The invention belongs to the technical field of goaf gas extraction, and particularly relates to a Y-shaped ventilation working face goaf top
pipe gas extraction method. The method comprises the following steps that S100, on the side, close to a goaf, of a filling roadway, a telescopic jack is used for jacking a top
pipe obliquely upwards, and screen meshes are uniformly formed in the front end of the top
pipe; the whole top pipe is completely jacked, and large rocks are avoided in the pipe jacking process; S200, after the jacking of the top pipe is completed, a drainage pipe is prepared, the drainage pipe is quickly inserted into the top pipe, and the drainage pipe is fixed to prevent the situation that the hole sealing quality is affected by shaking; S300, after 5 minutes of hole sealing, a
polyurethane solution starts to foam and expand, the foam can permeate into the goaf through the screen meshes in the top pipe to block gaps, foaming is stopped after 20 minutes, and hardening and solidification are gradually carried out; and S400, after 1 hour of
polyurethane hole sealing, the drainage pipe is connected with an extraction pipeline for gas extraction, an observation hole and a valve are arranged on the extraction pipeline and are used for sampling gas, and
spontaneous combustion ignition marking gas is detected at any time.