibility that the two adjacent prefabricated road plates are dislocated is reduced.
Owner:RES INST OF HIGHWAY MINIST OF TRANSPORT

Interface display method, terminal equipment and computer readable memory medium

The invention discloses an interface display method, terminal equipment and a computer readable memory medium. The display method applied to the terminal equipment comprises the steps of determining at least one piece of household equipment associated with the terminal equipment; displaying at least one function key corresponding to the household equipment in a display area on the terminal equipment; obtaining a selection instruction for correspondingly selecting any function key, and determining a scene interface corresponding to a selected function according to the selection instruction; anddisplaying the scene interface. The problem that in the prior art, the scene interfaces and the selected function are not in one-to-one correspondence is solved, a visual effect is relatively good, auser can determine the selected function according to a scene, and the user has the feeling of immersive.
Owner:GD MIDEA AIR-CONDITIONING EQUIP CO LTD

Novel plugging box fixation member

The invention discloses a novel plugging box fixation member. The novel plugging box fixation member comprises casing fixation seats, long bolts, casing fixation hooks and lead-in cylinders, wherein the cross section of each casing fixation seat is horizontally-n-shaped, the side surface of each casing fixation seat is symmetrically provided with long waist-shaped holes, the upper surface and the lower surface of each casing fixation seat are each symmetrically provided with two grooves, a guide plate is arranged between the two grooves in any one surface of each casing fixation seat, and the guide plate is symmetrically provided with lead-in holes; and one end portion of each casing fixation hook is provided with a through hole, the casing fixation hooks pass through the long waist-shaped holes through the long bolts, the through holes are fixed in the casing fixation seats, and the lead-in cylinders are fixed in the lead-in holes of the casing fixation seats. According to the invention, the casing fixation seats can protect the casing fixation hooks, prevents the casing fixation hooks from bumps, the grooves in the casing fixation seats also have a positioning effect, the possibility of deviated plugging of a plugging box is reduced, and the lead-in cylinders can provide accurate positioning for the plugging box; and at the same time, the casing fixation hooks employ S-shaped structures, the plugging box is enabled to be fixed more firmly and not slide down due to a dead weight, and thus safe operation is guaranteed.
Owner:江苏向荣电气有限公司

Pipe piles and open caisson combined construction method

The invention discloses a pipe pile and open caisson combined construction method. The method comprises the steps of (1) geological exploration; (2) designing measurement calculation; (3) site leveling; (4) construction of pipe piles; (5) connecting an open caisson casting blade angle and the pipe piles into a whole; (6) sinking combination of an open caisson and the pipe piles; (7) enabling the open caisson in place; (8) construction of an open caisson cushion layer; (9) secondary construction of the open caisson and the pipe piles; (10) secondary pile construction and connection constructionof the open caisson cushion layer. Firstly, the pipe piles are driven into the soil, due to the fact that the pipe piles firstly sink into the ground to be positioned, deviation possibly generated inthe sinking process of the open caisson is reduced, the sinking speed can be controlled, the open caisson can be formed at a time, the time taken for disassembling and reshipping a scaffold and a formwork during sectional manufacturing of the open caisson can be shortened, the working efficiency is improved, and the construction period is shortened; and the pipe piles and the open caisson are poured into a whole and then sink, the mode that the cast-in-place piles are broken while then soil is taken is replaced, the construction difficulty is reduced, resources are effectively saved, and thecost is effectively controlled.
Owner:南京市市政设计研究院有限责任公司

Preparation method of purple rice sandwich toast bread

The invention discloses a preparation method of purple rice sandwich toast bread, and belongs to the technical field of food processing. The technical scheme key point of the preparation method comprises the following steps of: S1, preparing materials; S2, kneading dough; S3, freezing; S4, making pastries; S5, forming and fermenting; S6, baking; and S7: slicing and adding fillings. An automatic pastry making machine comprises a frame body, a dough sheet pressing device and an adjusting device, wherein a first conveying piece and a second conveying piece are horizontally arranged on the frame body; one end, which is far away from the dough sheet pressing device, of the first conveying piece communicates with a rotary conveying piece; the other end of the rotary conveying piece communicates with the second conveying piece; the dough sheet pressing device is positioned between the first conveying piece and the second conveying piece; and the adjusting device is positioned in the first conveying piece. The automatic pastry making machine has the effect that manual pastry making does not need to be carried out.
Owner:漳州好名新食品有限公司

Built-in steel column fixing system and application construction method thereof

The invention relates to a built-in steel column fixing system and an application construction method thereof. The built-in steel column fixing system includes a column base foundation, a connecting rod, an embedded steel plate and a column base plate. The column base foundation is provided with a foundation pit, and a fixing net is laid in the foundation pit; one end of the connecting rod is connected with the fixing net, and the other end of the connecting rod penetrates through the embedded steel plate and is connected with the embedded steel plate; the column base plate is arranged to be in parallel with the embedded steel plate, the column base plate is provided with a connecting hole, and the connecting rod passes through the connecting hole and is connected with the column base plate after penetrating out of the embedded steel plate; and a slurry layer fills a space between the embedded steel plate and the column base plate. According to the built-in steel column fixing system,by adopting the fixing system, the accuracy of steel column in-position is improved; and the slurry layer directly fills the space between the embedded steel plate and the column base plate, so that the compactness of the embedded steel plate and the column base plate is strengthened, the possibility of steel column deviation is reduced, and the horizontal accuracy is improved. In addition, the application construction method of the built-in steel column fixing system is simple in steps and convenient to operate, thus being suitable for popularization.
Owner:SHANGHAI CONSTR NO 5 GRP CO LTD

Mounting structure of fabricated building and construction method of fabricated building

ActiveCN113184737AEasy to stop pay-offImprove difficulty in judging heavy objectsWinding mechanismsBuilding material handlingPipe fittingGear wheel
The invention relates to a mounting structure of a fabricated building and a construction method of the fabricated building. The mounting structure of the fabricated building comprises a hoisting platform and a hoisting device, the top of the hoisting platform is connected with a first supporting rod in a sliding manner in the vertical direction, and a second supporting rod is fixed to the top of the hoisting platform. A winding drum and a gear ring are rotationally connected to one side of the first supporting rod and fixedly connected. A first gear engaged with the gear ring is rotationally mounted on one side, close to the first supporting rod, of the second supporting rod. The construction method of the fabricated building comprises the steps that the steel pipe fittings, a main beam and a secondary beam are prefabricated, and a plurality of mounting notches used for being connected with the steel pipe fittings are formed in the main beam and the secondary beam correspondingly; the main beam is hoisted and lifted on the surface of a mounting platform; the steel pipe fittings are hoisted to the main beam, and the steel pipe fittings are fixed in the mounting notches in the main beam correspondingly; and the secondary beam is hoisted to the top ends of the steel pipe fittings, and the steel pipe fittings are fixedly connected with the secondary beam through the mounting notches in the secondary beam. The mounting structure of the fabricated building and construction method of the fabricated building have the effect of conveniently judging whether a heavy object is in contact with the lower platform or not.
Owner:广东铭濠润建工有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products