The invention relates to a once molding construction method of a beam-
type conversion layer of a high-rise building by steel
pipe supporting and laminated pouring. The once molding construction method comprises the following steps of: determining a reinforcing
steel bar addition scheme of an auxiliary steel beam of a conversion layer and a first beam plate and a second beam plate lower than the conversion layer; mounting a template support frame of the second beam plate lower than the conversion layer, paving a template of the second beam plate lower than the conversion layer, manufacturing a reinforcing
steel bar structure of the second beam plate lower than the conversion layer, and pouring concrete to the second beam plate lower than the conversion layer; mounting a template support plate of the first beam plate lower than the conversion layer, paving a template of the first beam plate lower than the conversion layer, and manufacturing a reinforcing
steel bar structure of the first beam plate lower than the conversion layer; mounting the auxiliary steel beam of the conversion layer, mounting the template support frame of the beam plate of the conversion layer, paving the template of the beam plate of the conversion layer, and manufacturing the reinforcing steel bar structure of the beam plate of the conversion layer; pouring the concrete to the first beam plate lower than the conversion layer and the conversion layer; and dismantling the template support frame of the beam plate of the conversion layer, the auxiliary steel beam, and the template support frames of the first beam plate and the second beam plate lower than the conversion layer. According to the once molding construction method disclosed by the invention, supporting materials of the template can be reduced, the construction period is reduced, and the
engineering quality of the beam plate is ensured.