The invention discloses a constructional measurement location method and a
system of a super-high-rise core tube wall. The method comprises the steps of setting a plurality of reference
control point around a reference layer of the core tube wall to form a reference
control network, arranging
laser plumb instruments on the reference control points to project vertical
laser light upwards, arranging a point position receiving device on an operation layer of the core tube wall to receive the vertical
laser light, calibrate
control point positions of the vertical
laser light as
pilot testing control points to form a
pilot testing
control network, arranging total stations and
prism combinations on the
pilot testing control points, measuring an angle and length of the pilot testing
control network by a closed
traverse measurement method, comparing the measured angle and the length of the pilot testing control network with the reference control network to check the pilot testing control points, and performing pilot testing on a wall
control line of an action layer by using the pilot testing
control point passing check and the pilot testing control network. The
system and the method solve the problems in wall measurement location when no horizontal structure serves as a carrier during vertical structure construction.