The invention relates to a
stress control production process of a high-strength aluminum
alloy pipe. The
stress control production process comprises the steps that a, an
extrusion mold is selected, the surface and size of the
extrusion mold are checked before installing, and the roundness tolerance of the mold cannot exceed 0.10 mm; b, the
extrusion mold is preheated, and the extrusion mold and an extrusion
barrel are preheated to 400 DEG C-450 DEG C; c, an aluminum
alloy hollow round
ingot casting blank is preheated, an
ingot casting is preheated to 400 DEG C-450 DEG C, and the
temperature difference of the head and
tail of the
ingot casting is controlled to be smaller than or equal to 30 DEG C; d, the
ingot casting blank is placed in the mold, extrusion is started, the extrusion speed is smaller than or equal to 1.0 mm / s, and the difference of a long shaft and a short shaft of the extruded
pipe is smaller than 2.50 mm; e, roll pre-straightening is carried out on a straightening
machine; f, offline
quenching is carried out, the
pipe is quenched through vertical
quenching equipment, during charging, aluminum wires are bound at the upper and lower proper positions of the pipe to reduce longitudinal bending generated after
quenching, and a penetrating rod is used for increasing the contact area and balancing the stress on the two sides of the wall thickness of the pipe; and g, stretcher straightening finishing is carried out, profiling stretch core cushions are arranged in the two ends of the pipe, an arc-shaped stretch jaw is used for carrying out tension stretching on the pipe, and the
stretch rate is controlled to be 1.0%-3.0%.