Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

55 results about "Operational readiness" patented technology

Operational readiness typically begins as a planning function early in the project lifecycle, and continues through to when the project becomes operational. Completion of operational readiness activities will usually be progressive and may also be staged along with project delivery as work packages, or sub-elements of work packages, are completed.

Process and apparatus for a combined casting and rolling installation

ActiveUS20110056649A1Rapid and advantageous mannerEasy to transportMetal rolling arrangementsEngineeringOperational readiness
A method and an apparatus for producing hot-rolled products in a combined casting-rolling installation. A method and a combined casting-rolling installation with which an uninterrupted continuous casting process can be maintained not only when there is a planned interruption to production but also when there is an unplanned interruption to production, occurring for example in a heating zone, a finishing mill train, a cooling zone or a storage device. This method steps are carried out to bridge an interruption in production in the part of the installation that is downstream of the cutting-up and delivering device (6): a) cutting off a strand portion (21) of the continuously produced preliminary material (3) by means of a first shears (9); b) raising the tail part of the strand portion (21) from the roller table (4) by means of a raising device (11); c) breaking up the preliminary material (3) passing the first shears (9) into pieces of scrap (19) by means of the first shears (9)into pieces of scrap (19) by means of the first shears (9), delivering the pieces of scrap (19) and removing the strand portion (21) unit the operational readiness of the combined casting-rolling installation is restored.
Owner:PRIMETALS TECH AUSTRIA GMBH

Compressed air supply system for a compressed air consumer circuit

In a compressed air supply system for a first compressed air consumer circuit such as an air spring system of a vehicle, a first compressed air line leads to the first compressed air consumer circuit and a distribution line leads to further consumer circuits. A priority valve arrangement is disposed between the first compressed air line, wherein the first compressed air line comprises no safety valve. The first compressed air consumer circuit can therefore be filled at a higher priority, and achieve operational readiness quickly in air spring processes such as lifting or raising activities.
Owner:WABCO GMBH

Alignment of operational readiness activities

An operational readiness alignment system is presented. A planning engine leverages readiness activities previous projects to determine which readiness activities are relevant to a current project. The planning engine can further correlate readiness activities with available team members to derive a responsibility matrix representing a recommendation on which team members should be assigned to which readiness activity roles or responsibilities. One can use the contemplated system to derive one or more readiness measures.
Owner:FLUOR TECH CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products