The invention relates to a
cushioning-banking protection and construction method which comprises a reservoir area ploughing sandy gravel
cushioning-banking ecological water-retention protection technology, a sliding track-based sand
cushion cloth scraping and dense-vibrating
system, a shaped hidden track-based
towing mold large-area concrete panel construction technology, a movable slope surface horizontal mold plate, a belt-moving baffle plate chute concrete pouring
system, a sliding vibration and flattening manner, a movable manual operation platform, a shaped track-based sliding type mold plate anti-scour tooth wall technology, a door type pouring, scraping and vibrating
system, a stretching type vibration scraping beam, and a prefabricated combined type non-dismantling mold plate anti-scour tooth wall. The problems of poor integrality, poor compactness and complicated construction of a traditional
cushioning-banking sand
cushion, and complicated construction, safety quality potential, mold plate installation, complicated disassembly process and large project amount during slope surface concrete panel and
retaining wall concrete pouring are effectively solved, the construction process is simple and practicable, the construction efficiency is greatly improved, and the method can achieve a good technique economic performance when being applied to practical
engineering.