High stability curb stone and its construction method
A construction method and technology of curb stones, applied in the direction of gutters/curb stones, roads, roads, etc., can solve problems such as insufficient stability of curb stone installation, and achieve the effects of improving installation stability, installation stability, and improving impact resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] refer to figure 2 and image 3 , is a kind of highly stable curbstone disclosed by the present invention, comprising a stone body 1, the stone body 1 is in the shape of a cuboid as a whole, the stone body 1 includes a stone top wall 11 and a stone bottom wall 12, and the stone bottom wall 12 is used to contact the road surface 8 ; The side wall of the stone body 1 includes a fixed wall 13 for fixing with the sidewalk 9 . The stone top wall 11 is provided with a top hole 14, and the fixed wall 13 is provided with a side hole 15, and the side hole 15 communicates with the top hole 14; the top hole 14 is pierced with a pipe one 2, and the side hole 15 is pierced with a pipe two 3. One 2, pipe two 3 are metal pipes. Pipe 1 2 and pipe 2 3 are internally connected to form an injection channel 4 , and the two ends of the injection channel 4 are the top opening of the top hole 14 and the opening of the side hole 15 respectively. The top hole 14 and the side hole 15 are prov...
Embodiment 2
[0048] A kind of construction method of high stability curb stone, has used the high stability curb stone of embodiment one, comprises the following steps:
[0049] Preparatory steps: set up an installation hole 81 for inserting the lower end of the pipe 12 on the road surface 8 .
[0050] Step S1: Move the curbstone between the road surface 8 and the sidewalk 9. Before moving, pull the pipe 2 3 out of the side hole 15, pull the pipe 1 2 to make the perforation 24 higher than the top wall 11 of the stone, and then insert the pipe 2 3 Perforation 24 and positioning groove 25, now pipe one 2, pipe two 3 are combined to form a handle, refer to Figure 6 , carry or hoist the stone body 1 through the combination of pipe one 2 and pipe two 3.
[0051] After transporting the stone body 1 to the vicinity of the installation position, remove the tube 2 3 from the tube 1 2, then move the tube 1 2 downward, insert the tube 2 3 into the side hole 15, and further insert the through hole 2...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com