Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

102results about How to "Improve the level of refinement" patented technology

Annual power generation plan rolled decomposition optimization method taking balance between plan finishing rate and load rate into consideration

The invention discloses an annual power generation plan rolled decomposition optimization method taking balance between plan finishing rate and load rate into consideration; the method comprises the following steps: (1) determining a plan period and a plan parameter requiring the annual power generation plan rolled decomposition optimization; (2) establishing a security constraint machine set combined optimization model applicable to the annual power generation plan rolled decomposition; (3) using a mixed integer linear planning algorithm to calculate start and stop states, the plan load rate and the peak and valley active outputs of the machine set at each plan period; (4) implementing the security check, judging if all security constraints are satisfied; if all the security constraints are satisfied, going to step (5); if not all the security constraints are satisfied, adding a new out-of-limit element, and calculating sensitivity information of the newly added out-of-limit element, going to step (2). The disclosed method circularly optimizes and drafts the machine set start and stop plan as well as the machine set average plan load rate, drafts monthly, weekly and daily power generation amount plans of the power plant; the disclosed method ensures the execution of the annual power generation amount plant, and achieves the purpose of saving energy and reducing emission.
Owner:NARI TECH CO LTD +2

Day-ahead power generation plan photovoltaic power generation receiving capability analysis method based on SCED

InactiveCN103441535APrevent risks brought about by safe operation in advancePrevent risks from safe operationSingle network parallel feeding arrangementsPhotovoltaic energy generationPower gridPhysical model
The invention discloses a day-ahead power generation plan photovoltaic power generation receiving capability analysis method based on SCED. The day-ahead power generation plan photovoltaic power generation receiving capability analysis method based on SCED includes the following steps that based on a physical model and an economic model which access a power grid, under the condition that a regular unit booting and shutting scheme is known, an SCED model is set up; photovoltaic power stations in a zone serve as a specific analysis target, an optimized target of the SCED model is set to be maximum photovoltaic power generation total output power and an optimized model of photovoltaic power generation receiving capability analysis is obtained; non-linear factors in the model undergo linearization; the linear programming method is used for solving the model to calculate out an active power curve of receiving photovoltaic generation of a study area, the photovoltaic generation receiving capability of the power grid is obtained and the maximum grid connection power generating capability in an analysis period of all photovoltaic power stations is obtained. The day-ahead power generation plan photovoltaic power generation receiving capability analysis method based on SCED facilitates pre-control on risks generated after the power grid accesses large-scale photovoltaic power generation and improves safety of operation of the power grid.
Owner:NARI TECH CO LTD

Graphical inspection system and inspection method

The invention relates to a graphical inspection system and an inspection method. The inspection system is characterized by comprising an identification tag, a handheld intelligent terminal for identifying the identification tag, and a server in communicated connection with the handheld intelligent terminal, wherein the handheld intelligent terminal comprises an engine body, a touch display panel arranged on the front surface of the engine body, a tag identification module which is arranged in the engine body and is in communicated connection with the touch display panel, a processing module in communicated connection with the tag identification module, and a data archiving module in communicated connection with the processing module, the data archiving module is in communicated connection with the server, the processing module comprises a warning illustration module, a graphical inspection module, an intelligent line inspection module, a device location module, an exception management module and a statistical query module, which are all in communicated connection with the tag identification module. The inspection system has the beneficial effects of showing inspection or line inspection content in graphical form, effectively and intuitively reminding workers of carrying out specific activities, and effectively improving inspection efficiency and quality.
Owner:STATE GRID CORP OF CHINA +3

Power/electric-quantity balance index calculation method based on time-sequence running simulation

The invention relates to a power/electric-quantity balance index calculation method based on time-sequence running simulation. The method includes the steps of: power balance indexes and calculation,wherein monthly profit/loss control time periods and peak regulation control time periods are obtained by monthly running simulation data, then the profit/loss and peak regulation control time periodsare utilized to calculate the 11 types of monthly power balance indexes, the 11 types of monthly power balance indexes include system requirement capacity, system machine installation, nuclear powerutilization, energy storage utilization, hydropower utilization, thermal power utilization, peak regulation utilization, wind/light utilization, peak regulation insufficiency and other power indicators; and electric-quantity balance indexes and calculation, wherein fully-yearly and monthly total load demand, generated electric-quantity of various units, wind/light consumption quantity and utilization hour numbers of the various units are respectively calculated by results of running simulation of 8760 points, electric-quantity balance situations of a planning scheme are evaluated according tothe obtained indexes, and the electric-quantity balance indexes include system requirement electric-quantity, nuclear power generation, energy storage balance, hydropower availability, peak regulationgeneration, thermal power generation, wind/light availability and utilization hours.
Owner:TSINGHUA UNIV +3

Method for rapidly generating and solving model in power system operating simulation under security constraints

The invention relates to a method for rapidly generating and solving a model in power system operating simulation under security constraints, and belongs to the field of power system analysis. The method comprises the following steps: obtaining all information relating to all branches and nodes within an operating simulation time range, and calculating an original node impedance matrix, a load transfer distribution factor original matrix and a generator transfer distribution factor original matrix, considering all branches, of a power system; correcting the original node impedance matrix, the load transfer distribution factor original matrix and the generator transfer distribution factor original matrix according to daily power system branch states; solving outputs of various generators in various time periods according to a power system unit combination optimization model free of the security constraints, and judging whether one branch is in an overload or not again; and carrying out multiple iterations until no branch is in a flow overload, obtaining the outputs of the generators of considering the security constraints in the time periods, and finishing annual operating simulation results of considering the security constraints. According to the method, the power system operating simulation speed of considering the security constraints can be improved; large-scale operating simulation, considering the security constraints, of the power system is facilitated; and improvement of the refinement level of power system planning is facilitated.
Owner:TSINGHUA UNIV

Method for determining high-speed wind tunnel large aircraft model scale

The invention discloses a method for determining a high-speed wind tunnel large aircraft model scale and aims at solving the problems that an existing method for determining a large aircraft model scale is high in difficulty, high in costs and inaccurate. The method comprises the following steps of step 1, generating testing computational grids of different model elongations according to numerical simulation of a model; step 2, setting boundary conditions according to testing operating conditions; step 3, performing numerical simulation of testing conditions by utilizing a CFD (computational fluid dynamics ) calculation procedure and obtaining pressure distribution data of side walls; step 4, comparing the pressure distribution date with pressure distribution data of side walls of an empty wind tunnel, performing statistic analysis on the data and substituting the data into judgment criteria, determining the scale of the full elongation of the model and the width of a testing section to further obtain a proper model scale. The method for the high-speed wind tunnel large aircraft model scale determines the high-speed wind tunnel large aircraft model scale according to disturbance pressure distribution of the side walls of panels of the testing section and provides the basis for the formulation of a testing scheme and the design of a model.
Owner:AERODYNAMICS NAT KEY LAB +1

Power distribution network medium-voltage line differentiation planning method considering load prediction error uncertainty

By integrating the thought of regional differential division into distribution network planning, and fully considering uncertainty distribution of load prediction errors, the invention provides a differential uncertainty planning method for a 10 kV medium-voltage line in a low-load-density region. The method comprises the following steps: firstly, on the basis of a load prediction error probability characteristic model, a medium-voltage line planning mathematical model based on the opportunity constraint theory is constructed, and for the problem of the confidence level value in the model, thedifferential analysis is carried out on the anti-risk capability of the power distribution network in the region to be planned according to the comprehensive weighting method, and then a corresponding confidence level is selected for the power distribution network with different anti-risk capabilities. Compared with a traditional planning method, the method provided by the invention not only canachieve overall coordination of risks and cost, and the differentiation characteristics of the development of different distribution station regions in the low-load-density region are fully considered, and therefore the fine level of power distribution network planning is effectively improved. The correctness and effectiveness of the method provided by the invention are verified based on the simulation result of an actual example.
Owner:CHINA THREE GORGES UNIV

Strength check method for asphalt pavement

The invention discloses a strength check method for an asphalt pavement. The method comprises the step of carrying out planar isobaric / axial compression, planar isobaric / axial tension, planar tension-compression, planar compression / axial compression, planar tension-compression / axial compression, planar tension-compression / axial tension and planar anisobaric / axial compression tests on the basis of a three-axis test system and a three-axis test method for an asphalt mixture to obtain a multi-axis strength test result for the asphalt mixture. According to the new method for carrying out strength check on an asphalt pavement according to an asphalt mixture breakage criterion in a complex stress state, the problem that the existing one-dimensional strength theory is incapable of objectively reflecting the breakage characteristics and the resistance of a pavement structure is solved, and the refinement level of an asphalt pavement design is improved.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Classification method for areas with power supplied by power distribution network

Provided is a classification method for areas with power supplied by a power distribution network. The method is comprehensive, systematic and quantitative. The method includes the following steps of data collection, design objective grading function, design objective weight, comprehensive grading, and classification selection. The method includes a power supply area evaluation objective system covering two aspects of area developing levels and power utilization developing levels and the design objective grading function and weight, a classification comprehensive evaluation model for the areas with the power supplied by the power distribution network is built, and the method is comprehensive, systematic and quantitative on the basis of the model.
Owner:JIANGSU ELECTRIC POWER COMPANY YANGZHOU POWER +2

High-efficiency continuous machine tea refining automation production line

The invention provides a high-efficiency continuous machine tea refining automation production line. The production line comprises a fresh leaf conveying mechanism, an enzymes deactivating machine, anenzyme-denatured leaf conveying mechanism, a cooling and moisture-regain mechanism, a rolling machine leaf conveying mechanism, a four-machine linkage type mechanism, a dryer feeding conveying mechanism, a drying mechanism, a frying machine feeding conveying mechanism, a frying mechanism, an winnower feeding conveying mechanism, a wind-selection mechanism, a production line distribution controlsystem based on a programmable logic controller, a data acquisition and monitoring system, a process parameter expert decision-making system, and a process parameter precision control system. The production line implements a parameter automatic configuration scheme of a field bus technology and an expert decision-making library for the whole processing production line as a whole, the parameters ofeach link of the whole production process of tea can be automatically configured from the whole, and the equipment can be continuously controlled as a whole, the production line can improve the standardization, automation and refinement levels of tea processing, and effectively improves the quality of machined tea products.
Owner:ANHUI AGRICULTURAL UNIVERSITY

Hydropower station short-term refined peak regulation scheduling method

PendingCN110533236ALimit peak shavingRestricting the peak-shaving function of the hydropower station to give full play to the peak-shaving functionForecastingComplex mathematical operationsPower gridGenerating unit
The invention relates to a hydropower station short-term fine scheduling method, and belongs to the technical field of power generation scheduling of power systems. According to the method, the minimum peak-valley difference of the residual load of a power grid is taken as a target, the influence of reservoir operation constraints, unit operation constraints, power constraints and head changes onthe power generation and water pumping characteristics of the pumped storage hydroelectric generating unit is comprehensively considered, and the purpose of improving the fine level of dispatching isachieved. For nonlinear factors such as a nonlinear multi-objective function, a unit power generation and hydropower constraint, a water turbine dynamic characteristic constraint, a water pump dynamiccharacteristic constraint and a unit operation state constraint in a scheduling model. A corresponding linearization processing strategy is provided, an original model is converted into a standard mixed integer linear programming model, and then the model is solved. The method gives full play to the peak shaving effect of the pumped storage hydropower station in the power grid, improves the refinement level of power grid dispatching, and guarantees the safe and stable operation of the power station.
Owner:YUNNAN POWER GRID

Power support capacity distribution method of different DC lines in multi-DC system

The invention discloses a power support capacity distribution method of different DC lines in a multi-DC system, and belongs to the technical field of an electric power system and automation thereof. The method comprises: calculating the contribution of the different DC lines in improving transient power angle stability, the DC line maximum voltage controllable amount satisfying voltage safety constraints, and a support capacity integrated contribution index of each DC line, then determining a power support capacity distribution mode, and performing power support capacity distribution on each DC line. The method provided by the invention can be used for solving the problems of priority order determination and support capacity distribution of DC emergent power support of a multi-DC system, is helpful in fully utilizing the controllability characteristic of the DC system, improves transient stability of the system, prevents motor tripping or reduces motor tripping, and improves operation economic benefits and safety of an electric power system.
Owner:STATE GRID CORP OF CHINA +2

Multi-stage wind power accepted range calculating method based on unit combination and economic dispatching

The invention discloses a multi-stage wind power accepted range calculating method based on unit combination and economic dispatching, comprising an annual planning stage, a monthly planning stage, and a current planning stage. A, in the annual planning stage, a mathematical model for solving the maximum wind power installed capacity which can be accepted by a region and the minimum wind power installed capacity which must be accessed to the region is established by using regional typical load curve data and based on an economic dispatching optimization method; B, in the monthly planning stage, a mathematical model for solving the maximum wind power which can be accepted by the region and the minimum wind power which must be accessed to the region is established by using monthly load prediction data and based on the economic dispatching optimization method; and C, in the current planning stage, a mathematical model for solving the maximum wind power which can be accepted by the region next day and the minimum wind power which must be accessed to the region next day is established by using recent load prediction data, recent wind power prediction data and a monthly thermal power unit start-stop optimization result and based on the economic dispatching optimization method.
Owner:NARI TECH CO LTD +2

A step-by-step optimization method and a step-by-step optimization system for medium-and-long-term electric quantity safety correction

The invention discloses a step-by-step optimization method for medium and long term electric quantity safety correction. The method comprises the following steps of collecting information required bymedium and long term electric quantity safety correction; based on the collected information, establishing a power flow checking optimization model for medium and long term electric quantity safety correction by taking the minimum power flow out-of-limit amount of the power transmission section as an objective function; calculating a power flow checking optimization model, and judging whether theelectric quantity plan meets power grid safe operation requirements or not according to a power flow checking optimization result; and in response to the condition that the electric quantity plan doesnot meet the safe operation requirement of the power grid, establishing an electric quantity plan optimization model for medium-and-long-term electric quantity safety correction by taking the minimumadjustment of the starting and stopping states of all generator sets as an objective function, and correcting the electric quantity plan. Compared with traditional experience correction, the method greatly improves the refinement level of power grid dispatching, and provides technical support for increasingly complex trans-provincial and intra-provincial dispatching plan compilation.
Owner:NARI TECH CO LTD +2

Model and flow mounting method and device

The embodiment of the invention provides a model and flow mounting method and device, and relates to the technical field of engineering management. The method comprises the steps of displaying an initial interface, wherein the initial interface comprises a BIM model, when a binding instruction triggered when a user clicks a component to which a preset flow needs to be added on the BIM model is detected, displaying a construction set name input interface, wherein the construction set name input interface comprises a textbox; after construction set name information corresponding to the componentinput by the user into the textbox is obtained, displaying a flow selection interface, wherein the flow selection interface comprises at least one preset flow; then, when it is detected that the userclicks a target flow in at least one preset flow, displaying an information input interface corresponding to the target flow, obtaining target information input by the user in the information input interface, and generating target flow information bound to the BIM model so as to achieve the purpose of binding the BIM model to the target flow. The searching time is shortened, and the refined leveland management efficiency of project management are improved.
Owner:毕埃慕(上海)建筑数据技术股份有限公司

Method and device for wind turbine generators participating in power grid emergency control

The invention discloses a method and device for a wind turbine generators participating in power grid emergency control. The emergency control system comprises a plurality of wind turbine generators and an energy storage system. The emergency control method comprises steps that the control measure quantity of the emergency control system is determined according to the different fault information;the control measure quantity is distributed to each wind turbine generator to obtain the measure quantity corresponding to each wind turbine generator; the adjustment quantity of an energy storage system is determined according to the execution condition of each wind turbine generator on the measure quantity. The device and the method are advantaged in that the active and reactive power rapid adjustable capabilities of a wind turbine generator inverter are utilized, the wind turbine generators are incorporated into the power grid emergency control system, and the power grid emergency control resources can be improved.
Owner:NARI TECH CO LTD +3

Neighboring grid power transmission line icing prediction method based on altitude factor

The invention discloses a neighboring grid power transmission line icing prediction method based on an altitude factor. The method comprises the steps of setting a numerical mode grid, calculating the grid point altitude, determining neighboring grid parameters, ordering the altitude, predicting grid point icing, calculating the altitude of 0 DEG C and predicting icing of prediction points. The neighboring grid power transmission line icing prediction method based on the altitude factor has the advantages of being capable of predicting the icing situation of micro terrain areas, high in applicability, high in prediction accuracy and high in prediction efficiency.
Owner:STATE GRID HUNAN ELECTRIC POWER +2

Urban garden patrol management and maintenance system capable of realizing field operation data through mobile phone

PendingCN110719366AAccurately grasp the employment situationAccurately grasp the real-time locationChecking time patrolsData processing applicationsEnvironmental resource managementStatistical analysis
The invention discloses an urban garden patrol management and maintenance system capable of realizing field operation data through a mobile phone, and belongs to the technical field of landscaping management. The system comprises a mobile phone APP terminal, and the output end of the mobile phone APP terminal is electrically connected with the input end of a personnel login module. According to the urban garden patrol management and maintenance system capable of realizing field operation data through the mobile phone APP,a garden event data collection unit, a data information integration management unit, a PC management terminal and a feedback module are arranged, so that the construction of a more complete landscaping event disposal process is facilitated; on the basis, the acquired various data information is subjected to service comprehensive analysis; management personnel are helped to accurately grasp the on-duty condition, the real-time position and the motion trail of departmentpersonnel, meanwhile, a flexible data statistical analysis function is provided, the problems that field personnel are difficult to supervise in the working process, extensive in management, inconvenient to check attendance and the like are solved, and the scientific and refined level of personnel management is improved.
Owner:北京智城同创科技有限公司

Engineering management system based on WBS modeling

ActiveCN112508525AEasy to superviseImprove the level of refinement and efficiencyGeometric CADOffice automationThree dimensional modelVisulation
The invention relates to the technical field of engineering management, in particular to an engineering management system based on WBS modeling, and the system comprises: a three-dimensional model module which is used for building a BIM three-dimensional model of construction engineering, the BIM three-dimensional model is composed of a plurality of engineering components, and each engineering component builds a WBS structure tree task of engineering quantity; the encoding module that is used for encoding the engineering component; the management platform that is used for managing the construction progress of the engineering component and managing the engineering component according to the encoding module; and the information platform that uses the notification of the planned constructionprogress of the engineering component and the filling of the actual construction progress. According to the engineering management system based on WBS modeling, visual management is carried out on theconstruction plan, the construction progress is convenient to monitor, and it is guaranteed that an engineering project is completed according to quality and quantity.
Owner:GUANGXI ROAD & BRIDGE ENG GRP CO LTD

Self-recognition and storage device for electric energy meter

The invention discloses a self-recognition and storage device for an electric energy meter, which comprises a storage rack, a camera, a barcode and a screen, wherein the panel part of the storage rack has an inclined structure, the panel is provided with multiple storage positions for placing electric energy meters, a unique barcode is attached to each corresponding storage position, and lookup is facilitated; the screen is arranged beside the storage rack, the screen is used for displaying the storage state of the storage position in the storage rack, and the storage position storage state in the current storage rack is checked conveniently; the camera is arranged above the storage rack, the camera can irradiate on the whole panel part of the storage rack, and the camera is used for recognizing the electric energy meter and the barcode information in the storage position and building a storage position relationship. The loading condition of all storage positions in one storage rack range can be monitored at the same time, the electric energy meter placing and removing actions can be analyzed intelligently, and information processing on the in-out device is completed automatically; intelligence on storage in and out of the electric energy meter can be met, the working process of an operator is simplified, and the fine management level and the decision quality of the electric energy meter can be improved.
Owner:JIANGSU FRONTIER ELECTRIC TECH +2

Intelligent prediction method for power transmission line engineering cost based on single-base tower

The invention provides a single-base-tower-based intelligent prediction method for the construction cost of a power transmission line. The method comprises. The method comprises the following steps:.The method comprises the following steps: constructing an empirical parameter prediction model in combination with empirical parameters of a least square support vector machine model; optimizing parameters in the prediction model by using a particle swarm optimization algorithm to obtain a particle swarm optimization least square support vector machine prediction model; and taking the original data as an input variable, inputting the original data into the optimized vector machine prediction model, and training the vector machine prediction model to obtain a cost prediction value of the singlebase tower. According to the method provided by the invention, dimension reduction processing is carried out on indexes by utilizing a principal component analysis method; a particle swarm algorithmis innovatively introduced to perform parameter optimization on a least square support vector machine model to obtain optimal parameters, and the obtained principal component data is imported into anempirical parameter prediction model and an optimized parameter prediction model for training and prediction, so that the accuracy of cost prediction can be improved, and the refinement level of costmanagement is improved.
Owner:STATE GRID SICHUAN ECONOMIC RES INST

Step-by-step optimization method for real-time generation scheduling closed-loop control

ActiveCN104361401AImprove advanced pre-control capabilitiesTake full advantage of conditioningForecastingInformation technology support systemControl modePower grid
The invention discloses a step-by-step optimization method for real-time generation scheduling closed-loop control. The method includes the steps of acquiring various optimization data and determining an optimization space for real-time generation scheduling closed-loop control; respectively building an active power optimization model and a control mode optimization model for real-time generation scheduling closed-loop control; when unit adjusting capacity in a system is insufficient, enabling an active power optimization module to adjust unit output scheduling so as to achieve optimization and transfer of adjustable capacity; if the unit adjusting capacity still cannot satisfy requirements, enabling a control mode optimization module to adjust a control mode of a unit so as to supplement the adjustable capacity level of the system; after step-by-step optimization, obtaining a reasonable real-time generation scheduling closed-loop control result finally. The step-by-step optimization method has the advantages that more reasonable invoking of control resources by a power grid is benefited, and the power grid scheduling fining level is improved.
Owner:NARI TECH CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products