The invention relates to a high-steep
terrain bridge-tunnel connecting digging-after-filling
foam concrete transition structure. The high-steep
terrain bridge-tunnel connecting digging-after-filling
foam concrete transition structure comprises a bridge
abutment, a bridge
pile, a
foam concrete embankment, recycling anchor rods, a tunnel bottom plate, a tunnel lining,
glass fiber reinforced plasticanchor rods,
reinforced concrete chipping table, a foam concrete filling body, a
reinforced concrete portal, a bituminous pavement and a
reinforced concrete plate. The foam concrete embankment is mounted on a transition segment between the bridge
abutment and a tunnel portal, steps are mounted on a foundation on the bottom of the foam concrete embankment, slopes are mounted on two sides of the steps and the foam concrete embankment, the recycling anchor rods are mounted in slope surface foundations of the step slopes, anti-sliding anchor nails are mounted on the bottoms of the steps, and the structure has the beneficial effects that the foam concrete embankment is mounted on the transition segment between the bridge
abutment and the tunnel portal, the foam concrete embankment is small in
mass, small in foundation settlement and meanwhile, good in strength and whole rigidity, the elasticity modulus of foam concrete is close to a tunnel and a bridge, and transition from the tunnel to thebridge is uniform through the foam concrete embankment