The invention provides a method for measuring and verifying saved
electric power and electric quantity in boosting operation of a power distribution line. The method includes the following steps that: (1) project boundaries, agreed parameters and measured parameters are determined; (2) the loss of electric quantity is calculated; (3) an adjustment value Am is calculated; and (4) a calculation model of saved
electric power and electric quantity is established, and the saved
electric power and electric quantity are calculated. The method of the invention has high
operability. According to the method,
source data used in calculation are acquired with a
high frequency order, and therefore, theoretically, the numerical value of the
source data can reproduce actual conditions more authentically; the optimally-designed calculation model is used in combination, and therefore, the accuracy of
measurement and verification can be effectively improved; the calculation model of saved electric quantity has significant
time sequence performance and iterativeness, and therefore, a computer can be utilized to process a large quantity of acquisition data conveniently, and data introduction,
data processing and the calculation of the saved electric power and electric quantity in
measurement and verification processes can be completed automatically, the input of manpower and
material resources in
verification work can be greatly decreased, and
work time can be shortened.