The invention belongs to the technical field of construction of steel-concrete composite beam concrete bridge decks, and concretely relates to a steel-concrete composite beam concrete
bridge deck construction support and a construction method thereof. The support comprises support stand columns, a support cross beam, hanging rods, a bottom die and a construction channel. The number of the supportstand columns and the number of the hanging rods are multiple. The support cross beam is horizontally arranged, and the support stand columns are vertically connected below the support cross beam at intervals, the bottom die is horizontally connected below the plurality of support stand columns, the support cross beam is connected with the bottom die through the hanging rods, and the constructionchannel is connected to the lower portion of the bottom die. A
main bearing structure of a
bridge deck slab of a support method in existing
bridge deck construction is supported below the bridge deckslab, the whole support is of a pressed structure and is large in weight, the support is usually welded to or bolted to a steel plate beam,
coating of the steel plate beam is damaged, the support is arranged above the bridge
deck slab and mainly of a tension structure, the overall weight is small, the
welding position of the support and the steel plate beam is located on the non-
coating portion ofthe top face of the steel plate beam, and
coating is effectively protected.