The invention relates to a capability
analysis method suitable for a high-speed railway. The method specifically comprises the following steps: A, preparing data in four aspects of line infrastructure, a
train model, a
signal system and operation organization parameters; B, according to different access types, dividing partition divisions, specifically, dividing the partitions into five types including a
train receiving partition, a
train departure partition, a
station track partition, an interval partition and a line place partition; C, establishing different types of partition block time models under CTCS2 level and CTCS3 level based on the
signal system workflow and in combination with different operation scenes; D, analyzing the capacity of a
bottleneck link in operation of the high-speed railway, namely analyzing the capacity of the convergence line where the
bottleneck possibly occurs from two indexes, namely the worst train interval and the worst average minimum train interval,of a
station; and E, carrying out capability analysis on the section
station integration to obtain a most unfavorable section station integration operation plan.