The invention discloses a
sludge superficial layer curing agent solidification continuous construction method. The curing agent and the
sludge are uniformly stirred, then the construction surface is compacted by using stirring equipment, the compacted construction surface is a construction unit, an iron plate is laid below an
excavator, the construction unit serves as an operation platform, and the
sludge in connected areas is continuously processed according to a construction mode of block-by-block construction and a well-shaped propulsion. The sludge solidification structure with relatively low
water content in china is to being buried in different places after being treated, a shallow-layer sludge consolidation continuously construction method is adopted in foreign countries, but geotechnical cloth, gravel and boards need to be laid on the surface of the solidified sludge so that the continuously construction can be carried out, the construction method only has the transverse construction and no the longitudinal construction, and the plate body stabilization layer is not provided with a plate frame structure. According to the construction method, with the
water content of more than 130%, the transverse and longitudinal construction method is adopted to realize the shallow-layer sludge consolidation continuous plate frame structure construction, and the construction is more flexible, simple and effective compared with the foreign countries.