The invention belongs to the technical field of transport connected roadways, in particular to a transport connected roadway improvement method. A transport connected roadway comprises a rock concentrated roadway and a rock rail roadway, wherein a tunneling stone gate is arranged on the rock concentrated roadway, and the transport connected roadway is arranged between the rock concentrated roadwayand the rock rail roadway; one end of the transport connected roadway is communicated with the tunneling stone gate. The tunneling transport connected roadway design of a working face is optimized, the transport connected roadway and the tunneling stone gate are designed on a straight line, a door poking position of the tunneling stone gate is designed to be a four-way door, the transport connected roadway is directly communicated with the concentrated roadway, the engineering quantity of the rock roadway is reduced, the roadway driving cost is reduced, the requirements of a mine for double effects, mechanization, automation, informatization, intelligentialization, level reduction, mining area reduction and staff reduction are met, the design concept of level, straight and simple roadwaydesign is fulfilled, the aim of achieving service and production in one step is achieved, the method is suitable for system optimization of newly prepared mining areas and working faces of the mine, and the method has good popularization value in the aspects of safety, economical efficiency, relieving of exploitation succession tension and the like.