The invention relates to a method for constructing a river and lake
levee breach closure with steel sheet piles, which can effectively prevent or control flood of rivers and lakes and reduce disasters. The invention adopts the technical scheme follows: firstly, driving border piles for
pier heads at two ends of a burst door, carrying out defending
processing on a U-shaped steel plate
pile wrappinghead to prevent from enlarging the burst door due to the
erosion of water; secondly, setting up a water sports platform floating bridge between every two burst
doors, wherein the water sports platform floating bridge is used as a marine piling platform and a
traffic channel for transporting steel plate piles; thirdly, constructing a
spur dike approaching the river on the upstream of the burst door to selectively remove deposition outwards and reduce the flow and the
erosion at a burst; and fourthly, carrying out closure and sealing on the steel plate piles, wherein the top of a
cofferdam is supported and defended by a layer of
joist steel in a
purlin enclosing way, middle longitudinal supports adopt H-steel and distributed at a distance of 5 m, sand pumped from the closured
cofferdam is backfilled, and the platform floating bridge is removed. The invention has the advantages of
rapid construction speed, high efficiency and quality, wide application range, simple method, easy construction and application, disaster reduction and huge economic and
social benefits and is effectively applied to blocking up bursts of rivers and lakes.