The invention belongs to the field of control systems, and particularly relates to a deduction data generation and action scheme deduction
system, method and device. The problems that an existing deduction method is too large in search tree construction and insufficient in action scheme deduction and generation efficiency can be solved. According to the method, an abstract chessboard is constructed based on scene space and environment rules, a reachable relation table is generated through preset maximum length limitation based on the current position of a task
execution unit and the abstract chessboard, and a decision track is generated based on the reachable relation table. A main path task
execution unit is selected to execute the main path and the abstract chessboard is updated based onthe decision track, a countering path is generated based on the updated abstract chessboard, the
decision area construction unit is repeated to generate the countering path until a new countering path cannot be generated, and deduction is completed. A
decision area is designed to replace search, the size of a search tree is reduced, a problem is easy to process in calculation, the dimensionalityof problem setting is reduced, and the deduction speed of an action scheme is increased.