The invention discloses a base rock uplift region shielding tool-changing in-situ reinforcement method. The base rock uplift region shielding tool-changing in-situ reinforcement method comprises the steps that 1, micro-
pile isolation region construction is performed, namely micro-piles are arranged around a cutter disc of a
shield machine to form a rectangular isolation region, wherein the micro-piles of the rectangular isolation region are located in front and at back of the cutter disc of the
shield machine and on the left side and the right side of the cutter disc of the
shield machine respectively, the micro-piles located in front are 2 to 3 meters away from the cutter disc of the shield
machine, the micro-piles located at the back are 3 to 4 meters away from the cutter disc of the shield
machine, and the micro-piles located on the left side and the right side are 1.5 to 2 meters away from the cutter disc of the shield
machine; 2,
sleeve valve pipe grouting is conducted in the micro-
pile isolation region. A curtain is formed around the cutter disc of the shield machine by adopting the micro-piles, the formed curtain is the rectangular isolation region formed by the micro-piles arranged around the cutter disc of the shield machine, and
soil reinforcement is performed in the rectangular isolation region in the
sleeve valve pipe grouting mode to effectively prevent the
slurry leakage risk occurring in the grouting process, ensure effectiveness of grouting operation, avoid the influence on construction progress and reduce
safety risk.