The invention relates to a three-dimensional (3D) horizontal well borehole track controlling method, and belongs to the technical field of oil and gas
well drilling. The method comprises the steps of determining
well drilling parameters according to
well drilling equipment and formation
lithology; measuring a borehole parameter by measurement-while-drilling tools, revising a formation vertical depth by using geological
logging, designing points to be drilled according to known measuring points, regarding the vertical depth as a control target, continuously revising a 3D well section track until drilling to a 3D well section end turning direction; revising a target entering point vertical depth by using geological
logging again, performing two-dimensional well drilling to a target point, and performing horizontal section well drilling by using reservoir
lithology and horizontal section well inclining determination drilling tool
assembly. The 3D horizontal well borehole track controlling method disclosed by the invention has the advantages that firstly the conventional well drilling and directional equipment is used, the cost is quite low, and promotional values are available; secondly,
geosteering is performed by using conventional
logging, the track is revised continuously, and the shooting precision is greatly improved; thirdly, the design and construction are integrated, the site directional construction is operated easily, and directional engineers construct conveniently.