The invention relates to a rebuilding reinforcing construction method for a rock
wool portable house. The method comprises the steps that S1, when it does not wind or rain, a portable house is rebuiltat an existing selected address, the herringbone roof slope is slowed down, and the eave stretching length of the portable house is decreased; S2, flat iron is arranged at the inner sides of
gable walls at the front and back parts and the upper portion of a truss roof for reinforcing, the two ends of the flat iron are bent and stretch into a foundation, and concrete is used for pouring; S3, square bricks are used on the herringbone roof on the top of each
gable wall for front-back right direct paving on the eave, and
mortar is used for pointing and top facing; S4, at the periphery of the house, besides a window and a
pedestrian path below the window, a pit is excavated and backfilled with planting soil, then, developed vines are planted, one
water pipe is connected, a geotechnical cloth is used for wrapping, the
water pipe enters the backfilled soil, water is supplied for thorough watering, and finally, a film is covered; then,
water supply irrigation is performed regularly in summerand spring, and the vines grow and
climb over the roof. The construction method improves the board room roof resistance.