The invention belongs to the technical field of
building construction, and particularly relates to a
sewage well temporary jump drainage construction method which comprises the following steps that S1, firstly, a worker investigates the
sewage flow direction according to the current situation, meanwhile, a scheme and an
underground pipeline distribution diagram are determined, the jump drainage well position is placed, a steel protection cylinder is buried under the condition that the inclination is not larger than 0.5%-1%, the inner
diameter of the protection cylinder is 19-21 cm larger than the
pile diameter, and the steel protection cylinder is placed on a foundation; the top surface of the
pile casing is 20-30 cm higher than the construction ground; s2, a positive circulation drilling
machine is adopted, a geological profile map is drawn according to geological and hydrological data provided by the
construction design, different
drill bits, drilling pressures, drilling speeds and proper mud
specific gravity are selected for different geological stratums, and low-gear and low-speed drilling is suitable during drilling; through the contact between the
extrusion plate and the side walls of the
sewage pipe and the three-way
pipe, the
connectivity can be improved along with the distance between the sewage
pipe and the three-way pipe, connection between the sewage pipe and the three-way pipe is kept, support is provided for construction of a tunnel below a sewage well, and the influence on the project progress caused by sewage leakage is reduced.