The invention discloses a monitoring method for an original well, a receiving well and
pipe jacking construction. The monitoring method comprises the steps that (1), construction is prepared on site; (2), monitoring points are selected, and monitoring instruments are arranged on monitoring sections of the monitoring points; (3), monitoring frequency is made, and information is collected; (4), collected
information data are recorded, analyzed and treated, and a monitoring statement is obtained; (5), a monitoring warning index value is made; and (6), the reasonability and scientificity of the construction process are evaluated according to the monitoring statement and the monitoring warning index value. On the basis of common monitoring items, the monitoring items are combined organically, and the tested data can be mutually checked.
Continuous monitoring is conducted in
construction engineering to guarantee the continuity of the data; monitoring point arranging is reduced by utilizing the
system effect, so that the cost is saved; and by combining construction practice, the testing method and the types of monitoring elements are determined, and the arranging positions of the monitoring points are adjusted, so that the influence on the construction quality is reduced.