The invention relates to a sealed formation testing process of a high
hydrogen sulfide well. The sealed formation testing process of the high
hydrogen sulfide well comprises an on-site installation process and an on-site formation testing process. According to the on-site installation process, the high
hydrogen sulfide well is sequentially connected with a fluid conveying pipeline, a
water jacket furnace and an oil-gas separator, wherein a gas outlet of the oil-gas separator is divided into two paths, one path is connected with a hoop
gate valve, a separator exhaust pipeline and an ignition
torch, and the other path is connected with the fluid conveying pipeline, the hoop
gate valve and an oil inlet of a sealed measurement tank. An oil outlet of the sealed measurement tank is connected with the hoop
gate valve, an anti-explosion oil conveying pump and an oil charging platform, and an exhaust port of the sealed measurement tank is connected with a
flange gate valve I, an oil catcher, a liquid separating bag, an exhaust pipeline, a back-fire
relief valve, a
flange gate valve II and an emission
combustion torch. According to the on-site formation testing process, mixed fluid entering the sealed measurement tank is separated in a slippage mode, separated liquid passes through the hoop gate valve and the anti-explosion oil conveying pump to the oil charging platform to be loaded on a vehicle and transported outwards, separated
sulfur-contained
natural gas passes through the
flange gate valve I, the oil catcher, the liquid separating bag, the exhaust pipeline, the back-fire
relief valve and the flange gate valve II to the emission
combustion torch.