The invention relates to an anti-leakage treatment method at the conjunction of a pipeline and a well wall, which comprises the following steps: well mounting the pipeline on the well wall, and firstly using
asphalt to carry out crack pouring treatment on a mounting crack between the pipeline and the well wall to lead the mounting crack to be filled with the
asphalt; then
brush-
coating the
asphalt at the conjunction of the pipeline and the well wall, and leading the pipeline, the well wall, an asphalt crack pouring layer filled in the mounting crack and an asphalt
smear layer brush-coated at the conjunction of the pipeline and the well wall to be connected into a whole; and finally using waterproof
mortar to carry out
mortar finishing treatment on the periphery of the conjunction of the pipeline and the well wall. The invention further provides an anti-leakage device which comprises the asphalt crack pouring layer filled in the mounting crack between the well wall and the pipeline, the asphalt
smear layer smeared on the periphery of the conjunction of the pipeline and the well wall and a
mortar finishing layer smeared and covered outside the asphalt
smear layer. The method and thedevice can greatly reduce the leakage phenomenon at the conjunction of the pipeline and the well wall, effectively reduce the
rework phenomenon at the conjunction, improve the construction efficiencyand reduce the construction cost.