The present invention provides a front steam turbine generator room combined with a side coal bunker and arranged at a high position. The machine room includes: a boiler, a side coal bunker room, an oxygen removal room, a first turbine generator, and a second turbine generator and a denitrification steel frame; wherein, a deoxygenation room is set on the side adjacent to the proximal end of the side coal bunker, a turbine room is set on the side adjacent to the deoxygenation room, and a second steam turbine is set in the turbine room generator, the second turbogenerator is provided with a high-pressure cylinder, a medium-pressure cylinder, a low-pressure cylinder, a low-pressure heater, a deaerator, a condenser, a condensate pump, and a first generator; and in the side coal bunker The side coal bunker frame is set on the side coal bunker frame, and a front machine room is set on the upper part of the side coal bunker frame, and the lower part of the side coal bunker frame is connected with the side coal bunker room, and the first steam engine room is installed in the front machine room. wheel generator. The invention reduces the occupied area of the front-end unit, saves high-temperature and high-pressure pipelines, can greatly reduce the investment of high-temperature pipeline systems, and improves the normal operation efficiency.