A method for planting drought-resistant sugarcane
powder ridge cultivation. The planting steps are: (1) Prepare the plot according to the alternate
tillage pattern of narrow rows of
powder ridges and wide rows of no-
tillage; The depth of loose soil is 50-60 cm; the width of the wide row is 1.5-2.0 meters; (2)
plant sugarcane in two ridges in the narrow row by multi-
bud segment or single-row single-
bud segment, ensuring that there are 8-10 sugarcane per meter distance per
ridge Sprout; apply basal
fertilizer before planting or before planting; cover the crushed soil after planting, the thickness of the covered crushed soil is 3-5 cm, and cover with
plastic film as needed; (3) According to the traditional agronomic requirements, carry out intertillage soil cultivation and fertilization, intertillage By the way, weeds in the wide row are eradicated, buried or weeded with a weeding
machine; (4) Harvest according to conventional technical means or mechanical harvest and spray pesticides in time according to the information of diseases and
insect pests. This method adopts the alternating pattern of 'U'-shaped soil loosening in narrow rows of
powder ridges and no-
tillage in wide rows to reduce disturbance of the
soil surface of
cultivated land, establish planting and fallow farming areas, and make sugarcane more drought-tolerant.