Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

33 results about "Cement fixation" patented technology

Establishing method of experimental lower limb rhythm movement rat model and applications of establishing method

The invention relates to the field of biology, and in particular relates to an establishing method of an experimental lower limb rhythm movement rat model and applications of the establishing method.The establishing method comprises the following steps: S1, carrying out spinal nerve lower limb movement functional localization simulation on a rat by adopting a method of electronics; S2, carrying out three-dimensional scanning type electrical stimulation, and recording the key points of CPG; S3, fixing a silica gel tube through which an electrode wire penetrates to the spinous process of the spine by adopting dental cement; and S4, acquiring electromyographic signals of key muscle relevant to lower limb movement. For the method disclosed by the invention, the key points of CPG movement arefound through microstimulation in the spine, so that the regulation for the paralyzed lower limb movement is realized, and a research basis is provided for greatly reducing the complexity of the surgery and reducing the number of implantation neural electrodes in clinical practice in the future.
Owner:NANTONG UNIVERSITY

Paver for constructional engineering

The invention relates to the field of constructional engineering, in particular to a paver for constructional engineering. A cement stirring combination is adopted for conducting paving and paving a cement fixation layer between the ground and stone bricks for paving; a spacing adjusting combination in a stone brick combination is utilized for adjusting the spacing of paved stone bricks; the stonebrick combination automatically paves the stone bricks; a damping casing pipe in a movable bracket is utilized for increasing buffering for the paver; the paver comprises the stone brick combination,the cement stirring combination, the movable bracket and a driving belt, and through rotary connection of a first lower roller, a second lower roller, a third lower roller, a fourth lower roller, a fifth lower roller and a sixth lower roller with a stone brick bracket, transportation of the stone bricks for paving in the stone brick bracket is facilitated; through squeezing between a rolling compaction roller and the stone bricks for paving, convenience is brought for the stone bricks for paving to pass through the inner end of the stone brick bracket; the spacing adjusting combination adjusts the spacing among the stone bricks for paving; mixtures of limestone and sand gravels are conveniently added into an outer frame through a feeding hole; mixed cement is conveniently discharged out of the outer frame through a discharging pipe.
Owner:天长市市政建筑有限责任公司

Building interior wall heat retaining board and manufacturing method thereof

The invention discloses a building interior wall heat retaining board and a manufacturing method thereof. The interior wall heat retaining board is low in cost and environmentally friendly. The building interior wall heat retaining board is characterized in that the building interior wall heat retaining board is composed of cement fixing layers, a coconut tree brown layer, steel wire meshes, diatomite and a plurality of communicating holes, wherein the coconut tree brown layer is in the middle, the steel wire meshes are arranged on and under the coconut tree brown layer correspondingly, the multiple communicating holes are evenly formed in the coconut tree brown, the cement fixing layers are poured on the outer sides of the two steel wire meshes, and the cement fixing layers on the two sides are connected with cement columns by penetrating through communicating holes. The outer side of each of the cement fixing layers is coated with a layer of the diatomite, the thickness of the coconut tree brown layer is one third of the thickness of the whole heat retaining board, the middle of the coconut tree brown is compact, the two sides of the coconut tree brown are floppy, and the floppy position of the coconut tree brown and the cement fixing layers are inlaid into each other. The interior wall heat retaining board prepared by adopting the method is environmentally friendly and harmless, low in manufacturing cost and easy to popularize.
Owner:徐州市帝龙新型墙体材料有限公司

Fabricated separating wall composite wall body

The invention relates to the technical field of composite walls, in particular to a fabricated separating wall composite wall body. The fabricated separating wall composite wall body comprises a base, the base is characterized in that a plurality of supporting columns fixedly connected with the ground through cement are arranged in the middle of the base, a plurality of square rods are fixedly connected to the outer side walls of the supporting columns at equal intervals, the outer side wall of the square rod is slidably connected with a connecting piece, and the two ends of the connecting piece are each provided with a composite wallboard. According to the fabricated separating wall composite wall body, the multiple composite wallboards integrally move in the direction of check blocks of the square rod, the composite wallboards drive the connecting pieces at the corresponding positions to synchronously move in the direction of the check blocks, under the action of the limiting mechanisms, the connecting pieces are not clamped and fixed to connecting heads any more, the composite wallboards are rapidly detached, recycling of resources is effectively improved, two oppositely arranged rectangular wallboards are staggered with each other and are connected with different connecting pieces, so that the rectangular wallboards are firmly fixed on the supporting columns, and the stability of the composite wallboard after installation is further improved.
Owner:熊磊

Local vegetation ecological soil environment improvement device for preventing water and soil loss of barren mountains

The invention relates to the field of soil improvement of water and soil loss of barren mountains, and discloses an local vegetation soil environment improvement device for preventing water and soil loss of barren mountains, which comprises a mountain body, a planting device, a rainproof device and a water storage and supplement device, wherein the mountain body comprises a mountain top, a mountain slope and a mountain bottom; the rainproof device comprises a plurality of cement fixing piles, a plurality of supporting columns, two sets of sliding rails, two sliding sleeves and a folding rainproof net, the plurality of cement fixing piles are fixedly poured on the mountain slope, the supporting columns are used for fixedly arranging the sliding rails on the cement fixing piles, sliding grooves are formed in one sides of the sliding rails, tooth grooves are formed in the other sides of the sliding rails, the sliding rails are sleeved with the sliding sleeves, and the sliding sleeves are slidably connected along the sliding rails. The folding rainproof net can be opened in time when heavy rainfall occurs, surface soil and vegetation of barren mountains are protected, rainwater can be collected, water is automatically supplemented to the vegetation when needed, and therefore the problem that the soil improvement effect is not ideal due to water and soil loss of the barren mountains is effectively solved.
Owner:HANGZHOU ZHONGYI ECOLOGICAL ENVIRONMENTAL ENG CO LTD

Sidewalk floor tile hollowing repairing machine with automatic detection function

The invention discloses a sidewalk floor tile hollowing repairing machine with an automatic detection function. A balance weight bin is included. A movable support is fixedly arranged on the lower endsurface of the balance weight bin. A working cabin body is fixedly arranged on the left end surface of the balance weight cabin; a cement storage cavity is formed in the working cabin body; a discharging cavity penetrating through the inner wall of the lower side of the cement storage cavity is formed in the inner wall of the lower side of the cement storage cavity; a first sliding cavity with adownward opening is formed in the working cabin body; and a pouring device is arranged in the first sliding cavity. According to the machine, a hollowing condition of the floor tiles can be detected in batches according to a prizing characteristic of the floor tiles after hollowing, and meanwhile, cement can be poured again for the hollowing floor tiles in batches for fixing; and due to a fact that an automation degree is high, in a detecting and repairing process, the working efficiency is high, and the labor cost is low.
Owner:绍兴夏鸥科技有限公司

Knee joint prosthesis structure

A knee joint prosthesis structure comprises a thighbone component, a cushion block component, a tibia component and a patella component, the thighbone component is provided with an intercondylar fixing block, the intercondylar fixing block is provided with a protruding part, the inner wall of the thighbone component is provided with a first coating used for bone ingrowth or bone growth, the cushion block component is located between the thighbone component and the tibia component, the outer wall of the lower end of the tibia component is provided with a second coating used for bone growth or bone length, the patella component is located in front of the thighbone component, and the inner wall of the patella component is provided with a third coating used for bone growth or bone length. The knee joint prosthesis structure is a biological type fixed prosthesis structure, various defects and complications caused by bone cement fixation can be avoided, harm to patients and surgical related medical staff due to current bone cement application is reduced, the long-term stability of the prosthesis is improved, the prosthesis loosening rate and the surgical revision rate are reduced, the cost is saved, and the cost is reduced. and the problem of precious medical observation is solved, and great social effect and economic benefit are achieved.
Owner:邬黎平

A special-shaped column node connection structure for prefabricated buildings

The invention belongs to the technical field of prefabricated buildings, in particular to a special-shaped column node connecting structure for prefabricated buildings. The special-shaped column nodeconnecting structure comprises special-shaped columns and transverse beams perpendicular to the special-shaped columns, wherein a plurality of reinforcing parts are arranged at connecting parts of thetransverse beams and the special-shaped columns and are distributed at the two sides of the transverse beams; the reinforcing parts are fixed to the transverse beams and reinforcing parts through bolts in a screw joint manner; by arranging the plurality of reinforcing parts at the connecting parts of the transverse beams and the special-shaped columns, the transverse beams can be fixed from the upper parts, lower parts and middle parts of the transverse beams; the bolts are used for fixing the reinforcing parts, the transverse beams and the special-shaped columns, so that the special-shaped column node connecting structure is convenient to install by a worker, and the installation time is shortened; the bolts extending into a cavity part are bound by longitudinal reinforcing ribs and transverse reinforcing ribs, and then the cement concrete is poured into the cavity; the bolts are fixed by cement in a manner of combining cement pouring and bolt installation; and the structure can be relatively stable while the installation time is shortened.
Owner:江苏硕尔邦新材料科技有限公司

Treatment system for homogenization of solid medium formula and method therefor

The invention discloses a treatment system for homogenization of a solid medium formula and a method therefor. The system is applied to cement grouting fixation for medium- and low-radioactive wastesin nuclear industry. The system includes a cement metering and storing system, a water metering system, and additive metering and storage system, a mixing bin, a stirring system and a pumping system.The method includes the steps of: 1) according to formula demand of cement fixation of a nuclear power plant, feeding a cement dry material to a first-stage stirring bin according to preset quantity via a dry material storage bin; 2) according to the formula demand, feeding a liquid component to the mixing bin to initially mix the components in the mixing bin, and feeding the mixture to the first-stage stirring bin; 3) at the same time, performing initial stirring to the cement dry material, an additive and water in the first-stage stirring bin, thus preparing a mixture body; 4) after the initial stirring is completed, feeding the mixture body into a secondary initial bin to perform fine stirring; 5) after the secondary stirring is completed, feeding the mixture body to a cement grouting station through the pumping system. The treatment system and the method are different from systems and methods applied generally in nuclear power plants, wherein secondary stirring is designed, so thatmaterials are stirred more homogeneously.
Owner:CHINA NUCLEAR POWER TECH RES INST CO LTD +1

Cement precast pile connecting piece

The invention relates to the field of precast pile installation, in particular to a cement precast pile connecting piece which comprises a fixing mechanism, a reinforcing mechanism, a linkage mechanism and a joining mechanism. Each penetrating through hole is composed of two intersecting through holes, the steel bars of the precast piles at the upper end and the lower end are inserted into the same penetrating through hole, the two steel bars do not abut against each other or interfere with each other and are provided with coincident parts, and therefore the strength of the connecting position is enhanced. The poured cement is guided into the penetrating through holes through the pouring straightway and the pouring channel, so that the reinforcing steel bars inserted into the penetrating through holes are subjected to cement fixation; when the limiting sliding rod moves in the penetrating through hole direction, the reinforcing hammer head extrudes the reinforcing steel bar inserted into the reinforcing hammer head to the side wall, so that the reinforcing steel bar is fixed, and the connection stability is enhanced; all the components of the reinforcing mechanism are connected through the linkage mechanism, so that all the components of the reinforcing mechanism are synchronized, and the situation that the reinforcing mechanism cannot achieve the reinforcing function due to the fact that a single component does not work is prevented.
Owner:李硕

construction paving machine

The invention relates to the field of constructional engineering, in particular to a paver for constructional engineering. A cement stirring combination is adopted for conducting paving and paving a cement fixation layer between the ground and stone bricks for paving; a spacing adjusting combination in a stone brick combination is utilized for adjusting the spacing of paved stone bricks; the stonebrick combination automatically paves the stone bricks; a damping casing pipe in a movable bracket is utilized for increasing buffering for the paver; the paver comprises the stone brick combination,the cement stirring combination, the movable bracket and a driving belt, and through rotary connection of a first lower roller, a second lower roller, a third lower roller, a fourth lower roller, a fifth lower roller and a sixth lower roller with a stone brick bracket, transportation of the stone bricks for paving in the stone brick bracket is facilitated; through squeezing between a rolling compaction roller and the stone bricks for paving, convenience is brought for the stone bricks for paving to pass through the inner end of the stone brick bracket; the spacing adjusting combination adjusts the spacing among the stone bricks for paving; mixtures of limestone and sand gravels are conveniently added into an outer frame through a feeding hole; mixed cement is conveniently discharged out of the outer frame through a discharging pipe.
Owner:天长市市政建筑有限责任公司

Quakeproof bridge structure and construction method thereof

The invention discloses a quakeproof bridge structure and a construction method thereof. The quakeproof bridge structure comprises a bridge abutment, a plurality of stand columns are poured at the bottoms of the two ends of the bridge abutment correspondingly and evenly distributed at equal intervals, a bridge pier is poured at the bottoms of the stand columns, and bearing beams are poured on the two sides of the bottom of the bridge pier correspondingly; stabilizing steel bars are poured in the bearing beam, and reinforcing fillers are poured at the two ends of the exterior of the bearing beam correspondingly; secondary side plates and a primary side plate are respectively mounted at the top of the bridge abutment, the secondary side plates are respectively arranged at two ends of the top of the bridge abutment, and the primary side plate is arranged between the two secondary side plates. The modules composed of the main side plates and the secondary side plates are driven into the bridge abutment through the threaded piles, and cement is poured for fixing, so that the modular building mode replaces a traditional reinforced concrete building mode, the working efficiency of the quakeproof bridge during construction and building is improved, and the building cost is indirectly saved.
Owner:CHINA THIRD METALLURGICAL GRP

High stability curb stone and its construction method

The invention discloses a high-stable curb stone and a construction method thereof, and relates to the technical field of road construction. The main points of the technical solution are: the high-stable curb stone includes a stone body, the stone body includes a stone top wall and a stone bottom wall, and the stone body includes a stone top wall and a stone bottom wall. The side wall of the stone body includes a fixed wall for fixing to the sidewalk. The stone top wall is provided with a top hole, and the fixed wall is provided with a side hole, and the side hole is connected to the top hole; Pipe 1, the side hole is pierced with pipe 2, the pipe 1 and pipe 2 are internally connected to form an injection channel, and the two ends of the injection channel are respectively the opening of the top hole and the opening of the side hole. Through the present invention, the cement mortar is more likely to enter the sidewalk and the bottom of the contact part of the curb, so that the installation of the curb is more stable; the installation stability of the curb is further improved through the insertion of the bottom of the tube and the installation hole and the cement fixation; Pipe one and pipe two form a skeleton structure in the stone body, which improves the impact resistance of the curb stone.
Owner:ZHEJIANG DADAO CONSTR ENG CO LTD

High-speed rail platform antiskid ground paving structure and paving method thereof

The invention discloses a high-speed rail platform antiskid ground paving structure and a paving method thereof. The structure comprises a first partition plate, a second partition plate, a third partition plate, a fourth partition plate and screws, inserting holes are formed in the two sides of the first partition plate and the two sides of the third partition plate correspondingly, and first screw holes are formed in the middles of the two ends of the first partition plate and the two ends of the third partition plate correspondingly; inserting blocks are fixed to the middles of the two ends of the second partition plate and the middle of the two ends of the fourth partition plate respectively, second screw holes are formed in the inserting blocks, and the first partition plate, the second partition plate, the third partition plate and the fourth partition plate are sequentially spliced end to end to form a frame. The screws are screwed into the first screw holes and the second screw holes to fix the first partition plate, the second partition plate, the third partition plate and the fourth partition plate; the frame is embedded into the unsolidified cement, and the anti-skidding floor tiles are sequentially embedded into the frame after the cement is solidified. The high-speed rail platform antiskid ground paving structure has the advantages that the frame is fixed to the platform through cement, the anti-skid floor tiles are embedded into the frame, and the damaged anti-skid floor tiles are convenient to replace while the anti-skid floor tiles are fixed.
Owner:济南华锐铁路机械制造有限公司

Simple underground cement setting time point measuring device

The invention belongs to the field of underground simulation measurement and particularly relates to a simple underground cement setting time point measuring device. The device comprises a simulationkettle and a simulation kettle cover connected with the simulation kettle in a sealed mode, wherein cement is placed in the simulation kettle, a heating sleeve is arranged outside the simulation kettle, a stirring rod penetrates through the simulation kettle, the stirring rod comprises a cylindrical rotating rod penetrating through the simulation kettle cover and a sheet-shaped stirring sheet which is fixedly connected with the rotating rod and is used for stirring the cement, and a sealing ring is arranged at a contact part of the rotating rod and the simulation kettle cover. The device is advantaged in that the device is simple in structure, easy to manufacture and convenient to operate, can be simply and effectively used for simulating the situation that the pipeline is fixed by the underground cement, and has a borrowed judgment effect on judgment of the underground cement setting time.
Owner:TIANJIN JINUODA TECH DEV

Anti-theft and anti-jacking inspection well cover

The invention relates to an anti-theft and anti-jacking inspection well cover. The anti-theft and anti-jacking inspection well cover comprises an installing base and a cover body; the installing baseis fixed to the ground through cement, and is internally provided with a supporting ring; one side of the cover body is rotationally connected with a connecting part of the installing base through a hinge; a fixing part is arranged on the side, opposite to the hinge, of the cover body, and is provided with a fixing pin hole; a plurality of fixing pin holes are further formed in the periphery of the cover body; the position, located on one side of each fixing pin hole, of the installing base is cooperatively provided with an electric inserting pin; the electric inserting pins are unlocked and locked by a remote controller held by a professional operator; and the cover body is further provided with a prying hole. According to the anti-theft and anti-jacking inspection well cover, due to cooperation of the electric inserting pins and the fixing pin holes, the cover body is locked to the installing base fixed to the cement ground, and the effects of preventing a theft and jacking caused bylarge water are achieved.
Owner:WUXI MIC IND DESIGN

3D printing preparation method of a light-transmitting cement-based composite material

A 3D printing preparation method of a light-transmitting cement-based composite material. The light-transmitting cement-based composite material is composed of a cement matrix and a light-transmitting column array. The light-transmitting column array is prepared by 3D printing technology. The cement matrix can be prepared by casting molding method first. The light-transmitting column array is printed on the substrate, or the light-transmitting column array with the substrate is directly printed by 3D printing technology, and then cement fixing grooves are placed around the substrate, and then cement slurry is poured and maintained in the gap between the light-transmitting columns. After the cement slurry is completely hardened, the demoulding is carried out and the substrate is removed; the material after demoulding and removal of the substrate is polished and polished, and finally a light-transmitting cement-based composite material with a regular appearance is obtained; the invention can realize the light-transmitting column The array has strong independent design, high dimensional consistency and accurate position adjustment, which solves the problems of complex optical fiber layout process and low position accuracy in the prior art, and has simple process, low labor cost, convenient operation, and easy realization of fast and diversified Production.
Owner:XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Convenient-to-install point switch capable of relieving switch contact fatigue

The invention belongs to the technical field of point switches and relates to a convenient-to-install point switch capable of relieving switch contact fatigue. The convenient-to-install point switch comprises a wall body; a mounting cavity with an upward opening is formed in the wall body; a switch fixing box is fixedly arranged on the upper side of the interior of the mounting cavity through cement; a switch cavity which is through along a vertical direction is formed in the switch fixing box; a panel is arranged on the upper end wall of the switch fixing box; bolt cavities with openings are formed in the panel in a bilateral symmetry mode; bolts for fixedly connecting the panel and the switch fixing box are arranged in the bolt cavities; and a machine body is fixedly arranged on the lower end wall of the panel. Compared with an existing point switch, the convenient-to-install point switch capable of relieving switch contact fatigue is simpler and more convenient to install; the convenient-to-install point switch capable of relieving switch contact fatigue is provided with five sets of contact springs, the contact springs can be switched by stirring a switching piece after one metal elastic piece is fatigue and loses elasticity, and therefore, compared with a point switch with a single contact, the point switch of the invention has a prolonged service life.
Owner:深圳市达立诚科技有限公司

A radiation shielding tile for environmental protection

The invention provides a radioactive shielding tile for environmental protection. The tile comprises a shelter body, a shielding plate, an isolation board, groove bodies, an outer coating board and afixing board; the shelter body is divided into three layers, the middle layer of the shelter body is installed inside, and two layers of shielding plates are fixedly arranged; an isolation plate is embedded at the outmost side of the shelter body; the outer coating plate covers the outer side of the isolation board, the groove bodies are arranged inside the surface layers of the upper and lower ends of the outer coating board; a fixing plate is fixed to the joint of the three layers of the shelter body through cement; injection holes are formed in a gap between the fixing plate and the shelterbody; filling layers are arranged on the two sides inside the shelter body inner layer, and the filling layers are fixed through the fixing plate and installed on the shelter body; an installing contact is installed at the bottom end of the shelter body, and an opening is formed in the position, corresponding to the injection hole, of the installing contact. By arranging the shelter body and thefixing plate, the problems that various internal structures of an existing radioactive shielding device are not high in integration level, and the structural strength and weight cannot be well balanced are solved.
Owner:TAIZHOU HONGLIN IND DESIGN CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products