The invention provides a self-resetting
steel frame beam-side column joint and a construction method thereof. The self-resetting
steel frame beam-side column joint comprises a steel beam, wherein thesteel beam is horizontally arranged on one side of a steel column; a
shape memory alloy plate is arranged between a
flange of the steel beam and a
flange of the steel column, and the
shape memory alloy plate is arranged on the outer side of the
flange of the steel beam; one end of the
shape memory alloy plate is connected with the flange of the steel beam, and the other end of the shape memory
alloy plate is connected with the flange of the steel column; and friction energy dissipaters are symmetrically arranged on the two sides of a web of the steel beam, one end of each friction energy dissipater is connected with the steel beam, and the other end of each friction energy dissipater is connected with the flange of the steel column. According to the self-resetting
steel frame beam-side column joint and the construction method thereof, the shape memory
alloy plate is arranged, and the self-resetting function of the joint is achieved by utilizing the plastic deformation of the shape memory
alloy plate; and friction energy dissipation can be achieved between the friction energy dissipaters and the flange and the web of the steel beam, and the friction energy dissipaters and the shapememory alloy plate generate a synergistic effect to jointly absorb
seismic energy at the joint, so that the structural
ductility and energy dissipation capacity of the steel frame beam-side column joint are effectively improved, and the post-earthquake repair cost of the structure is reduced.