The invention discloses a
continuous beam segment prefabricating and assembling method. The method comprises the steps: 1, arranging a cast-in-place continuous segment at the
pier top of a main
pier; 2, carrying out re dividing by combining a
continuous beam prestress full-length bundle anchor cable tensioning anchorage
pier design; 3, dividing the prefabricated simply supported beam sections according to the prestress; 4, performing
processing according to the shape and the length of the pier top
continuous beam; 5, assembling the prefabricated segment hoisting equipment on the cast-in-place continuous segment; 6, performing hoisting section by section according to section arrangement; 7, hoisting the sections; and 8, measuring the strength of the concrete, penetrating and pulling an anchor cable, performing tensioning, grouting and anchoring, and completing
system transformation. According to the continuous beam segment prefabricating and assembling method, traditional continuous beam
cantilever pouring construction is adjusted to ground construction from high altitude, segment prefabricating of a beam body is conducted on a prefabricating field, then the beam body is transported to the field segment by segment and hoisted to a preset position in a
cantilever progressive mode, and then prestress is applied to sequentially connect all segments into a whole; and finally, the mid-span wet joint is cast in place in a suspended formwork mode to complete beam body construction.