The invention provides a method for developing a
heavy oil reservoir of a horizontal well by combining staged volume fracturing and fracturing filling. According to the method, firstly, a
steam injection well is deployed at the bottom of the oil reservoir; a production well is deployed at the middle upper part of the oil reservoir; then, the volume fracturing or fracturing filling operation is performed according to the
porosity degree and seepage rate distribution condition of the two
horizontal wells; then, the two wells form heat communication in a steam
throughput mode; next, the two wells transfer to continuous
steam injection production; and the production is stopped when the oil-steam ratio is lowered to 0.1. According to the invention, a fracture net
system is formed in a compact region by the volume fracturing, so that the seepage capability of the oil reservoir is improved; the fracturing filling process is used in a high-
porosity and high-permeability region for performing compaction so as to reduce a formation sand production phenomenon; the seepage mode of a low-permeability region oil reservoir is converted from the single seepage to the
sewage and fracture laminar flow; meanwhile, a high-permeability region is filled with small-grain-size sand for filling loose reservoir sandstone particle pores, so that the permeability near the production well is reduced,the oil reservoir
anisotropy is reduced and the whole oil reservoir can be uniformly used and developed.